Skip to main content

Art Camp

Page 14

Art Camp muf architecture /art with Vicki Lewis

Objectives 3 + 4: To establish in young people/children a sense of responsibility and ownership for the transformation and use of the neighbourhood environment. To promote to developers and local authorities the need to include the presence of the child in future developments. These objectives were achieved in the folowing ways:

November 01 Play Walk Art Camp was relocated to the canal side and with Albion Kids Club kit of ‘loose parts’ the children re purposed the tow path as part of the design development process of the Canal Park https://vimeo.com/52819034.

Opportunities identified for Art Camp 2013 St Clements Hospital Development Proposal to deliver Art Camp in partnership with PATH at St Clements Hospital as meanwhile use to brief develop for the future presence of the child and creativity.

This work is included in the Canal Park Masterplan and Design Codes. The children will be further included in the detail design of a number of elements in a session in February 2013, for example positioning embankment slides on site in accordance with the rules of the picturesque.

St Clements is a CLT Community Land Trust and a potential model process for the HWFI Cultural Interest Group to include children in brief development of sites they may establish through CLT

September 23 - 24 Open House Open Studios The exhibition of the children’s work at Open House and the inclusion of Art Camp on the official guide situated children as part of the culture of Hackney Wick. (Audience numbers in the 1000s)

Development of Central Books Site Art Camp was located in Central Books in 2012 and has a baseline experience of the site which is to be redevelop. We are in dialogue with the developer to secure Central Books as a base for Art Camp 2013 and for the children through muf to contribute to the development plans.

At the Wallis Road hub development site the presence of the children to explain their work to adult visitors and the work itself transformed the site entrance in a tangible way. Encounters included those with both journalists and passers by, including a family group from the traveller community in Hackney Wick.

Barbican Art Gallery, Create and Frieze ‘free art school’ Seminar We are talking to the Barbican Art Gallery, Create and Frieze to host a seminar on Art Camp as part of the development stages of their ‘free art school’ project (for adults) Spring 2013.

WICK WOODLAND A12

FooDoo Cafe as an exhibition, a performance and a drop in experience for local children demonstrated the capacity for child led performance to appropriate the public realm.

CANOE STORAGE PERFORMANCE

BOAT YARD AND SKILLS TRAINING

EASTWAY

COMMUNITY MOORING

MULTISTORY CAR PARK

ROAD BRIDGE E09

SLIDE + RAMP

ORCHARD

WIDENED TOWPATH

Eco Build at ExCell Art Camp film screening The Art Camp evaluation film is selected to be screened at EcoBuild in March 2013 as part of the regeneration film program and muf are invited to present Art Camp in the panel discussion.

BLACK POPLARS

LIFTING POINT

PLAY

WICK VILLAGE

I-CITY

FLEXIBLE RESIDENTIAL MOORINGS

COMMERCIAL MOORINGS

HABITAT DETOUR PATHS SEATING

ORCHARD

POLLARDED WILLOW

Ongoing The Art Camp as process contributed to the principles for Chobham Manor public realm as a London iteration of the US model of play-borhood. The potential for Art Camp to have a presence during the construction of phase 1 and to input into the detail design of the ongoing phases for Chobham Manor is part of the public realm strategy for the Zonal Master plan. The strategy is for a presence on site during construction entitled ‘more than a canteen’ and is supported by Sebastian Balcombe of Taylor Wimpy (to further develop this proposal requires dialogue with Taylor Wimpy and the LLDC and the Chandos Centre.)

LIFTING POINT GAINSBOROUGH PRIMARY SCHOOL

FOOT BRIDGE F13

LEA BANK SQUARE

MIXED WOODLAND OUTCROP + PLAYING FIELDS ESCARPMENT SWALE

FLEXIBLE RESIDENTIAL MOORINGS

BICYCLE PROFICIENCY

MIXED WOODLAND OUTCROP + FOLLY

CLIMBING WALL

LIFTING POINT

H10 PEDESTRIAN BRIDGE

HORTICULTURAL TRAINING COPPER BOX

CAFE + BARS

COMMUNITY MOORING

EASTWICK

PLANT NURSERY

LIDO

CREATIVE STUDIOS LIFTING POINT RAIL BRIDGE E27 LIVING WALL

ENERGY CENTRE

COMMUNITY MOORING

QUEENS YARD

WHITE BUILDING

‘Re – imagining the Children’s Museum of the C21st Art Camp is a case study for ‘Re – imagining the Children’s Museum of the C21st that will be presented to 352 children’s museum directors theorists and practitioners in Pittsburgh 2013 in May.

VISITOR CENTRE + CANAL PARK KEEPER MARKER TREE

WHITE POST LANE E30

SCRAPES

POC

SOIL HOSPITAL

BELVEDERE

SWEET WATER

REED BEDS

BLACK POPLAR SWALE

SWEET WATER INTERIM USES

PEDESTRIAN BRIDGE H14 HERITAGE LIFTING POINT

FLEXIBLE RESIDENTIAL MOORINGS

WIDENED TOWPATH

BLACK POPLAR IN SWALES ENGLISH GARDEN SWEET WATER INTERIM USES

VISITOR MOORINGS SWALE

BLACK POPLAR FIELD CENTRE

BIG BROTHER HOUSE E20 CLUBHOUSE + CAFE OLD FORD WOOD

OLD RIVER LEA SWIMS

OLD FORD LOCK

OLD FORD WOOD

LWT SCRAPE, LOG STACK + FIELD CENTRE

LOCK APPROACH MOORINGS

THAMES WATER RECYCLING CENTRE

Produced by: J & L Gibbons muf architecture/ art East Meadowcroft Griffin Stockleys

DRAFT FOR INFORMATION ONLY

J & L GIBBONS LLP

Project:

LANDSCAPE ARCHITECTURE URBAN DESIGN

CANAL PARK

STUDIO A, 22 AUBERT PARK LONDON N5 1TU T: 020 7226 1345 F: 020 7226 3337

Rev

Date

Initials

Description

The information in this drawing is copyright of J & L Gibbons LLP Do not scale from this drawing. All dimensions are to be verified on site prior to construction. J & L Gibbons LLP to be informed of any variation between site conditions and dimensions.

Date:

Drawing title: EMERGING COMBINED MASTERPLAN

Scale 1:2000 @ A1 1:5000 @ A3

Status:

27_11_2012 Drawn:

Checked:

Approved:

ND

-

-

Drawing number:

Rev:

542_SK_40

-

Information


Turn static files into dynamic content formats.

Create a flipbook
Art Camp by muf architecture/art - Issuu