Landscape Architecture Portfolio

Page 1

Climate Change Seasons Weather Shade

Doppler

PI

PLAN

EXIT TUNNEL

Environmental

RECREATION FIELDS

EDGE CONDITIONS OF THE LANDSCAPE SHAPING A SIMPLISTIC SURFACE Physical Orientation 360° Coverage

TUNNEL ENTRANCE

+ ENVIRONMENTAL CONDITIONS WHILE CREATING AN ADAPTIVE LANDSCAPE Tilt Technological Advancement

+ CIRCULATION

Area Facing Sun AT THE GARDEN E =LOOKING 32 xDOWN .12 x 5.62 kwh/m2 E = 16 x .12 x 5.62 kwh/m2 E = 12 x .12 x 5.62 kwh/m2

HYDROLOGY

Phase 4

LANDSCAPE architecture

: 1,041,125 M2 POPULATION : 80,460 RUNOFF : 68,040 M3 Vegetation 18% OF TOTAL RUNOFF AREA

Phase 5

VEGETATION

URBAN + HYDROLOGY Floating Marshland AREA : 1,083,869 M2

Section A-A’

: 84,930 RUNOFF : 71,820 M3 19% OF TOTAL RUNOFF POPULATION

Water Purification

0

2m

4m

x9

FUTBOL FIELD

+ TOPOGRAPHY : INSERTED

GARDEN CAFE

TUNNEL EXIT

x8

84 Mwh/year

CIRCULATION

SCALE 1:10

PASSIVE

104.8 g/m2

2

Area = 25,300 m2

11.3 g/m2

Root System

Phase 6

RAMP TO GARDEN FROM VAL DI CHIO

URBAN

Michael Paccone

818.726.6695 mikepaccone@gmail.com

: 1,405,990 M2 POPULATION : 107,280 Point RUNOFF : 90,720 M3 24% OF TOTAL RUNOFF

Absorber

HOUSING:

10% 15%

PLA

Ammonia RAMP DOWN TO

2,

PALIO

VAL DI CHIO FROM THE GARDEN

Nitrate

1,

Particulates ELEVATOR TO GARDEN

8.4 g/m2

Zinc

6.9 g/m2

Phosphorus

PALIO

2 5.5 g/m GARDEN

+ HYDROLOGY : Dissolved EXTENDED Phosphate 1.3 g/m2

Wind Tides Weather Wave Period AREA : 2,262,397 M2 Wave Height Environmental PLAN POPULATION : 174,330 RUNOFF :A 147,420 M3 PARKING RAMP 39% OF TOTAL RUNOFF ENTRANCE TUNNEL

Characteristics 0

.5m

1m

PARKING STRUCTURE

2m PARKING ENTRANCE & EXIT

VANTAGE POINT TOWARDS RETENTION POOL

EXISTING HILLSIDE

EXIT TUNNEL

Buoy Shape

Copper

CIRCULATION OVER CONDUIT

Quantity

70

W

PLA

Hemispherical Conical

184 Mwh/year 0 125m 250m

500m

B

COMMERCIAL:

PER 2, STA

STAIRS TO

CIRCULATION

AREA DISTRIBUTION URBAN:

4m

+ VEGETATION

CIRCULATION

AREA

2m

SEA

Nitrogen

+ HYDROLOGY : ABOVE 94.2 g/m 76.7 g/m2

1m

EVENTS

x8

Microbes (biofilm) Insects Fish Birds PARKING

PARKING CIRCULATION

0

Phase 7 Phase 8

1m

UNDERGROUND Habitat

TOPOGRAPHY

Section B-B’

PROPOSED PLANTING AREA

CIRCULATION

POOL 5 MAXIMUM VOLUME : 385,714 M3

Phase 3

URBAN

Photovolatic Thin Filmed Silicon

POOL 2 MAXIMUM VOLUME : 512,985 M3

SITE PLAN

PROCESS DIAGRAM

ENTRANCE TUNNEL

POOL 1 MAXIMUM VOLUME : 274,516 M3

Phase 2

ENHANCING THE PHYSICAL

B

PLA

+ HYDROLOGY : INSERTED

POOL 4 MAXIMUM VOLUME : 560,431 M3

B’

CIRCULATION

POOL 3 MAXIMUM VOLUME : 462,082 M3

C

Photovoltaics

THE GARDEN

A

Tangent

Systems

A’

Phase 1

Wave

Holy Se Balls

C’

Circle Packing

25%

Diameter VEGETATION: UPLAND: SLOPE: FLOODPLAIN: FLOODED:

ENTRANCE & EXIT TUNNEL

TUNNEL

LONGITUDINAL SECTIONAL PERSPECTIVE 10% 10% 20% 10%

5m STORMSCALE: CONDITIONS 1:50

A

WEST - EAST

B

MINIMUM 24 HOUR STORM CONDITIO 14,372 M3 TYPICAL 24 HOUR STORM CONDITION 32,745 M3 MAXIMUM 24 HOUR STORM CONDITIO 92,925 M3

SOUTH - NORTH

50% 0

200m 400m

800m

HYDROLOGY SYSTEM SECTIONAL PERSPECTIVE WATER:

UPLAND:

Section C-C’

SLOPE:

FLOODPLAIN:

25%

FLOODED:

2.5% 2.5% 5% 15%

0

20

40

80

1

160 m


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.