Mexico Oil & Gas Review 2018

Page 208

VIEW FROM THE TOP

SHALLOW-WATER ACTIVITY TO PICK UP PACE NEAR TERM ALFREDO CARVALLO Director General Mexico of McDermott

204

Q: What timeline do you see for the creation of subsea

account that operators just signed the licensing areas

infrastructure on the Mexican side of the Gulf of Mexico?

auctioned in Round 2.1, in 2018, I expect additional players

A: If we look at the beginning of the Energy Reform in 2015,

to start operating their projects.

when the first contracts were awarded for Rounds 1.1, 1.2 and 1.3, McDermott was already seeing activity emerging

Deepwater is a different story. I expect that deepwater

from the operators in those areas. Some of the fields are a

operators may do some preliminary drilling from 2018 to

little bit behind but everybody saw the news of the large

2020 and then it will take two to three years for them to

discoveries made by ENI and Talos Energy. Fieldwood has

complete their field development strategies and decide

also completed one of its wells and is in the process of

what they are going to do. I believe we will start seeing

completing the second. The operator’s development plan

some activity on the eight blocks that were licensed

is where McDermott comes into the picture. We are already

in Round 1.4 somewhere between 2021 and 2023. My

seeing the extension of international tenders for 2018 from

perception is that when CNH executes licensing rounds

one of the operators. Another player will probably be

2.4 and 3.1, we will see an acceleration of activity, provided

extending other tenders in the first half of 2018 and then

it can assign a significant percentage of those blocks. That

some exploration contracts will emerge toward the end of

would mean a quick payback for the government and

2018. The activity is already present.

everybody else involved.

Round 2.1 work will be similar to what we saw in Rounds

PEMEX is a little different because I think it will continue

1.1 and 1.2. It is taking the operators two years to evaluate

working with a reduced budget. But, when considering

the fields, to do the drilling and to evaluate what they

all the fields and blocks it can potentially farm out, there

have found. Only then will they potentially enter the

could still be a lot of movement there too. I think there is

development phase. I believe that 2018, 2019 and 2020

going to be steady activity throughout the next five years.

will be years full of activity in shallow waters. Taking into

Mexico is an important market for McDermott.

Abkantun top deck stack, Altamira, Tamaulipas


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Mexico Oil & Gas Review 2018 by Mexico Business Publishing - Issuu