PORTFOLIO Michelle Yang New York City College of Technology Spring 2014
TABLE OF CONTENT: Substraction Studies : The Cloud The Star
---------------- 1-2 ---------------- 3-4
Bustling Vacancy: Atrim Studies ---------------- 7-12 Stair Studies ---------------- 13-16 Wall Studies ---------------- 17-20
Resume ---------------- 22
Project Name: 01 Subtraction Studies - The Cloud This
project is the development of a design that transforms a cube through a series of subtractive operations in the 3D modeling application, Rhino, in order to maintain its basic “cube-ness” while transforming its interior volume into a ‘spatial experience.’
1
2
STEP # 1
THE CLOUD - PRESPECTIVE RENDERING VIEW
STEP # 2
STEP # 3
Project Name: 01 Subtraction Studies - STAR This
project is the development of a design that transforms a cube through a series of subtractive operations in the 3D modeling application, Rhino, in order to maintain its basic “cube-ness” while transforming its interior volume into a ‘spatial experience.’
3
4
STEP # 1
THE STAR - PRESPECTIVE RENDERING VIEW
STEP # 2
STEP # 3
Bustling Vacancy:
5
Alphabet - This project is all about the design of Wall, Atrim, and Stair. The desgins are using the design tools and commands of Surface Creation, Boolean Differnece, Rebuild, Boolean Intesection, Sweep1 &2 tools,from Rhinocer software. From each design we can explore and have the sence of the feeling of the models.
6
Bustling Vacancy:
atrim studies
A1- CAVE
PLAN VIEW
ELEVATION
Atrim
7
Case Studies: is all about the design of Atrim. The desgins are using the design tools and commands of Surface Creation, Boolean Differnece, Rebuild, Boolean Intesection, Sweep1 &2 tools,from Rhinocer software. groupmenber credit: Jason Ng, Heidi Cherubin
8 A2- BRIDGE
PLAN VIEW
ELEVATION
A3- ROLL
PLAN VIEW
ELEVATION
A4- MOTION
ELEVATION
PLAN VIEW
A5- CANOPY
A6- WAFFLE
PLAN VIEW
ELEVATION
PLAN VIEW
ELEVATION
A9- RINGS
PLAN VIEW
ELEVATION
9
10
A10- COVER
A7- RING
PLAN VIEW
ELEVATION
PLAN VIEW A8- CUT OUT
PLAN VIEW
ELEVATION
ELEVATION
A1- CAVE RENDERING
A2- BRIDGE RENDERING
A9- CUT OUT RENDERING
11
A3- ROLL RENDERING
A4- MOTION RENDERING
A5- CANOPY RENDERING
A6- WAFFLE RENDERING
12
A10- COVER RENDERING A7- RING RENDERING
A8- MAZE RENDERING
Bustling Vacancy:
W1- FALLING
PLAN VIEW
ELEVATION
W2 - VERTICAL
PLAN VIEW
ELEVATION
W3- MIRROR
PLAN VIEW
ELEVATION
W4- ARC
PLAN VIEW
ELEVATION
wall studies
wall Case Studies: is all about the design of At-
13
rim. The desgins are using the design tools and commands of Surface Creation, Boolean Differnece, Rebuild, Boolean Intesection, Sweep1 &2 tools,from Rhinocer software.
groupmenber credit: Jason Ng, Heidi Cherubin
14
W5- WAVE
PLAN VIEW
ELEVATION
W7- SPENTERTINE
ELEVATION
PLAN VIEW
15
16 W6- BETWEEN
W9- RIDE
PLAN VIEW
PLAN VIEW
ELEVATION
ELEVATION W8- TALL
W10- DISORDER
PLAN VIEW
ELEVATION
PLAN VIEW
ELEVATION
S1- TWIST
Bustling Vacancy:
PLAN VIEW
ELEVATION
stair studies
stair
17
Case Studies: is all about the design of Atrim. The desgins are using the design tools and commands of Surface Creation, Boolean Differnece, Rebuild, Boolean Intesection, Sweep1 &2 tools,from Rhinocer software.
18 S2- TUBE
PLAN VIEW
ELEVATION
groupmenber credit: Jason Ng, Heidi Cherubin
S3- TUBE
S4- ZIG ZAG
PLAN VIEW
PLAN VIEW
ELEVATION
ELEVATION
S5- PUSH & PULL
PLAN VIEW
ELEVATION
PLAN VIEW
S9- DONUT
19 S6- LUNAR
S7- SLIDE
S8-CRICULAR
PLAN VIEW
PLAN VIEW
PLAN VIEW
20
ELEVATION
ELEVATION
ELEVATION
ELEVATION
S10- STEPS
PLAN VIEW
ELEVATION
Project Name: 03 work Shop -
the monster
this
project is the development of a design that using the commands of rebuild, paneling tool, surfaceboolean, meshpath, explode, and v-ray rendering tools to design and create the object.
North East View
22
21 North West View
South East View
Prespective View
South West View
Project Name: 04 Data Analysis Research rACE
the
this project is the transformation of an site study. we
CE
NT
RA
K
PA
RK
are using the new york city map research information to design and transform the informations from two topics into an new design. the two researches are the city bike and the subway entrances in the new york city. we use the time and distance to come out with graphs and shapes. and use all the information to design the shape and the function of the project. groupmenber credit: Jason Ng, Heidi Cherubin
23
24 15-20 MINUTES
MID TOWN
BROADWAY & W 24 ST DOCKS: 52
10-15 MINUTES
CHELSEA + WEST VILLAGE + GREENWHICH VILLAGE EAST VILLAGE + LOWER EAST SIDE 25-30 MINUTES
15-20 MINUTES
CHINA TOWN + SOHO
BATTERY PARK
10-15 MINUTES
5-10 MINUTES
STATE ST 57 DOCKS THE BIGGEST STATION IN BATTERY PARK
20-30 docks 30-40 docks 40-50 docks
1-5 MINUTES
50-60 docks
B ATT E R Y PA R K
Amount of varies size bike station
Number of bike at different time
Battery Park 20
BATTERY PARK
20-30 docks stations :10
15
30-40 docks stations :16
10
40-50 docks stations :6
5
50-60 docks stations :1
0
Commerical district therefore there is low amount of bike in the morning as people start going to work.
20-30 docks stations :10
20-30 docks station
30-40 docks stations :16
E A ST VILLAGE + L O W E R EAST SIDE
40-50 docks stations :6 50-60 docks stations :1
40-50 docks station
China Town
50-60 docks station
12 10 8 6 4 2 0
20-30 docks stations :9 30-40 docks stations :11 40-50 docks stations :3
20-30 docks stations :9
CHIN A T O W N + SOHO
30-40 docks station
30-40 docks stations :11 40-50 docks stations :3
Mixture of commerical and residential, it means many people rent and return at different time period. 20-30 docks station
30-40 docks station
40-50 docks station
50-60 docks station
CHINA TOWN + SOHO
East VIllage
20-30 docks stations :27
EAST VILLAGE + LOWER EAST SIDE
30-40 docks stations :25
Residential area therefore the useage is highest in the afternoon as people start to go to shopping etc.
30 25 20 15 10 5 0
40-50 docks stations :8 50-60 docks stations :6
20-30 docks stations :27
20-30 docks station
30-40 docks stations :25 40-50 docks stations :8 50-60 docks stations :6
CHELSEA + W E ST V I L L AG E + G RE EN WH I C H V IL L A G E
30-40 docks stations :29 20-30 docks stations :15
40-50 docks stations :7
30-40 docks stations :29 40-50 docks stations :7 50-60 docks stations :1
50-60 docks stations :1
40-50 docks station
50-60 docks station
Residential area therefore the useage is highest in the afternoon as people start to go to shopping etc.
Chealsea
20-30 docks stations :15
CHELSEA + WEST VILLAGE + GREENWHICH VILLAGE
30-40 docks station
40 MID TOWN
30 20 10 0
20-30 docks station
30-40 docks station
40-50 docks station
50-60 docks station
Mid town 25 20 MID TOWN
20-30 docks stations :12
15
30-40 docks stations :23
10
40-50 docks stations :13
5
50-60 docks stations :18
0 20-30 docks station
20-30 docks stations :12 30-40 docks stations :23 40-50 docks stations :13 50-60 docks stations :18
30-40 docks station
40-50 docks station
50-60 docks station
Commerical district therefore there is low amount of bike in the morning as people start going to work.
VARIOUS TYPE OF CONNECTION CE
NT
RA
K
PA
RK
midtown
cheal15-20 MINUTES
MID TOWN
east vilBROADWAY & W 24 ST DOCKS: 52
china
10-15 MINUTES
CHELSEA + WEST VILLAGE + GREENWHICH VILLAGE
battery park
MID TOWN CHEELSEA GREENWICH VILLAGE
EAST VILLAGE + LOWER EAST SIDE
60,480,577 SQFT 2260 BIKES
25-30 MINUTES
macro connecconnection within the whole manhattan
area connection connection within the neighborhood
micro connecsubdividion within the neighborhood
74,666,741 SQFT 2680 BIKES
CHINA TOWN SOHO
15-20 MINUTES
24,830,294 SQFT 745 BIKES CHINA TOWN + SOHO
EAST VILLAGE 69,524,391 SQFT 2240 BIKES
BATTERY PARK BATTERY PARK
MID TOWN
MID TOWN
CHELSEA + WEST VILLAGE + GREENWHICH VILLAGE
29,322,514 SQFT 1135 BIKES
10-15 MINUTES
5-10 MINUTES
STATE ST 57 DOCKS THE BIGGEST STATION IN BATTERY PARK
20-30 docks 30-40 docks 40-50 docks
1-5 MINUTES
50-60 docks
28
27 CHELSEA + WEST VILLAGE + G R E E N W H I C H V I L L AG E
CHINA TOWN + SOHO
EAST VILL A G E + LOWER EAST S I D E
BATTERY PARK
CHINA T O W N + SOHO
BATTERY PARK
E A S T VI L L A G E + LOWER EAST SIDE
CHINA TOWN + SOHO
ROOF
DATE EXPLODE ANALYSIS 29
30
SECTION2 1/8” = 1’
Michelle Yang 1052 White Plains Road, BRONX, N.Y. 10472 347-923-1116
OBJECTIVE:
EDUCATION:
*
michelleyang8421@live.com
Architectural Intern
The New York City College of Technology
Course taken:
31
Advanced Detailing Studio ARCH Office Software Advanced Material Workshop
Building Performance Workshop
Sustainability
Architectural Drawing 4
Architectural Design 5
ARCH Environmental System
Site Planning
Principle Stability of Structures
Method of Construction
Area of Interest: Physical model making, Architectural Design SKILLS: AUTO CAD, Auto Cad, InDesign CS6, Adobe Photoshop, Rhino, Grasshopper
LANGUAGES:
English, Chinese
32