Maribyrnong Messenger - Autumn 2021

Page 14

14 Autumn 2021

CAPITAL WORKS HIGHLIGHTS

FOOTSCRAY HOCKEY CENTRE EASTERN PITCH REDEVELOPMENT Redevelopment of the eastern pitch at Footscray Hockey Centre, McIvor Reserve, Yarraville will be completed by March 2021. The new pitch, which replaces the old structurally failed pitch, now meets FIH (International Hockey Federation) certification, with a world class playing surface that players will be able to enjoy for many years to come.

FOOTSCRAY WHARF AND PROMENADE REVITALISATION Construction at Footscray Wharf and Promenade continues with the completion of preliminary works including demolition, installation of new services, new piles along the river edge and site preparation for new paving and structures. The Wharf and Promenade will be a major revitalisation of the Footscray waterfront, better connecting the community to the river and activating this important public space.

The new hockey pitch redevelopment sees: > > > > > >

a full replacement of the hybrid hockey turf in-situ shock pad installation reworks of sub base and pavement layers installation of drainage and conduit services around the parameter of the pitch fencing and surrounding concrete footpaths new tech bench, player dugout and storage amenity.

Once completed, visitors will enjoy a 230m long timber wharf/boardwalk with lower landings and a pontoon for small vessels and recreational boats. A wide promenade and shared path will run along the river bank, along with extensive planting, seating, and lighting, and sheltered picnic and barbecue spaces. Construction is scheduled for completion mid-2022. Some pedestrian and cycle detours will continue to be in place during this time.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.