Drama Theater at Belmont University, the first project I worked on after graduate school at Earl Swensson Associates. I was responsible for all the design graphics and drawings from schematic design through Design Development. I also coordinated with the project architect on Construction documents to maintain design intent and was a part of the construction administration team. The project was the conversion of a church into a drama theater and an addition of an experimental black box theater. The entire shell of the historic church was retained while retrofitting it with a state of the art theater within.
EARL SWENSSON ASSOC.