Skip to main content

Our Water Our Future

Page 88

Appendix 3 – Summary of feedback received on the Draft Integrated Water Cycle Management Strategy Date received

From

Feedback

MidCoast Water Ref

Action

05-Jan-16

Coomba Park

When will Coomba Park receive town water and sewer?

A543233

Replied by email pointing to relevant section of OWOF and explaining that the schemes are funding dependent.

15-Feb-16

Bundabah

Supporting sewer connection for Bundabah

A548001

Replied thanking them for their feedback

22-Feb-16

Elands

Suggests that MCW should consider including in the Plan further investigations into the possible health impacts of the fluoridation of the water supply

B505766

Replied thanking them for their feedback and directing them to NSW Health website for more information on fluoride in water supplies.

22-Feb-16

North Pindimar

Supporting water and sewer for Pindimar and surrounds, sceptical about future connection

A548903

Replied thanking them for their feedback

24-Feb-16

DPI Water

Refer to email

B505838

Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. Amended Section 7.2.6.1 of Chapter 7 to correct on error regarding the water sharing plan. Amended page 54 of the Draft IWCM to say “Once the Nabiac scheme is implemented, we will have a back-up supply; however the Nabiac scheme will initially not have the capacity to cater for the entire Manning scheme. We may consider raising the dam wall and getting the most out of the existing Bootawa Dam, utilising this existing footprint to mitigate further ecological impacts where possible.”

26-Feb-16

DPI Water

Refer to email

A549636

Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. The relevant section in Chpater 10 was also amended. Amended page 54 of the Draft IWCM to

IWCM Strategy 2015

80


Turn static files into dynamic content formats.

Create a flipbook