4 April 2017

Page 7

Mornington

...Don’t miss securing that wanted property prope p rty Immediate access to Bond & Rent nt Move into that property now Fast prompt assistance Easy terms and conditions No upfront fees and charges Pre approval before finding a property We can assist with transfer off bonds between properties

YOUR GUIDE TO WHAT’S ON THIS WEEKEND FOR PENINSULA FAMILIES FACEBOOK:

peninsulakids.com.au INSTRGRAM: mornpenkids

WE CAN ASSIST YOU WITH IMMEDIATE ACCESS S TO BOND AND RENT T

1300 554 470

An independent voice for the community

Your weekly community newspaper covering Mornington, Mount Martha and Mount Eliza For all advertising and editorial needs, call 03

FREE

2-4 Chelsea Rd, Chelsea VIC 3196 Fax: 03 9776 2929 Email: info@bondassist.com.au

www.bondassist.com.au

Tuesday 4 April 2017

5973 6424 or email: team@mpnews.com.au www.mpnews.com.au

Shops plan changed to save heritage Stephen Taylor steve@mpnews.com.au

Have ball will travel Mornington’s Imogen Barron-Toop has the volleyball world at her feet. Picture: Gary Sissons See story Page 59

A POTENTIAL loss of heritage was taken into consideration in assessing a permit application to redevelop a group of shops in Main St, Mornington. This has resulted in three shopfronts being retained rather than demolished and a fourth relocated. Initially the four shops, at 55-61 Main St, were slated to be demolished, but three will now remain and the fourth “largely retained, but moved to a similar shopfront position inside the new arcade”. This follows a 346-signature petition asking Mornington Peninsula Shire to stop the development of a three-storey shopping arcade, basement carpark, offices and apartments. The council’s Monday 27 March agenda, under petitions and letters, says signatories believed the planned redevelopment would “destroy the uniqueness and ambience of the precinct, and cast shadows over Main St”. Shire principal planner Krystal Blizzard said a planning permit was granted last October to redevelop the existing building into a three-storey mixed use building. “Heritage concerns were taken into account during the assessment of the proposal,” she stated. “The applicant initially intended to demolish the existing shopfronts. “Discussions with the applicant during the assessment phase led to a revised design solution. Instead of losing all of the shopfronts as originally proposed, three will now remain in situ, and the fourth one will largely be retained, but

THE shop facades which will be retained in Main St, Mornington.

relocated to a similar shopfront position in the new arcade. “This was considered to be an acceptable approach to address concerns over the loss of this heritage fabric at street level.” The mayor Cr Bev Colomb said a lot of work had gone into retaining the shop fronts under the shire’s structure plan. “The aim is to retain the feel of Main St,” she said. “Those conditions have been built into the permit.” KOH Living director Tui Cordemans , who organised the petition, said the revised permit was “great news”. “Nobody wanted it [the proposed development]; the locals were disgusted that the council was going to approve it. “Mornington is a great little town, and the tourists who come here love our preserved heritage. It’s fantastic.”

We’ll help you find the floor you’ve been searching for

100+ pages of flooring inspiration available FREE in-store from 6th February 2017.

Choices Flooring by Smiths • Cnr Bruce Street & Tyabb Road, Mornington 5975 2600 • choicesflooring.com.au


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
4 April 2017 by Mornington Peninsula News Group - Issuu