Section 3: Elements—Land Use
Figure 2. Beacon Heights-East Pines Station Area Redevelopment Phasing
This plan anticipates a phased redevelopment of the area around the Beacon Heights-East Pines Station over a 20-year timeframe.
Phase 1 (5-10 years)
Phase 2 (10-20 years)
In Phase 1, properties north of the station are redeveloped with multifamily
In Phase 2, properties abutting and west of the station are
buildings, perhaps with ground-floor retail, fronting Riverdale Road and town-
redeveloped with a mix of multifamily and retail buildings. The
houses behind. This development includes a central common or green at a
Eastpines Shopping Center retains a retail focus but is reoriented
terminus of an extended Veterans Parkway. Phase 1 should include a
towards pedestrians and the street.
signature urban park that meets the Urban Park Guidelines, Appendix F in Formula 2040.
82 | The Approved EAST RIVERDALE-BEACON HEIGHTS Sector Plan