COD Arch Design + Build, summer 2014

Page 21

SCHEME E: After significant debate, this scheme was chosen by the class for construction. There is a simplicity and elegance to the form. The space created, however, retains a dynamic quality achieved through the variation of a series of sections or bays. This scheme also effectively frames the experience of the adjacent pond. The next step in the process was to work as a class to refine the solidity of the form, develop construction detailing, and incorporate the strenghts of the other design schemes.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.