Central Avenue Connector Trail Feasibility Study

Page 110

APPENDIX C. Table 10. Proposed Central Avenue Connector Trail Alignment, Existing Conditions, and Facility Recommendations

Station Served

Segment (as shown on 200foot scale plan sheets)

Length (miles)

Capitol Heights

C12

0.15

Capitol Heights

C11

0.21

Capitol Heights

C10

Capitol Heights

Eastern Limits Chesapeake Beach Rail Trail Head on Southern Avenue Davey Street at Central Avenue

Western Limits Ownership Corner of Maryland Park Drive DC Dept. of and Southern Avenue Transportation Davey Street at Maryland Park DPWT Drive

0.03

Davey Street at Central Avenue (south side)

Davey Street at Central Avenue (north side)

SHA

C9

0.19

Capitol Heights Blvd at Davey Street

Davey Street at Central Avenue

WMATA

Capitol Heights

C8.1

0.24

Capitol Heights Boulevard at Chambers Avenue

Chambers Avenue at Davey Street

DPWT

5' wide sidewalk (east side)

Capitol Heights

C8.2

0.25

Capitol Heights Boulevard at Old Central Avenue

Chambers Avenue

DPWT

5' wide sidewalk (east side)

Capitol Heights

C7.1

0.35

Vale Place

Capitol Heights Boulevard

SHA

Capitol Heights

C7

0.34

North Side Old Central Avenue at Cut-through Road

Vale Place

SHA

Capitol Heights

C6

0.33

Western edge of paved trail at Southern Avenue and Eastern Private property Crown Street Avenue

104 Central Avenue Connector Trail: Feasibility Study and Implementation Plan

Current Type

5' wide sidewalk (both sides)

Dirt footpath


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Central Avenue Connector Trail Feasibility Study by The Maryland-National Capital Park and Planning Commission - Issuu