Ise water resources portfolio 021314

Page 31

SELECTED PROJECT EXPERIENCE Rockdale County MS4 Inventory & Condition Assessment Rockdale County, Georgia In 2007, ISE was again contracted to expand on the pilot inventory study and conduct a complete inventory and condition assessment of the Rockdale County drainage system over a multi-year period (20% of the MS4 per year). This effort consists of mapping the entire MS4 drainage system within the urbanized and non-urbanized areas of Rockdale County and conducting a condition assessment on each structure to achieve NPDES Phase II and MNGWPD compliance.

Contact: Todd Crosby Stormwater Engineer 770.278.7100

Initial Mapping Initiatives 2007 2008 Urbanized Area Non-Urbanized Area Urbanized Area Non-Urbanized Area 791 112 1580 352 29 4 128 7 2088 975 1768 580 380 241 347 220 585 138 689 274 20 3 19 4 115 19 251 51 47 15 78 14 162 97 355 100 54 19 190 20

Storm System Structure Catch Basin Drop Inlet End of Pipe Flared End Section Headwall Hooded Grate Inlet Junction Box Outlet Structure Pipe Direction Yard Inlet Total

Contact: Todd Crosby Stormwater Engineer 770.278.7100

4271

1623

5405

1622


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.