Manning River Estuary Catchment and Management Program 2021-2031

Page 31

This is significant as rural and environmental lands cover around 95% of the MidCoast Local Government Area, including most of the land and water covered by the Coastal Management SEPP. Manning River ECMP actions to be implemented through Council’s Land-use Planning framework are shown in Theme 6: Land-use Planning. The new Land-use Plan, when complete, will work together with the Manning River ECMP actions in the IP&R Framework to implement the objects of the Coastal Management Act along with Council and our community’s goals for the floodplain and catchment.

1.5.2 The ECMP Governance Structure Implementation of the Manning River ECMP will be led by MidCoast Council’s Natural Systems team. A governance structure with three groups will foster integration between agencies and Council teams, ongoing technical advice and community collaboration. The groups are described below, and the ECMP governance structure is shown in Figure 10. Manning River ECMP Community Reference Group: Community-based strategic input will continue to be provided through the Manning River ECMP Reference Group, a formal committee of Council. A review and appointment of the Reference Group will take place following the Council election in September 2021. The review will consider transferring government agencies currently represented in the Reference Group to the proposed ECMP Working Group. It is an action of the ECMP to increase Aboriginal representation by appointing a second person from the Gathang-speaking community. Manning River ECMP Technical Advisory Group (TAG): Technical advice will continue to be provided by the Manning River ECMP Technical Advisory Group, which will be assisted by several multi-stakeholder thematic groups currently being established in the MidCoast Region. Representatives from these groups will advise and liaise with the ECMP Working Group to ensure adaptive program implementation is based on the best evidence, and projects are integrated across Council departments and other agencies. Thematic groups could include Water Quality, Water Resilience and the Manning River Helmeted Turtle Steering Committee. Industry representatives would be welcome additions to these groups. Proposed Manning River ECMP Working Group: Following the Council election in September 2021, consideration will be given to establishing an operational ECMP Working Group. This group would focus on delivering ECMP actions along with monitoring, evaluation and reporting. It could be made up of representatives from each agency designated as a lead in the action program, along with Council personnel from allied programs leading actions that will contribute to delivery of the ECMP. The Working Group would report to the Community Reference Group.

Figure 10: Option for the Manning River ECMP Governance Structure

Manning River Estuary and Catchment Management Program (ECMP)

31


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Table 9: Contribution of the ECMP to objects of the CM Act

10min
pages 165-168

14 Bibliography

4min
pages 157-158

Appendix 6: MCC land-use strategies aligned to the CM SEPP objectives

9min
pages 178-184

12 Proposed amendments to the CM SEPP

2min
pages 154-155

13 Conclusion

1min
page 156

Table 8: Research Program

1min
pages 152-153

11.2 MERI for the ECMP Action Program

1min
page 149

Catchment

4min
pages 142-144

10 Coastal Zone Emergency Sub-Plan

1min
page 140

Actions led by Council

2min
pages 137-138

7.8 Governance Actions

1min
page 123

7.5 Aboriginal Custodianship Actions

1min
pages 117-118

7.4 Biodiversity Actions

1min
pages 115-116

Health Actions

5min
pages 109-112

7.1 Stewardship Actions

2min
pages 106-108

Figure 35: The three stages of evaluation

1min
pages 104-105

7 Management Actions

4min
pages 102-103

between issues

1min
page 101

6.14 Erosion and Sediment

1min
page 100

6.12 Biodiversity Loss

1min
page 98

6.11 Urban Stormwater and Litter

1min
page 97

20 March 2021

3min
pages 95-96

coastal inundation

1min
page 94

6.9 Entrance Modifications

4min
pages 92-93

Table 4: Key impacts associated with water pollution from diffuse-source runoff

1min
page 88

6.8 Modified Flow

4min
pages 90-91

6.6 Loss and degradation of riparian vegetation

1min
page 85

Acid Sulfate Soil

1min
page 83

6.2 Community Stewardship

1min
page 77

6.4 Loss and degradation of coastal wetlands

1min
page 81

5.2 Manning Threat and Risk Assessment

1min
page 69

Table 1: Gross revenue of major industries in the MidCoast Region

1min
page 64

4.5 Population Projections and land use

1min
page 65

Figure 22: Risk ratings for sediment and nutrient loading in drainage units

1min
page 68

Figure 17: The sampling location for water quality data

1min
page 58

Figure 20: Manning River chlorophyll-a for the period 2015-2018

1min
pages 61-62

Figure 18: Manning River TN and TP readings from 2015-18

1min
page 59

Figure 19: Manning River turbidity for the period 2015-2018

1min
page 60

Figure 16: Water quality monitoring sites in the estuary

1min
page 57

4.3 Water Quality

1min
page 56

4.2 Natural assets

5min
pages 52-54

Figure 14: Program Logic Model

1min
page 49

of the Manning catchment

1min
page 55

3 Objectives, principles, program logic

1min
page 45

Figure 12: Values our community ascribed to each subcatchment

6min
pages 39-44

Figure 13: Problem tree

1min
page 48

3.2 Principles

1min
page 47

2.3 What our community told us

2min
pages 37-38

Coastal Management

2min
pages 20-22

Figure 10: Option for the Manning River ECMP Governance Structure

2min
page 31

1 Introduction Looking after the river we love

1min
page 13

Figure 2: Map of the Planning Areas for the three separate Coastal Management Programs

1min
page 19

2.2 Our stakeholder consultation program

5min
pages 33-35

1.1 About this program

1min
page 14

2 Water Quality and Ecosystem

1min
page 7

Characteristics of the estuary and

1min
page 4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Manning River Estuary Catchment and Management Program 2021-2031 by MidCoastCouncil - Issuu