International Green Construction Code

Page 196

Construction or System requiring Verification Mechanical systems completion – all buildings a. Air system balancing – provide the means for system balancing b. Hydronic system balancing – provide means for system balancing

c. Duct system testing d. Mechanical system manuals – construction documents to require O&M manual Mechanical systems – buildings over 5,000 square feet total building floor area a. Commissioning required and noted in plans and specifications b. Documentation of required commissioning outcomes c. Preparation and availability of a commissioning plan d. Balance HVAC systems (both air and hydronic)

Pre Occ.

X

X

X

X

X

X

Post Occ.

Occurrence Method test reports

Pre Occ.

Post Occ.

Section/ Ref. Std.

Inspection and verification

During construction and prior to occupancy

None

None

Inspection and verification

During construction and prior to occupancy

None

None

Testing, testing report and verification of results

During construction and/or at final inspection.

None

612.1.2. 1 and through referenc e to IECC 612.1.2. 2 and through referenc e to IECC 613.5.3 and through referenc e to the IECC

None

Verification of construction documents

Plan review

None

612.1.5. 2

None

Verification of construction documents

None

612.1

None

Verification with the building owner

Plan review Subsequent to completion of all commissionin g activities

None

612.1

Verification with the RDP or commissioning agent HVAC system installer/contract or or commissioning

Between plan review and commissionin g initiation After installation of HVAC systems and

None

612.1.1

TBD

612.1.2

None

X

None

X

X

IGCC Public Version 2.0 Page 174