OPS 571 Final Exam Guide (New, 2019)

For more course tutorials visit www.newtonhelp.com

1.

Which of the following is a measure of operations and supply management efficiency used by Wall Street?

Dividend payout ratio

Receivable turnover

Current ratio

Financial leverage

Earnings per share growth


2.

An activity-system map is which of the following?

A diagram that shows how a company's strategy is delivered to customers

A timeline displaying major planned events

A network guide to route airlines

A facility layout schematic noting what is done where

A listing of activities that make up a project

3.


Which of the following is a total measure of productivity?

Output/Materials

Output/Labor

Output/(Labor + Capital + Energy)

All of these

Output/Inputs

4.

Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service?


Quality approach

Self-service approach

Production-line approach

Do-it-yourself approach

Personal-attention approach

5.

Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together?

Workcenter layout

Production line layout


Group technology layout

Manufacturing cell layout

Assembly line layout

6.

Which of the following is a characteristic that can be used to guide the design of service systems?

Services are all similar.

Services cannot be inventoried.

Services businesses are inherently entrepreneurial.

Even service businesses have internal services.


Quality work means quality service.

7.

An advantage of a make-to-stock process is which of the following?

All units of output are unique.

It features rapid delivery of a standard product.

It combines the best features of other processes.

It responds directly to customer orders.

It allows the firm to avoid inventory costs.


8.

Getting an autograph from a famous person might involve standing in which type of queuing line structure?

Single channel, single phase

None of these

Single channel, multiphase

Multichannel, multiphase

Multichannel, single phase

9.

For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals?

2.5 hours


5 hours

0.2 hour

0.1 hour

None of these

10.

An assumption of learning curve theory is which of the following?

Organizational learning is not included in learning theory.

The time required to do a task will vary randomly each time the task is repeated.

Unit time will decrease at an increasing rate.

Learning will not be transferred from one worker to the next.


The reduction in unit time will follow a predictable pattern.

11.

A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units to date. A process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process?

Before the 100th unit

Before the 120th unit

Before the 80th unit

Before the 50th unit


Before the 250th unit

12.

For which of the following should we use a p-chart to monitor process quality?

Grades in a freshman "pass/fail" course

Temperatures in a classroom

The dimensions of brick entering a kiln

The weight of fluid in a container

Lengths of boards cut in a mill


13.

You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation?

42

68

89

47

94


14.

Which of the following is a fixed-time-period inventory model?

Just-in-time model

The EOQ model

Periodic system model

The Q model

The least cost method

15.

A company is planning for its financing needs and uses the basic fixed-order-quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inventory of $150?


None of these

$1,501,600

$1,498,200

$499,313

$500,687

$1,501,600

Q = 400. Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600.

16.

Which of the following is a principle of work center scheduling?


Reschedule every day.

Once started, a job can and should be finished even if unavoidably interrupted.

Assign the first worker to all of the days that require staffing.

Achieve certainty in standards and routings.

Give work centers less to do then their maximum.

17.

Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints?

Identify system constraints.


Support system constraints.

If you have no system constraints, make some.

Reduce system constraints.

Reinforce system constraints.

18.

In designing a lean production facility layout, a designer should do which of the following?

Locate flexible workstations offline.

Balance capacity using job shop analysis.

Design for work flow balance.

Always keep operations on a single floor of the factory.


Link operations through a push system.

19.

A simple project listing of five activities and their respective time estimates are presented here:

Using CPM, which activities make up the critical path?

None of these

A, B, D, E

A, D, E

A, C, B, D, E

A, C, D, E


20.

A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here:

Using CPM, which activities make up the critical path?

A, C, B, F, E

None of these

A, B, D, F, G

A, C, E, F, G

A, D, E


21.

Which of the following is not a problem definition tool from the operations consulting tool kit?

Issue trees

Five forces model

Computer simulation

Customer surveys

Gap analysis

22.

Which of the following is not one of the basic types of forecasting?


Simulation

Causal relationships

Qualitative

Time series analysis

Force field analysis

23.

A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data?

3

1


15

123

5

C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5.

24.

From an operational perspective, yield management is most effective under which of the following circumstances?

Inventory is perishable.

The firm doing yield management is very profitable.

Demand cannot be segmented by customer.


Fixed costs are low, and variable costs are high.

The customer is a "captive" of the system.

25.

What is transaction processing?

The decision support system used to efficiently handle multiple transactions

The movement of paperwork through a system using a decision tree

The scheduling of machinery to minimize time and scrap

The posting and tracking of the detailed activities of a business

26.


If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?

0.75

1.00

1.25

1.33

100

27.

Which of the following is an input to the master production schedule (MPS)?

Planned order schedules


The bill of materials

The aggregate plan

The exception report

Inventory records file

28.

Which of the following is considered a primary report in an MRP system?

Cycle counting reports

Performance reports

Planned order schedules

Planning reports


Exception reports

29.

The centroid method for plant location uses which of the following data?

Probabilities and payoffs

Correlation matrix of existing facilities

Volume of goods to be shipped between existing points

Inbound transportation costs

Transport times between facilities


30.

In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following?

Responsive

Forward looking

Efficient

Risk hedging

Agile

1. Identify a disadvantage of implementing group technology in a firm.


The number of employees required for a process increases exponentially.

The workers must be flexible enough to run several machines and processes.

It increases inventory.

The waiting time between operations is increased.

2. A shopkeeper purchases raw materials to manufacture souvenirs for a local event that happens once every five years. In this case. identify the model that the shopkeeper is most likely to use to maintain stock.

Lot sizing model

Fixed—time period model

Fixed—order quantity model p.

Single-period model

3 Define synchronous manufacturing as stated by Goldratt's theory.


It is a production process organized to achieve the goals of the firm.

It is an integrated set of activities designed to achieve high quality and high levels of production with minimal inventories of raw materials.

It is a production process in which machines are the critical resource used for scheduling.

It is the optimization of the rate at which cash is generated by production through sales.

4. involves testing random samples of the end product from a process to determine if the process is churning out items within the predetermined range.

Organizational leaming

Statistical process control

Cyclical strategic scheduling

Event simulation


5. Utilization is the ratio between the actual amount of time a resource is activated for and the total amount of time the resource is available for use.

Utilization

Lead time

Service rate

Pacing

6. The manager of a shop floor schedules production based on the equipment that are used in the process as a key resource. In this case. the manager is most likely using a

backward scheduling

forward scheduling

machine-limited process

labor-limited process


7 Define lead time.

It is the time required to achieve high customer service with minimum levels of inventory investment.

It is the time required to produce a variety of products typically at lower volume levels.

It is the time required to attend to a customer order.

It is the time required to position inventory in the supply chain.

8. refers to the integrated activities designed to achieve high quality and high levels of production with minimal inventories of raw materials and to eliminate wastes.

The Shingo system

Kanban system

Lean production

Process mapping


9. Define preventive maintenance.

It is the grouping of similar parts and processes into a specialized workcell.

It is the improvement that stems from both a person's experience and the changes in equipment. product design. and administration.

It is the periodic inspection and repair of equipment to avoid breakdowns.

It is the emphasis of getting a product or a process right the first time.

10. shows the relationship between the total number of units produced and the unit production tim

A Poisson distribution

A learning curve

Cycle time

Service rate


11 Identify a true statement about services.

A service is a tangible process.

A service is inherently heterogeneous

A service has physical dimensions.

A service has very limited or no customer interaction.

12. In a the product remains in a specific location and the equipment labor and material required for the product are gathered to the specific location

project layout

functional layout

manufacturing cell

workcenter


13. Rachel performs an analysis in which she analyzes the performance of the clients of her organization relative to the expectations of the client's customers. In this scenario. Rachel is most likely using a

Pareto analysis

gap analysis

Gantt chart

bar chart

14. is the design operation and improvement of the processes that create and deliver a company's essential products and services.

Inventory control

Operations and supply chain management

Product routing

Aggregate sales and operations planning


15. determines the amount of inventory, which includes parts. components. and materials. necessary to produce a product

Break-even analysis

Dynamic programming

Material requirements planning

GAP analysis

16. Define customer order decoupling point.

It involves the analysis of current business data to better solve business problems using mathematical calculations.

It is the time required to attend a customer order.

It is the positioning of inventory in a supply chain.

It illustrates the method by which a company's strategy is delivered through a set of supporting activities.


17. Define waste reduction.

It is the process of combining the concept of cross-docking and consolidation.

It is the elimination of non—value-adding activities and the optimization of value-adding activities that are part of a process.

It is the optimization of the rate at which cash is generated by production through sales.

It is the integration of activities to increase the customer value of a process.

18. Identify the true statements about the learning curve theory.

It assumes that the unit time for a task will decrease at a decreasing rate.

A drawback of the learning curve theory is that the performance can be measured only in terms of time per unit.

In a learning curve. the time for task completion will increase each time the task is undertaken.


In a learning curve the reduction in time will be unpredictable.

19. is the characteristics of a product in terms of quality that are sorted as either conforming or nonconforming to specification.

The capability index

A throughput rate

A learning curve

An attribute

20. Identify a true statement about an operations consulting process.

Its results are immediately measurable.

It leads to changes in attitudes and culture of an organization.

Unlike general management consulting. operations consulting does not require extensive interviewing of employees.


It takes a longer time than general management consulting to yield results that can be measured.

21. Identify a true statement about water transportation mode.

It is a highly specialized mode of transport limited to the delivery of gases-

Moving high volumes of products is costly.

It can handle a high capacity of materials.

Fast transit times can be achieved in this mode of transportation.

22 A pharmaceutical company keeps detailed documentation of its inventory. The company replenishes its inventory whenever the inventory level falls below a certain limit and there is a threat of a stockout. This company is most likely using a model.

fixed-order quantity

fixed-time period

regression


single-period

23. According to Goldratt's definition, is the rate at which cash is generated by production through sales.

expediting

throughput

productivity

cash flow

24. Identify an advantage of pure projects.

Team pride, motivation, and commitment are high.

Team members have authority over the project.

Organizational goals and policies are upheld.

Duplication of resources is eliminated


25. are used for decisions that are related to aggregate and strategy demand-

Process assessments

P-models

Periodic review systems

Strategic forecasts

26. Identify a disadvantage of pure projects.

Equipment and people are not shared across projects.

A lot of time is consumed while making decisions.

Lines of communication are lengthened.

The project manager has no authority over the project.


27. is responsible for scheduling, dispatching, monitoring, and regulating production on the shop floor.

Manufacturing execution system

P-model

ABC classification

Enterprise resource planning

28. is the average time required to finish a cycle of an operation.

Cycle time

Lead time

Queue time

Changeover time


29. A manufacturing firm efficiently assembles an airplane by bringing all the necessary raw materials, parts, and equipment to a central location. This scenario illustrates a

functional layout

workcenter

manufacturing cell

project layout

30. The main objective of the aggregate operations plan is to:

achieve better integration between suppliers and manufacturers.

minimize the cost of resources necessary to meet demand.

determine future demand with the help of past data.

keep demand and supply in balance. ===============================================

OPS 571 Final Exam Guide (Jan, 2019)


For more course tutorials visit www.newtonhelp.com

Which of the following is a measure of operations and supply management efficiency used by Wall Street?

Current ratio

Receivable turnover

Financial leverage

Earnings per share growth

Dividend payout ratio

When a company seeks to match the benefits of a successful position while maintaining its existing position in offering customers a variety of differing services, what is this process called?


Inter-functional analysis

Order qualifying

Order winning

Straddling

Operations capability analysis

Which of the following is a total measure of productivity?

Output/(Labor + Capital + Energy)

Output/Labor

All of these

Output/Materials


Output/Inputs

In the service-system design matrix, a face-to-face total customization service encounter is expected to have which of the following?

Low degree of customer/server contact

None of these

Low production efficiency

High production efficiency

Low sales opportunity

We would expect to see in a manufacturing cell layout which of the following?


None of these

Long production setup times

Large teams who collectively do a small part of a finished product

A small team of workers who turn out complete units of work

More in-process inventory

Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?

Capacity decisions are much more critical in manufacturing operations.

Manufacturing is far more capital intensive than services.

The service process and service product can be developed independently.


The service package has the same legal protection available to manufactured goods.

The service package is the major output of the development process.

The customer order decoupling point determines the position of what in the supply chain?

Orders

Transportation facilities


Inventory

Customers

Manufacturing facilities

Machine breakdown and repair in a 12-machine factory having one repair mechanic would develop which type of queuing system line structure concerning machine breakdowns?

Single channel, single phase

None of these

Multichannel, single phase


Single channel, multiphase

Multichannel, multiphase

Assume the service rate for a queue in a truck-loading operation is 2 trucks per hour. Using the infinite queuing notion for the models presented in the textbook, which of the following is the average service time?

0.25 hour

0.5 hour

2 hours

1 hour

None of these


An assumption of learning curve theory is which of the following?

Unit time will decrease at a decreasing rate.

Unit time will hold constant.

Unit time will increase at an increasing rate.

Unit time will increase at a decreasing rate.

Unit time will decrease at an increasing rate.

The unit improvement factor for a 60 percent learning curve at 25 units is 0.0933. The first and second timings of a person doing a job are 5 minutes and 3 minutes respectively. Which of the following is the learning-adjusted time estimate for unit number 25?

0.0933 minute

9.33 minutes


3 minutes

4.665 minutes

0.4665 minute

For which of the following should we use a p-chart to monitor process quality?

Letter grades on a final examination

Temperature of entrees in a restaurant

Weight errors in cans of soup

Errors in the length of a pencil

Defective electrical switches


You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation?

94

68

42

47

89

Which of the following is a fixed-order-quantity inventory model?


P model

Periodic replenishment model

The ABC model

Economic order quantity model

Cycle counting model

Using the fixed-order-quantity model, which of the following is the total ordering cost of inventory given an annual demand of 36,000 units, a cost per order of $80, and a holding cost per unit per year of $4?

$1,889

$2,267

$849


$2,400

$1,200

Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule. The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days. Which job should be scheduled first if you use the SOT priority rule for job sequencing?

E

B

C

D

A


Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints?

Reinforce system constraints.

If you have no system constraints, make some.

Identify system constraints.

Reduce system constraints.

Support system constraints

In implementing a lean production system you should work with suppliers to do which of the following?

Make frequent deliveries.


Calculate lead times.

Achieve bottom-round management.

Freeze windows.

Use quality circles.

For an activity in a CPM analysis, the early finish time is 20 and the late finish time is 20. Which of the following statements is true?

The slack for this activity is 20.

The activity's late start must happen before its early start.

The activity is on the critical path.

The duration of this task is 20.

The duration of this task is zero.


You have been placed in charge of a large project. Shortened communication lines are required to ensure quick resolution of problems as they arise. You recognize that the project is going to take a lot of time and require a lot of team pride, motivation, and commitment by all members. Which project management structure should you use in this situation?

Pure project

PERT

Task force

Functional project

Matrix project

Which of the following is not a principle of reengineering?


Capture information many times, at the source and where it is interpreted.

Treat geographically dispersed resources as though they were centralized.

Merge information processing work into the work that produces the information.

Link parallel activities instead of integrating their results.

Organize around outcomes not tasks.

Which of the following forecasting methodologies is considered a qualitative forecasting technique?

Simple moving average

Market research


Exponential smoothing

Linear regression

Multiple regression

A company wants to generate a forecast for unit demand for year 2014 using exponential smoothing. The actual demand in year 2013 was 120. The forecast demand in year 2013 was 110. Using these data and a smoothing constant alpha of 0.1, which of the following is the resulting year 2014 forecast value?

111

100

114

120

110


Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inventory levels, order backlogs, and allowing lost sales is which of the following production planning strategies?

Full employment

Stable workforce, variable work hours

Skill maintenance

Level

Chase

What are two of the main objectives of ERP?

Transaction processing and logistic optimizing


Resource tracking and master schedule planning

Product tracking and customer invoicing

Transaction processing and decision support

If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

133 percent

25 percent

100 units per hour

125 percent

75 percent


Under the lot-for-lot (L4L) lot sizing technique as used in MRP, we would expect which of the following?

A consistent lag of supply behind demand

Minimized carrying costs

Minimized setup costs

Minimized quality problems

A just-in-time management philosophy

A product tree can do which of the following?

Help to compute component usage.

Reduce product scrap.


Reduce regular time labor.

Locate raw material supplies.

Reduce labor overtime.

Very few products are moved without at least part of their journey being by which mode of transportation?

Rail

Highway

Pipeline

Water

Air


In Hau Lee's uncertainty framework to classify supply chains, a supply chain for innovative products with an evolving supply process is called which of the following?

Responsive

Efficient

Agile

Risk hedging

Forward looking

1. The total output from a production system in one day is 500 units and the total labor necessary to produce the 500 units is 350 hours. Using the appropriate productivity measure, which of the following numbers represents the resulting productivity ratio?


2. When a company seeks to match the benefits of a successful position while maintaining its existing position in offering customers a variety of differing services, what is this process called?

3. Which of the following is a measure of operations and supply management efficiency used by Wall Street?

4. Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service?

5. A difference between project and continuous flow categories of process flow structures is which of the following?

6. Which of the following is a characteristic that can be used to guide the design of service systems?


7. An advantage of a make-to-stock process is which of the following?

It features rapid delivery of a standard product

8. Which of the following production process terms best describes the situation when activities in a stage of production must stop because there is no work?

9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals?

10. An assumption of learning curve theory is which of the following?


11. A company's production process has an 85 percent learning curve rate. The process has produced 1,000 units to date. A process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the very first unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process?

12. For which of the following should we use an R-chart to monitor process quality?

13. In setting up a Kanban control system you need to determine the number of kanban card sets needed. If assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?

120

14. Using the ABC classification system for inventory, which of the following is a true statement?


15. A company is planning for its financing needs and uses the basic fixed-order-quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inventory of $150?

16. The assignment method is useful in solving scheduling problems that have which of the following characteristics?

There are no jobs to be distributed to n machines or workers.

17. According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

18.

Which of the following are related to lean production?


19. A simple project listing of five activities and their respective time estimates are presented here:

Using CPM, which activities make up the critical path?

20. You have been placed in charge of a large project. Shortened communication lines are required to ensure quick resolution of problems as they arise. You recognize that the project is going to take a lot of time and require a lot of team pride, motivation, and commitment by all members. Which project management structure should you use in this situation?


21. One of the principles of reengineering is which of the following?

22. Which of the following forecasting methodologies is considered a qualitative forecasting technique?

23. A company wants to forecast demand using the simple moving average. If the company uses three prior yearly sales values (i.e., year 2011 = 130, year 2012 = 110, and year 2013 = 160), which of the following is the simple moving average forecast for year 2014?

24. Which of the following is considered a "pure" production planning strategy?


25.

What are two of the main objectives of ERP?

26. If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

27. If annual demand is 6,125 units, annual holding cost is $5 per unit, and setup cost per order is $50, which of the following is the EOQ lot size?

28. What are the three primary data sources used by the MRP system?


29. What transportation mode has very high initial investment costs but gives a very low cost per mile for products that are highly specialized and require no packaging?

30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for innovative products with an evolving supply process is called which of the following? ===============================================