minHuy's Portfolio

Page 1

huy 2011 - 2019

an experimental pathway



PERSONNAL INFORMATIONS name phone number email nationality date of birth

Nguyen Viet Minh Huy or Huy +32 496 28 88 84 +33 620 80 72 37 minhhuynv@hotmail.com Vietnamese 1987 in Vietnam / 2007 in Europe

WORK EXPERIENCES 2018 6 months

2016 - 2018 2 years

2014 - 2016 2 years 2013 7 months 2011 1 month 2010 1 month

Architect DE collaborator in residential architecture at TRIBOLET atelier, Liège, Belgium. - New construction, rénovation, extension - Architectural statement, preliminary project, permission, execution Architect DE collaborator in catering, retail, office design at NC&BHAM Brussels, Belgium. - Renovation, interior and furniture design - Architectural statement, preliminary project, execution, site monnitoring and project manager for a small renovation. Manager and maker at fabrication laboratory FabLab ULB Brussels, Belgium. Internship for Master degree in digital fabrication at LASSA Architects Internship for Bachelor degree at Equateur sas Architecture Internship in inflatable architecture at Häns Walter Müller office

EDUCATION 2014 - 2008 2011 - 2010 2005

Architect DE - Master’s degree at ENSA Paris-Malaquais - architecture, material and construction technology Erasmus - Master 1 at the Faculty of Architecture la Cambre Horta Scientific high school diploma in Vietnam

SKILLS languages

Vietnamese / mother tongue French / professional level English / elementary use

•••• •••• ••••

architectural

Digital fabrication with 3D Printer, Laser cutter, CNC Architectural model making, manufacturing, furniture design Rhinoceros drawing modelling 2D 3D Archicad 2D, Autocad 2D, Microsoft office, Adobe Sketchup, Maxwell Render

•••• •••• •••• •••• •••• ••

plus

positive attitude, hard worker, patient, independant, ambitious, analytical and vietnamese cook



ARCHITECTURE interior DESIGN 6

MAKISU MA CAMPAGNE

8

HUBAILLE HOUSE

10

ANTIDOTES WINE SHOP

12

ANDRE HOUSE

14

NATO MAIN RESTAURANT

16

NATO VIP ROOM

17

FTOOL WALL

18

SOME DESIGN PROJECTS

20

YETI CAVE

22

OLYMPIC SWIMMING POOL

24

CONSERVATORY OF DANCE AND MUSIC

26 BELVEDERE


3D modelling with Rhinoceros 3D

organic wooden structure 6


wooden structure prototyping, scale 1:3 made with CNC milling machine

MAKISU MA CAMPAGNE

NC&BHAM project built 2017 Program Renovation a ground floor commercial to a Japanese fast-food restaurant Location St-Gilles, Belgium Mission interior architect in charge of initial concept, concept development, 2D and 3D modelling catering area, furniture design, prototyping wooden structure, supervisor woodwork and furniture work. Very close collaboration with carpenter.

view from the entry of the restaurant


NIVEAU RUE

FA FA

Terrain existant R-1

-2.42

FACADE SUD

115

Avenue de l'Observatoire 128 Avenue de l'Observatoire 128 4000 Liège 4000 Liège 1t. +32 493 20 95 98 5 t. +32 493 20 95 98 triboletarchitectes@gmail.com triboletarchitectes@gmail.com

0.00

FACADE EST FACADE SUD FACADE OUEST FACADE NORD

R-1

Terrain existant

1

-2.42 SITUATION PROJETÉE -2.50 SITUATION PROJETÉE

-2.75

NIVEAU RUE

0.00

07

115

REZ

Terrain existant -2.42

ET

REZ

Da

1 -0.90

R-1

110

0.00

De

5

5

195

-0.15

DE D'U

4 5

1

-2.09

R-1

80

115

1

Do

4 +3.66

R+1

+1.10

+1.10

0.00

-0.25

5

3

SPRL SPRL +1.10 5 5 ATELIER D'ARCHITECTURE ATELIER D'ARCHITECTURE TRIBOLET TRIBOLET

5

110

254

5 110

0.00

-0.15

110

REZ

0.00

+3.77

R+1

+3.77

4

5

115

144

3

+1.10

+0.20 -0.35

3 +2.79

25

1

4

4

Auteur de projet Auteur de projet

4 4

110

+2.79

5

225

4

R+1

5

4

+3.77 Rue de la Forge, 37 Rue de la Forge, 37 5570 Honnay (Beauraing) +2.79 5570 Honnay (Beauraing)

5

60

5

1

4 +3.66

6 6

5

2

M. Etienne HUBAILLE M. Etienne HUBAILLE

54

2 5 3

+7.94

CONSTRUCTION D'UNE 1 pierre de type moellon de ton brun-gis CONSTRUCTION D'UNED'HABITATION MAISON pierre de type tongris brun-gis 2 moellon ardoisesdeton foncé MAISON D'HABITATION ardoises ton foncé bois ton brun 3 gris bardage bardage bois brun de descente en zinc de ton gris 4 ton tuyaux tuyaux de descente en zinc de ton gris en bois de ton brun 5 menuiseries extérieures menuiseries Maître de2l'ouvrage 6 extérieures cheminéeen enbois inoxde ton brun Maître de l'ouvrage cheminée en inox

110

2

NOUVELLE LIMITE DE PROPRIETE

2

+0.12

LIMITE PROPRIETE

LIMITE DE PROPRIETE

LIMITE DE PROPRIETE

AXE RUE DE LA FORGE NOUVELLE LIMITE DE PROPRIETE

+7.94

1 2 3 4 5 6

Projet

Projet

MATERIAUX DE FACADES MATERIAUX DE FACADES

+7.94

-2.50

Terrain existant

FACADE NORD

-2.42

0

0.5m

1

2m

FACADE SUD FACADE EST

1

0

0.5m

1

115

Terrain existant Terrain existant

-2.42

3

R+1

Date

Date -0.35

-0.15

-0.35

0.00 07-12-2018 07-12-2018

N° Dossier

R-1

N° Dossier Echelle

120120

FACADE OUEST

-2.09 -2.50

R-1

1-100

N° plan Indice

N° plan

10 A

9

2m

+3.77

SPRL ATELIER D'ARCHIT TRIBOLET

+1.10

REZ

1

Avenue de l'Observatoir 4000 Liège t. +32 493 20 95 98 triboletarchitectes@gma

0.00

Echelle

SITUATION PROJE

1-100

FACADE EST FACADE OUEST

R-1

Indice

A

FACADE EST

+7.94

AXE RUE DE LA FORGE

LIMITE DE PROPRIETE

elevations

5

Terrain existant

-2.42

FACADE NORD

115

115

+1.10 0.00

1

5

5

110

165

-2.42

-2.50

ETR

+2.79

1

5

REZ

1

Rue de la Forge, 37 5570 Honnay (Beaurain

5

4

Dessin

4 Dessin ETR

REZ 110

5

6

110

110

5

Maître de l'ouvrage

Auteur de projet

4 4

5

80

1 -2.75

1

Document

CONSTRUCTION D MAISON D'HABITAT

M. Etienne HUBAILL

2 Document

DEMANDE DE PERMIS DEMANDE DE D'URBANISME PERMIS 5 5 D'URBANISME

-0.15

1

-2.50

5

195

0.00

110

0.00

1

225

115

5

5

pierre de type moellon de ton brun-gis ardoises ton gris foncé bardage bois ton brun tuyaux de descente en zinc de ton gris menuiseries extérieures en bois de ton brun cheminée en inox

+3.66

R+1 R+1

110

5

+1.10 +1.10

3

1 2 3 4 5 6

+7.94

4

5

4

115

+2.79

0.00

5

54

+2.79

4

5

5

60

5

+3.77

+3.66

5

115

5

4

Projet

MATERIAUX DE FACADES

AXE RUE DE LA FORGE

2 2

NOUVELLE LIMITE DE PROPRIETE

2

LIMITE DE PROPRIETE

+7.94

LIMITE DE PROPRIETE

AXE RUE DE LA FORGE

LIMITE PROPRIETE

+7.94

2 Document

5

HUBAILLE HOUSE

5

5

DEMANDE DE PER D'URBANISME

5

atelier Tribolet’s project on going Program new residential construction Location Beauraing, Belgium Mission concept development, 2D and 3D modelling, permission documentation 4

+3.66

+2.79

Dessin

R+1

ETR

0.00

1

0.00

115

60

REZ

5

Date

1

-0.15

07-12-2018

-0.35

FACADE OUEST

1 R-1

Terrain existant

-2.42

-2.50

165

1

1

5

110

+1.10

110

115

4

5

N° Dossier

Ech

N° plan

Indi

120 Projet

1

A

CONST 10MAISO +7.94

Maître Revêtement de toiture 2,2cm Contre-lattage 2,2cm Lattage 2,2cm Panneau de fibre de bois 3,5cm Ossature de bois + isolation laine de bois 20cm Pare-vapeur Panneau OSB 1,5cm Vide technique 5cm Panneau OSB 1,5cm Plaque de plâtre 1,25cm

M. Etien

Rue de l 5570 Ho

Auteur

220

SPRL ATELIE TRIBOL

R+1

+3.77

Revêtement de sol 2cm Panneau OSB 1,5cm Ossature de bois 20cm + isolation acoustique Panneau OSB 1,5cm Plaque de plâtre 1,25cm

105

105

+3.66

Avenue d 4000 Liè t. +32 49 triboletar

SITUAT

COUPE

26

+2.79

Plaque de plâtre 1.25cm Panneau OSB 1.5cm Vide technique 5cm Panneau OSB 1.5cm Ossature bois + isolation laine minérale 20cm Panneau fibre de bois 3.5cm Lattage 2.2cm Contre-lattage 2.2cm Bardage bois 2.2cm

+1.10

253

+2.53

+1.10

REZ

Bloc de béton cellulaire

0.00

Bloc de béton cellulaire

36

0.00

Plaque de plâtre 1,25cm Panneau OSB 1,5cm Vide technique 5cm Panneau OSB 1,5cm Pare-vapeur Ossature bois + isolation laine minérale 20cm Panneau fibre de bois 3,5cm Coulisse 4cm Pierre de parement 15cm

Revêtement de sol 2cm Chape de finition 6cm Isolation PUR 10cm Dalle de compression 5cm Hourdis 13cm

Bloc de béton 19cm Membrane d'étanchéité Coulisse 7.5cm Pierre de parement 15cm Cimentage hydrofuge Coaltar Platon

206

Cimentage hydrofuge Coaltar Platon

-0.36

R-1

Empierrement

Docum

DEMAN D'URBA

Dessin ETR

Empierrement -2.42

Géotextile

Géotextile Drain

Dalle de béton 15cm Membrane d'étanchéité Stabilisé 5cm Empierrement 15cm Géotextile

Drain

Date

07-12

N° Dos

12

N° plan 0

section

0.5m

1

2m

11


ground floor plan

9


wine tasting with client and carpenters of the project

ANTIDOTES WINE SHOP

NC&BHAM project built 2018 Program Renovation a ground floor apartment to a wine shop with degustation area Location St-Gilles, Belgium Mission projet manager and interior architect in charge of initial concept, concept development, 2D and 3D modelling, execution documents, prototyping 3d printing, supervisor of the renovation, etc. Very close collaboration with client and carpenter. 10


wine wall elevation

project plan

3D printing prototyping and the wine shelf

views of the built project


2785

60

5955

TP +/-0.00

225

trace mur existante

5525

583

553

TP -0.05

7165

6855

B

4095

60

60

80

110

104

57

44

40

14

40

40

26

13

14

362

13

13 14 2555

2405

13 172

45

401

66

60

2785 60 4455

40 2385

60

5415

A

60

5785

115

145

2,2045

7175

98 5

330

88

88

OT

OT

2,6135

96 5

60

185

181 5

1,006

14

6605

6205

186

40

243

20 330

422

29 44

88 14 285

23 40 59 40 225

845 1935

15

85 14 375

85 14 375

60 3625 100 73 60

38 45 17

55 15 30

65 24 11

307

124

60

14

40

25

40

6

15

49

72

103

60

6115

50

23

50

60

50

330

50

60

60

50

R.: 1,373

1,0865

168 342

50

239

B 191

7295

185

A

1775

44 261 215 794

50

60 66 60

structural plan

143 50

5

1565

1945 197

934


Projet

AMENAG D'UN JAR

Rue de la S 4670 BLEG

Maître de l Trace de la colonne en bois

Radier

M. Joël AN

Isolation de sol

Mme Nicol

Dalle de béton lisée

Rue de la S 4670 BLEG

Stabilisé Dalle de béton

Auteur de

SPRL Atelie Chanfrein mortier

TRIBOLET

Rue Renard

4000 Liège

t. 0493 20 9

triboletarch

Bloc isolant

Platon

Etanchéité sous châssis et autour du bloc isolant (repassant devant platon)

Document

Coaltar

DOSSIER D

Cimentage hydrofuge

CARNET D

DETAILS TE Empierrement drainant 20/40

Dessin ETR

Géotextyle drain Empierrement drainant 20/40

Date

Drain Trace plot de fondation sous cheminée

PAVILLON construction

31/01/2019

Géotextyle

090

17

detail

Det. AA - 1

ANDRE HOUSE

atelier Tribolet’s project on going Program new residential construction Location Blegny, Belgium Mission Execution documentation

+2.10

Dalle béton lissé 10cm Chape PU 12cm Dalle BA 15cm Visqueen Stabilisé 5cm Empierrement 15cm Géotextile

Bloc de béton lourd 14cm

PUR contre la terre type Bi4 Coupure thermique

0.00

det. AA-2

det. AA-3

Parement lattis bois sur contre-latte

Coupure thermique

0.00

Coupure thermique

+2.40 +2.23

Trace colonne en bois 12x12cm

Cimentage hydrofuge Coaltar Platon

det. AA-1

det. AA-4

Géotextyle drain

det. AA-7

det. AA-5

Coupure thermique

+2.41

-0.05

+4.16

+2.95

Bardage mélèze vertical 2.6cm Lattage Contre lattage Pare-pluie Isolation panneau PUR 12cm Bloc de béton lourd 14cm

Cimentage hydrofuge Coaltar Platon

VMZinc plus 3cm OSB 2.2cm Isolation PUR 20cm Pare-vapeur Panneau CLT 3 plis, 6cm, fixé sur gîtage Gîtage KVH 12x20cm apparent

+3.75

det. AA-6

Membrane EPDM Multiplex marin Chevronnage de pente OSB 2.2cm Structure 22cm - laine de roche 22cm Pare-vapeur Lattage 2.2cm Plaque de plâtre 2x12,5mm

Drain

Drain Trace plot de fondation sous cheminée Géotextyle

-0.03

-0.08

Trace plot de fondation sous poteau

Géotextyle drain Géotextyle

section plan 13


installation plan of the project

NATO MAIN RESTAURANT

NC&BHAM project built 2016 Program Interior design of the main restaurant in the future NATO headquarters Location Evere, Belgium Mission interior architect in charge to develop the final design and the execution documents. Detailed technical 2D and 3D drawing of the main wooden structure in the catering area. Very close collaboration with carpenter.

explosed design of the arcade

14


laser cut model of the arcade 1:10

built project

3D view of the main wooden structure in the catering area


lgiht installation 3D views

built project

3D printer test lampshade

NATO VIP ROOM NC&BHAM project built 2017 Program Iight installation Location Evere, Belgium Mission interior architect in charge to develop the final design and the execution documents. Technical 2D and 3D drawing and protoyping of the ligh installation. 16

final test lampshade


FTOOL WALL Personnal project built 2015 Program tools wall for FabLab ULB Location Ixelles, Belgium Mission design and build of the project in collaboration with FabLab ULB.

final test bending system


renovation a wooden chair with a new chair seat from mdf CNC milling

SOME DESIGN PROJECTS Personnal projects 2015

wooden rostrum for FabLab ULB


design a wooden case

renovation a wooden chair

design a new glass door handle 19


extruded polystyrene organic form before the final layer


YETI CAVE

Study project built 2012 Program design a mobile playground for children age 3 to 10 years old Location Brussels, Belgium Client IBGE Brussels Supervisor Victor Levy, Denis Delpire Team Manon Hanuise, Marie Pirs, Christophe Teixera Mota, Julien Simon and Huy Collaboration Unity 27’s students Project finishing SPRL Maryline Garbe Mission study model, final design, safety control, construction plan, production supervision.

21


OLYMPIC SWIMMING POOL AUBERVILLIER Study project 2014 Program Design a new Olympic swimming pool Location Aubervillier, France Supervisor Christian Mémet, Marc Malinowsky, Robert Leroy Team Julia Burdakova and Huy

Tension structure prototyping, scale 1:100 - Jawerth structure

22


site plan with landscaping


technical drawings showing the connection between the old and the new extension building

24


CONSERVATORY OF DANCE AND MUSIC IVRY-SUR-SEINE Study project 2012 Program renovation an old school to a new city conservatory Location Ivry-sur-Seine, France Supervisor Marc Benard

initial idea sketch

study models, scale 1:200 and 1:100


inflatable guest house installed 26


BELVEDERE HWM project 2011 Program construction of an inflatable guest house on the top of two containers Location Ferté Alais, France Director: Häns Walter Müller Task manufacture and installation of the inflatable envelope.

installation of the metallic base structure on the top of two containers


don’t think too much before you start working and don’t work too much before you stop and start to reflect _Nabeel Hamdi_


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.