8.6 Behind-the-meter solar Solar PV is a well-established technology, and more than 20% of Australian homes and an increasing number of businesses are installing solar panels to reduce their grid Description energy costs and greenhouse gas emissions. Uptake of battery energy storage (BESS) remains low but is expected to become more cost-effective in future. Council has several solar PV systems installed across MidCoast Council area, with a few examples including: • • • • •

25.65 kW installed at the Manning Entertainment Centre 21 kW installed at the former MidCoast Water Administration Office 15 kW installed at the former Forster Administration Building 30 kW installed at the Stroud WTP 160 kW installed at Yalawanyi Ganya, Council’s new administration building

Visits to Council’s operations as well as discussions about planned new facilities and upgrades has highlighted opportunities for solar at 34 sites. Most sites are operated by Council, but some are operated by third parties, and opportunities for solar may need to be considered and adopted by these operators rather than by Council. At several sites, more than one option can be considered. At some sites implementation of solar and storage may be a staged approach. The following is a summary of the identified solar PV and BESS opportunities that have been identified at Council operated sites: Site name

Behind-the-meter solar potential

Manning Aquatic and Leisure Centre (3rd party operated)

A 25 kW system initially can be expanded to 99 kW, later on, to remain under the STC limit. In the medium, to long term, this can be expanded to 150 kW and up to a maximum capacity of 333 kW covering all roof spaces.

Manning Entertainment Centre expansion

A 25 kW and 50 kWh battery initially, expanding to 50 kW and 100 kWh battery later on.

Taree Visitor Information Centre

A 10 kW system can be installed on the roof building and absorb the majority day time load

Manning Regional Art Gallery

An additional 15.7 kW of solar PV on the NW facing roofs of the gallery, potentially with a 30 kWh battery to increase self-consumption

Taree Depot

An additional 36.9 kW system initially, expanding to 214 kW later with 300 kWh of battery storage covering all roof spaces. In the long term, this site could become an electric vehicle charging station with solar and storage meeting daytime charging needs for electric vehicles at the depot.

Taree Library

A 25 kW system can be installed on the roof of the tenanted building and be absorbed by library energy demand

Bootawa WPS

A 99 kW system on the roof of the PS2B with an additional 143 kW on the roof of the clear water reservoir later on.

Page 60


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

APPENDIX E: LONG-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

4min
pages 124-126

APPENDIX D: MEDIUM-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

7min
pages 119-123

APPENDIX C: SHORT-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

9min
pages 113-118

9.4 CLIMATE CHANGE PROJECTIONS FOR THE REGION

1min
pages 89-90

9.5.2 2020 climate change risk assessment

1min
page 92

9.3 CURRENT CLIMATE CONDITIONS IN THE NORTH COAST REGION

4min
pages 87-88

8.11 CARBON OFFSETS

6min
pages 80-83

8.9 WASTE MANAGEMENT

4min
pages 74-76

8.10 SEQUESTRATION

5min
pages 77-79

8.8 SUSTAINABLE PROCUREMENT

7min
pages 69-73

8.7 SUSTAINABLE TRANSPORT

9min
pages 63-68

8.6 BEHIND-THE-METER SOLAR

6min
pages 60-62

8.5 ENERGY EFFICIENCY

3min
pages 58-59

8.3 GRID DECARBONISATION

3min
pages 49-50

8.4.2 Mid-scale renewable energy build by MidCoast Council

4min
pages 54-57

7.2 MANAGEMENT SYSTEMS INCLUDING SUSTAINABILITY FRAMEWORK

4min
pages 38-41

8.2.5 Carbon footprint of the MidCoast Local Government Area

1min
page 48

6 MIDCOAST COUNCIL’S CLIMATE CHANGE STRATEGY

1min
pages 34-35

5.3 PREVIOUS SUSTAINABILITY ACTIONS BY MIDCOAST COUNCIL

1min
page 30

5.3.2 MidCoast Council climate emergency declaration

2min
pages 32-33

5.3.1 MidCoast Council Notice of Motion and Resolution 187/19

1min
page 31

5.2 LOCAL TRENDS – WHAT IS OCCURRING IN MIDCOAST?

1min
page 29

4.2 NSW STATE TARGETS

3min
pages 24-27

2.3 CLIMATE ADAPTATION STRATEGY

1min
pages 18-19

EXECUTIVE SUMMARY

2min
page 10

3.2 INTERNATIONAL DRIVERS FOR CLIMATE ACTION

2min
pages 21-22

1.4 SUPPORTING MIDCOAST COMMUNITY TO REDUCE THEIR EMISSIONS

1min
pages 15-16

1.1 RECOMMENDED TARGETS FOR MIDCOAST COUNCIL

2min
page 12

GLOSSARY OF CLIMATE CHANGE AND PROJECT ABBREVIATIONS

2min
pages 8-9

1 INTRODUCTION

1min
page 11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Climate Change Strategy by MidCoastCouncil - Issuu