loan is taken out. Similarly, a loan documentation fee of 2,900 INR (44 €) is charged to customers. Per household products costs can be broken down as follows: 

Wiring and basic end use devices: 15,000 INR (227 €)

Customer Civil works and piping: 20,000 – 60,000 INR (300‐900 €)

Customer Electromechanical equipment (turbine, generator, load controller):91,750 INR (1390 €).

Figure 4.44 shows a typical scene of bank officials dealing with micro‐hydro schemes and loans with the members of the community (Boyle and Krishnamurthy, 2011)

Figure 4.44: Members of community dealing with bank officials for micro‐hydro loans. (Source: Boyle and Krishnamurthy, 2011; http://www.greenpeace.org/india/Global/india/report/2011/Taking%20Charge.pdf)

A subsidy of 110,000 INR (1670 €) is paid by Karanataka Renewable Energy Limited (KREDL) for every project under the “Upgradation/Development of Water Mills” scheme after completion of installation. The paperwork to get the subsidy from the MNRE was proving to be a burden to Prakruti’s operation and sustaining relationships for the day to day transactions with the KREDL was distracting their engineers. Therefore Prakruti devised a smart solution, “to multiply to conquer”. An employee, Ravi S. Gownder, who had spent the most amount of time dealing with KREDL, branched out into his own dealership firm,

MCSC Providing village‐level energy services in developing countries | October 2012 | 136