Teresa Fernández Rojo_ portfolio

Page 1

M. TERESA FERNÁNDEZ ROJO //PORTFOLIO 2020


M. Teresa Fernรกndez Rojo teresafrojo@gmail.com 17/ 05/ 83 Spain +34 618820496 +45 31372555


PROFESSIONAL EXPERIENCE COBE

Architect MAA Copenhagen, Dicember 2016- Diciembre 2019

BIG/ Bjarke Ingels Group

Architect MAA Copenhagen, April 2013- July 2016

BIG/ Bjarke Ingels Group

Architect assistant Copenhagen, January 2012- July 2013

COMPUTER LITERACY Autocad Proficient Rhinoceros Proficient V-ray Proficient Grasshopper Basic Archicad Proficient Revit Good level Photoshop Proficient Illustrator Proficient InDesign Proficient

ADEPT

Architect assistant Copenhagen, 2011

HOLSCHER NORDBERG

Architect assistant Copenhagen, November 2010, January 2011

EDUCATION MADRID POLYTECHNIC UNIVERSITY ( ETSAM) (2002-2010) ÉCOLE NATIONALE SUPÉRIEURE D’ARCHITECTURE DE PARIS-LA VILLETTE - (ENSAPLV) (2005-2006)

LANGUAGES Spanish Native English Full professional proficiency French Basic communication skills Danish Level 2


PROFESSIONAL EXPERIENCE_ Selected project.

STIANSHOLM eprojekt, byggeri og landskab på øen

COMPETITION

IN CONSTRUCTION ROBERT JACOBSENS VEJ 73 FARVESTUDIER 2017.10.27

Totalrådgiver

CHR

Trangravsvej 6

Underrådgiver, landskab

Christiansholm Island

Architect M.A.A Concept, S.D, Role: Facades coordination 3D design solution. COBE_ Client: By og Havn- CØ P/S Location: Copenhagen, Denmark Size: 40,000 m2 Status: Detail design.

KLIMATORIUMET Naturhistorisk Museum

SUMMERHILL

RJV- ØRESTAD

KLIMAHUSET

Architect M.A.A

Architect M.A.A Revised concept/ SD/DD Role: 3D desing solutions and BIM drawings

Architect M.A.A Competition Role: Project leader.

Eerste Nassaustraat 5

1436 København K

1052 BD Amsterdam

Scrivener square tower Schematic design

Role: Facade coordination COBE_ Client: Diamond Corp Location: Toronto, Canada Size: 30.127 m2 Status: DD

Museum Center Blåvand

COBE_ Client: AP pension Location: Copenhegen, Denmark Size: 7500 m2 Status: In Construction,

COBE

Naturhistorisk Museum, Oslo

COBE Location: Oslo Size: 700 m2 Status: Idea


PROFESSIONAL EXPERIENCE_ Selected project.

Project Glory Design Update

June 29 2016

IN CONSTRUCTION

T

SHIFTING TERRACES

Metzler Tower Frankfurt

PRESENTATION BOOK

SING

METZ

Architect M.A.A Concept, S.D, D.D Role: Drawing set coordination, 3D design solution.

Architect M.A.A

Mix- Used tower

BIG_ Client: Capitaland Location: Singapore Size: 95,000 m2 Status: In Construction.

Metzler Tower

MCB

Museum Center Blåvand

Architect M.A.A Revised concept/ SD/DD/ Tender Schematic design Role: Coordination residential area Role: BIM Drawings coordination 3D desing solutions BIG_ Client: Confidential Location: Frankfurt, Germany Size: 65.000 m2 Status: In Construction, Completion in 2018

BIG Location: Blåvand, Denmark Size: 2.500 m2 Status: Completed (2017)

DONG

Frederiksborgvej, 73 Architect M.A.A Schematic Design Role: BIM Drawings.

BIG Location: Copenhagen, Denmark Size: 10.000 m2 Status: Completed (2017)


IN CONSTRUCTION

ST7

MECA

COMPETITION

TM2

Setettin 7 Housing

Culture house en Bordeaux La Defense

BIG_ Client: Oscar Properties Location: Stockholm, Sweden Size: 20.000m2 Status: Completed (2018)

BIG_ Client: Conseil Regional d’Aquitaine Location: Bordeaux, France Size: 12,350 M2 Status: Completed (2019)

Architect M.A.A Schematic Design Role: BIM Drawings

Architect assistant/Architect M.A.A Architect M.A.A Competition PRE/APS/APD/DPC/PCG Plan set Drawings (autocad) Role: Illustrations/ 3D/ drawings BIG Location: Paris, France Size: 40,000 M2 Status: Idea

SMN

Natural History Museum Architect assistant Competition 3Dmodeling/Illustrations

BIG Location: Copenhagen, Denmark Size: 38,000 M2 Status: Idea


PERSONAL WORK_ Selected project

2017

2015

COMPLETED

2014

COMPETITION

// 3rd Place_

DUAL

LOMA SOMERA

RINGEN

Architect M.A.A Role: Concept, project Management

Architect COAM_ Madrid Comision Role: Concept, drawing, site Management

Architect M.A.A Competition Arkitektforening Role: Physical and 3D Models, illustration

Pavillion for GL HoltegĂĽrd Museum

Team: Camila Andrade Buschle, Sofia Adolfsson, Location: Holte, Denmark WStatus: Finished

Family house renovation

Team: Armor Gutierrez Rivas Location: Cantabria, Spain Size: 350m2 Status: Finished

Pavillion MAA 2015

Team: Sofia Adolfsson, Camila Location: Copenhagen, Denmark Size: 289.5m2 Status: Idea


MUSEUM CENTER BLÅVAND

2500 m2_ COMMISSION CLIENT _The Museum of Varde City & Vicinity Museum Center Blåvand integrates four independent institutions: a WWII bunker museum; an amber museum; a local history museum; and a gallery for special exhibitions. The existing bunker, a relic of WWII, sits in a nature preserve that prohibits construction, however an opportunity arose to build into an artificial dune, created during wartime to transport guns to the bunker. Four simple incisions into the topography create a sunken, central courtyard for the museum; as the dune rises around the site, footpaths plow straight into the landscape to allow access by foot. The courtyard is a point of connection amongst the four museums and is also the beginning of an underground exhibition tunnel leading to the restored bunker. The new intervention is the antithesis of bunker architecture; it is vacuum rather than volume, and transparency rather than heaviness. It is a new architecture of a light that simultaneously treats the historic site with sensitivity but also injects elements of surprise and discovery as the journey down into and through the new museum unfolds before its visitors.


FOUR MUSEUMS

SUNKEN VOID

PATHS TO MUSEUM AND LANDSCAPE






4

5

2.165

6

5.710

3 K01_N302

3 1.400

7

12.975

3.100

K01_N411

2 2.600

2 K01_N301

5

6 K01_N303

1

8

9

7.400

10

3.100

11

12.975

1.400

12

N

2.600

52.825

Teknik

Teknik

T.03

2.000

T.01

2.000

T.01

2.000

2.600

A

Teknik

(250) 22.001 Type 2 (250) 32.004

B

U.18

Slangevinder

Se rumtegning K01_N442

6.270

Se rumtegning K01_N435 U.02

(250) 32.003 T1

1.654

TR-02

5.430

1.654

6.755

1.654

(250) 32.003 T1

K01_N404

9.532

Teknik

Se rumtegning #LayID

(240) 22.001

(240) 22.001

Flugtvejsgang

I.09 F119 Se tegning

16.010

U.30

Ravmuseum

1.305

850

#LayID

4 K01_N302 Se tegning #LayID

2.158

Toilet

Se rumtegning #LayID

Se rumtegning K01_N446

K01_N405

U.10

Histolarium

(240) 22.001

(370) 32.002

C

1.495

U.01

23.225

4 K01N_302

1.950

Ovenlys

(250) 32.002 Type 1

16.825

2.808

Se rumtegning K01_N444

Se rumtegning K01_N436

Se tegning K01_N5080

Slangevinder

I.02

Trappe 1 Se tegning K01_N412

5.320

E (250) 32.002 Type 1

01 WIP

Udstillingsgang K01_N406 Se rumtegning K01_N441

10.500

K01_N5074

Særudstilling

I.11

K01_N404

(240) 22.001

1.654

U.04

12.725

10.025

Se tegning K01_N5003

(240) 22.001

Se rumtegning #LayID

1.654 5.430

Udstilling Opbevaring / Værksted

IT/Tekn.

Slangevinder

Bunkermuseum

1.654

3.736

9.745

5.462

U.09

Se rumtegning K01_N434

Teknik U.03

Toilet

(240) 22.001

Se rumtegning K01_N447

T.04

850

U.11

K01_N405

Rengøringsrum

U.23 TR-04

K01_N5072

U.24

(370) 32.001

12.875

1.950

(250) 32.002 Type 1

2.731

(240) 22.001

Se tegning K01_N5088

(250) 32.002 Type 2

2.732

1.858

150

(250) 32.002 Type 2

1.915

U.14

Udstillingsgang

K01_N407

F

(370) 32.001

Work in Progress

(250) 32.001 Type 1

1.305

Se rumtegning #LayID

Flugtvejsgang

(250) 22.001 Type 2

K01_N102

23.225

Se tegning K01_N5089 2.525

Date

13.125

8.075

RevI ChID Change Name D

U.07

(250) 32.003 T1

(240) 22.001

Se tegning K01_N5082

2.800

2.800

3.100

.K01_N410

Fortsættes på tegning K01_N446

8.140

K01_N403

Garderobe

Se tegning K01_N5083

Udstillings nicher

U.13

Se rumtegning K01_N441

(250) 32.001 Type 2

U.08

3.467

(250) 32.001 Type 2

Midterrum

3.662

(240) 22.001

1 K01_N301

Udstillingsgang

U.05

2.300

(370) 32.002 Type 1

1.300

2.800

K01_N5052

2.100

K01_N5053

K01_N408 #LayID

K01_N5073

Omklædning/Bad509 1.142

(370) 32.004 Brandskydeport

(250) 32.002 Type 1

U.26

1.800

8.140

Se tegning K01_N5084

TR-03

Depot

3.400

Se rumtegning K01_N441

(370) 32.002 Type 3

2.113

Udstillingsgang

Bunker Udstilling / Tunnel K01_N409

13.300

5.080

1.876

1.876

U.27

(370) 32.002 T1

2.077

(250) 22.001 Type 2

U.06

(240) 22.001

Elevator

U.15

7.515

2.100

2.580

41.950 7.400

TR-05

I.04

K01_N5071

Se tegning K01_N591 og N592

(240) 22.001

1.200

2.500

2.074

Stoledepot Forrum

(240) 22.001

#LayID

U.28 U. 25

D

(250) 32.001 Type 1

(370) 32.002 Type 1

1.910

Depot køkken

3.100

3.562

1.800

(370) 32.002 Type 1

2.274

20.275

2.113

U.29

(370) 32.001

(240) 22.001

1.339

(370) 32.001

2.150

2.800

8.075 U.20

23.225

K01_N5054

Udstillingsgang

300

Se rumtegning K01_N442

Bænk (240) 22.001

Gang 2.800

(250) 32.002 Type 1

300

(250) 32.004

2.600

3

K01_N5054

Slangevinder

1.500

T.05

Teknik

2

H

5

12.725

K01_N412

2.000

(250) 22.001 Type 2

6 K01_N303

(285) 32.002

1.300

Udst.

U.32

U.19

2.950

32.002 (250)(250) 32.002 TypeType 4 4

(250) 32.002 Type 1

(370) 32.001 Slangevinder

Se rumtegning #LayID

Se rumtegning K01_N444 1.250

Forrum

1.300

U.21

1.300

1.300

Wc

(240) 22.001

F118 Se tegning

1.830

Flutevejsg.

I.12

(285) 32.002

G

2.520

(250) 32.003 T1

U.22

2.600

1 K01_N301

TR-03

12.875

1.339 (240) 22.001

K01_N402

Se tegning K01_N593 og N594

(285) 32.002

I.10

2.150

Se rumtegning K01_N443

U.12

3.068

U.16

Bænk

2.800

T.07

1.300

K01_N5054

(250) 32.002 Type 1

(240) 22.001

Slangevinder (285) 32.002

(285) 32.002

Teknik

23.225

K01_N5063

Gang

Udst.

300

U.31

Flugtvejsgang

2.800

Udstillingsgang

300

(250) 32.002 Type 1

12.725

3.250

Madpakkerum

Gang

12.725

(285) 22.001 Type 5

U.17

2.950

7.675

1.300

1.300

REV

T.06

REV.DATO

BEMÆRKNINGER

INT:

Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark BYGHERRE: Museum Center Blåvand Fonden Bytoften 2, 6800 Varde

Etageplan, Udstillingsniveau

Hovedprojekt Tegn. nr.

K01_N102


C (520) 37.042 Beplantning på tag (520) 37.042 Beplantning på tag, Resevoir plader (360) 47.041 Inddækninger (Varmgalvaniseretstål)

D

(370) 37.042 Tagdækning og Rodspærre

Værn på tag (250) 24 001

(360) 47.041 Stern, Vandfast uorganisk Plade (285) 31.001 Facade/Stern Bæreprofil (285) 31.001 Stern Isolering

Beplantning på tag (528) 37.041

Tag

610

Vari.

+18,740

(370) 37.042 Tagdækning/Isolering

30

45

T

OK Stern Varierer

100

Tagdækning (360) 37.042 REF. K01_N542

(285) 31.001 Facade/Stern Beslag

max. 60 mm

Se tegning K01_N409

(285) 31.001 Facade/Stern Beslag (285) 31.001 Deformation Tag

50

Værn på tag (250) 24 001

160

C

5

225

7

62

7 40

Beplantning på tag (528) 37.041 Tagdækning (360) 37.042) REF. K01_N542

K01_N5053

(285) 31.001 Facade/Sternlukning Dampspærre Halfenizer Iht. Ing. Beton Iht. Ing. (370) 37.042 Tagdækning, Isolering (285) 31.001 Facade Type 3

OK Stern Varierer

(370) 37.042 Tagdækning, Isolering

250

Tag

Se tegning K01_N5053

(285) 31 001 type 3

K01_N401 MOD. 150

150

62

(250) 42.001 Stålkassetter, Akustikvægge, Gardingrav (380) 31.001 Gardiner, Type 01, 02 og 03 - Gardin, motor, aksel inkl styring

RÆKKEFØLGE FOR UDFØRELSE BEMÆRKNINGER INT: 1. -BETON KONSTRUKTIONER IHT. ING 2. -AFRETNING IHT. ING. 3. -(360) 37.041 BYGGEPALDSMEMBRAN 4. -(285) 31.001 GLASFACADER TYPE 1 OG 3, FODPLADE MONTERES BYGHERRE: Museum Center Blåvand Fonden 5. -(285) 31.001 GLASFACADER TYPE 1 OG 3, GLAS-OPMÅLING Hovedprojekt Bytoften 2, 6800 Varde 6. -(360) 37.041 FOAMGLAS UDLÆGGES (285)31.001 Glasfacade Type 3 Facadefod og Understopning 7. -(360) 37.041 TAGDÆKNING Tegn. nr. Slidsrende m. inspektionslem og fuge iht. ing. 8. -(285) 31.001 GLASFACADER TYPE 1 OG 3, GLAS-MONTAGE Detalje 9. -(360) 37.041 TAGDÆKNING FÆRDIGGØRES MOD GLAS PROFILER (360) 37.041 Tagdækning Sti/Gårdrum Byggepladsmembran/Foamglass/Tagmembran 10. -(285) 31.001 GLASFACADER TYPE 1 OG 3, DÆKPROFIL MONTERES Beton belægning og isolering iht. ing. 11. -ISOLERING OG SLIDSRENDE IHT. ING. Godk.: OE Sags nr.: 11072PLACERES/MONTERES Init.: FL Kontrol: OE Målestok:1:5 Dato: 19/12/2014 12. -BELÆGNING UDFØRES IHT. ING. STI BIG Kløverbladsgade 56, 250042.001 Valby INDVENDIG STÅLAPTERING T+45 77 32 57 00 www.big.dk ARKITEKT/TOTALRÅDGIVER OK BELÆGNING 12.140 13. -(285) 22.001, 35.031, Fald 1:40 INGENIØR Johannson & Kalstrup Østervang 2, 6800 Varde Type 01, 02 og 03 - Gardin, motor, T+45 75aksel 22 40 inkl 88 styring www.j-k-as.dk 14. -(380) 31.001 Gardiner, I (285)31.001 Glasfacade Type 3

150

REV

REV.DATO

Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark

(285)31.001 Glasfacade Type 3 fastgøørelsesbeslag 88 62 150 Tagdækning Sti/Gårdrum facade membraner (360) 37.041 Fuge for Slidsrende m. inspektionslem og fuge iht. ing.

K01_N5053

36

42

23

102

UK DÆK varierer

vari.

Se tegning K01_N5052

10

K01_N505

UK Varierer

1230

LED Stållofter T2 (250) 35.031 REF. K01_ N533

UK PX180 11.510

77

PX180 iht. ing. KBE42/22 iht. ing. (250) 42.001 Stålkassetter, Akustikvægge, Fastgørelsesbeslag

UK KBE42/22 11.310

+8,140 +7,874

22

IHT.Ing. K01_N527 Installationsgulv (345) 33.021

UK RB 66/42 11.390

40

FG + 8,140

(285) 31.001 Deformation Tag 575

73

Stål pladegulv (250) 43.021 REF. K01_ N524

Se tegning K01_N5073 Installationsgulv (345) 33.021 REF. K01_N527

U.03 Bunkermuseum

Afretning iht. ing.

48

U

3

U.06 Bunker udstillingsgang/ tunnel

UDSTILLING

U.02 Ravmuseum

2,770

Stålkassetter (250) 42.001 REF. K01_N508

200

Se tegning K01_N5051

Deformation max. 5 mm

UK loft +10,910 LED

180

220

Lys

I

Slidsrende Gardin (380) 31 001 PX 180 KBE 42/22

200

180 215

Gardin (380) 31 001

+12,140

+12,140

60

+12,085

260

+12,140

135

Slidsrende

65

Kostet beton (220) 37.041 REF. K01_N541

Sti

NOTE: #Notes

115 mm - 80 mm

27

48

(250) 35.031 Stålloft Type 2

UK LOFT 10.910

(250) 35.031 Stålloft Type 2 Beslag LED iht. ing.

GANG

(250) 42.001 Stålkassetter, U-Profil (250) 42.001 Stålkassetter, Akustikvægge (250) 22.001 Stålskeletvægge Type 2

REV

REV.DATO

(250) 42.001 Stålkassetter, Akustikvægge

3

45

5

95

95 300

5 45

BEMÆRKNINGER

I

Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark BYGHERRE: Museum Center Blåvand Fonden Bytoften 2, 6800 Varde

Hovedproje

3

Tegn.

Detalje Init.: FL

K01_N505 Kontrol: OE

ARKITEKT/TOTALRÅDGIVER INGENIØR

Godk.: OE

Sags nr.: 11072

Dato: 19/12/2014

BIG

Kløverbladsgade 56, 2500 Valby

T+45 77 32 57 00

Johannson & Kalstrup

Østervang 2, 6800 Varde

T+45 75 22 40 88

Målestok

www.b

www.j-k-a

NOTE: #No


UK varierer

8 (250) 35.031 Stållofter type 1 Ref. K01_N5031

8

6

6

UK varierer

UK Loft +10.910

UK varierer

(250) 35.031 Stållofter type 1 Ref. K01_N5031

UK varierer

(250) 35.031 Stållofter type 1 Ref. K01_N5031

(250) 35.031 Stållofter type 1 Ref. K01_N5031

Integreret kom papirholder og skraldespand

Belysning i loft UK loft +10.910

UK Loft +10.910

UK Loft +10.913

Belysning i loft 7.238

(250) 42.003 Spejlbeklædning

d

(250) 42.003 Spejlbeklædning

d

(250) 42.003 Spejlbeklædning

(250) 42.003 Spejlbeklædning

Stålpladebekædning (250) 42.002

Indbygget papirhåndklæde dispenser

2.770

630

Stålpladebekædning (250) 42.002

(250) 42.003 Spejlbeklædning

20

(250) 32.003 T1 Ståldøre toiletter

2.770

d

2.770

d

(345) 43.021 Epoxy type 2 Ref. K01_N5022

Indbygget hygiejneboks

8

150

21 m2

156

(250) 32.003 type 1 Ståldøre toiletter

Opstalt 7

1.339

Se tegning K01_N5011

Toilet

(250) 42.002 Stålpladebeklædning

Toilet Opstalt 5

(250) 42.002 Stålpladebeklædning

(250) 42.0 Stålkassettevæg Sæbedispenser

Opstalt 4

Opstalt 6

U.10

Toilet

Indbygget papirhåndklæde dispenser

(240) 22.001 Porebetonvægge

U.10 Se tegning K01_N5011

(240) 22.001 Porebetonvægge

Stålpladebekædning (250) 42.002

2.770

Toilet

Toilet

Vask

Se tegning K01_N5011

Opstalt 5

(250) 42.002 Stålpladebeklædning

Se tegning K01_N5011 150

200

8

(250) 42.002 Stålpladebeklædning 150

(240) 22.001 Porebetonvæge

(250) 42.001 Stålkassettevægge

(240) 22.001 Porebetonvæge

(240) 22.001 Porebetonvæge

(250) 42.002 Stålpladebeklædning

(240) 22.001 Porebetonvæge

(250) 42.001 Stålkassettevægge

UK varierer

UK varierer

(250) 35.031 Stållofter type 1 Ref. K01_N5031

(250) 35.031 Stållofter type 1 Ref. K01_N5031

UK Loft +10.910 UK loft +10.910 850

156

910

900

910

900

910

744

845

Integreret kombineret papirholder og skraldespand

Stålpladebekædning (250) 42.002

Stålpladebekædning (250) 42.002 Sæbedispenser

Demonterbar plade

Slangevinderskab (Kun i Toilet U.11) 850

Vask

(250) 32.003 type 1 Ståldøre toiletter

Stålpladebekædning (250) 42.002

(250) 32.003 type1 Ståldøre toiletter

Stålpladebekædning (250) 42.002

(250) 32.003 type 1 Ståldøre toiletter

Stålpladebekædning (250) 42.002

Toiletrulleholder

Stålpladebekædning (250) 42.002

200

1.075

Demonterbar plade

350 FG +8.140

(345) 43.021 Epoxy type 2 Ref. K01_N5022

(345) 43.021 Epoxy type 2 Ref. K01_N5022

FG +8.140

Opstalt 2

Indbygget hygiejneboks

FG +8.140

(345) 43,021 Epoxy type 2 Ref. K01_N5022

(240) 22.001 Porebetonvægge

Se tegning K01_N5010

1.008

(240) 22.001 Porebetonvægge

9

150

7

(240) 22.001 Porebetonvæge

(250) 42.002 Stålpladebeklædning

480

150

6

Opstalt 5

(240) 22.0 Porebetonvæg

(250) 42.0 Stålpladebeklædni Indbygget affaldsbeholder

Se tegning K01_N5011

(250) 42.001 Stålkassettevægge

a

630

U.10

a

156

20

(250) 32.003 type 1 Ståldøre toiletter

Opstalt 7

U.10

Opstalt 4

(250) 42.003 Spejlbeklædning (240) 22.001 Porebetonvægge (250) 42.001 Stålkassettevægge

156

a

910

20

156

(250) 42.003 Spejlbeklædning (240) 22.001 Porebetonvægge (250) 42.001 Stålkassettevægge

(240) 22.001 Porebetonvægge (250) 42.002 Stålpladebeklædning (250) 42.003 Spejlbeklædning

Opstalt 5

910

(250) 32.003 type 1 Ståldøre toiletter

(240) 22.001 Opstalt 7 Porebetonvægge (250) 42.001 Stålpladebeklædning (250) 42.003 Spejlbeklædning

Toilet

900

Belysning i loft

2.800

900

(250) 32.003 type 1 Ståldøre toiletter

Se tegning K01_N5087

Se tegning K01_N5011

910

(250) 32.003 type 1 Ståldøre toiletter

U.10

Se tegning K01_N5086

Opstalt 2

900

Se tegning K01_N5010

UK loft +10.913

Belysning i loft

Se tegning K01_N5087

Se tegning K01_N5011

Opstalt 6

910

Opstalt 2

910

2.800

Se tegning K01_N5011

Se tegning K01_N5011 744

(250) 35.031 Stållofter type 1 Ref. K01_N5031

Opstalt 4

550

(240) 22.001 Porebetonvægge (250) 42.002 Stålpladebeklædning

(240) 22.001 Porebetonvægge (250) 42.002 Stålpladebeklædning

Se tegning K01_N5086

1.339

Toilet

(345) 43,021 Epoxy type 2 REF. K01_N5022

250

1.305

U.10

FG +8.140

Opstalt 7

1.305

Opstalt 1

Se tegning K01_N5011

Opstalt 6

FG +8.140

(345) 43.021 Epoxy type 2 Ref. K01_N5022

Opstalt 6

156

Opstalt 4

(250) 32.003 T1 Ståldøre toiletter

(345) 43,021 Epoxy type 2 REF. K01_N5022

1.810

Opstalt 3

3.464

630

6

FG +8.140

156

6

UK varierer

850

(250) 22.001 Stålskeletvægge

(250) 42.003 Spejlbeklædning

150

(250) 42.001 Stålkassettevægge

(240) 22.001 Porebetonvægge

8

7 Indbygget affaldsbeholder 850

Se tegning K01_N5010

9

630

Væghængt toilet

Opstalt 1

2.800

FG +8.140

Opstalt 9


UK varierer

(250) 35.031 Stållofter type 1 Ref. K01_N5031

UK Loft +10.910

2.150 b

mbineret

b

9

8

7

6

2.770

UK varierer

(250) 35,031 Stållofter type 1 REF. K01_N5031

(250) 42.003 Spejlbeklædning

(250) 42.002 Stålpladebeklædning

Belysning i loft

Belysning i loft UK loft +10.910

(345) 43.021 Epoxy type 2 Ref. K01_N5022

FG +8.140

Se tegning K01_N5010

(250) 42.003 Spejlbeklædning

Opstalt 10 1.890 a

9

a

150

7

(250) 32.003 T1 Ståldøre toiletter type 1

2.770

(240) 22.001 Porebetonvægge

150

(250) 42.001 Stålkassettevægge

50

Opklappeligt puslebord

Opstalt 3

156

(250) 32.003 T1 Ståldøre toiletter

900

860

2.150

Se tegning K01_N5011 Opstalt 10 FG +8.140 Opstalt 9

744

1.500

(345) 43,021 Epoxy type 2 REF. K01_N522

Opstalt 10

U.10

Toilet Opstalt 8

1.890

001 gge

Opstalt 11

001 gge

K01_N435

6

8

150

150

Opstalt 6

002 ing

(240) 22.001 Porebetonvægge (250) 42.001 Stålpladebeklædning (250) 42.003 Spejlbeklædning

(250) 42.002 Stålpladebeklædning

(240) 22.001 Porebetonvægge

(250) 42.001 Stålkassettevægge

Se tegning K01_N5010 UK varierer

(250) 35.031 Stållofter type 1 Ref. K01_N5031 1.6 UK Loft +10.913 c

c

c

2.773

Stålpladebekædning (250) 42.002

Vask

REV

REV.DATO

BEMÆRKNINGER

INT:

Museumscenter Blaavand

Toiletrulleholder

SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark BYGHERRE: Museum Center Blåvand Fonden Bytoften 2, 6800 Varde

Hovedprojekt Tegn. nr.

Rumtegning Publikumstoiletter - Udstillingsniveau

K01_N435

450

Init.: FL FG +8.140

(345) 43.021 Epoxy type 2 Ref. K01_N5022

Opstalt 11

Kontrol: OE

ARKITEKT/TOTALRÅDGIVER INGENIØR

Godk.: OE

Sags nr.: 11072

Dato: 19/12/2014

BIG

Kløverbladsgade 56, 2500 Valby

T+45 77 32 57 00

Johannson & Kalstrup

Østervang 2, 6800 Varde

T+45 75 22 40 88

Målestok:1:20, 1:100 www.big.dk www.j-k-as.dk

NOTE: #Notes


KLIMAHUSET, OSLO

COBE

Competition CLIENT _UiO Naturhistorisk museum, Oslo Located in the Tøyen’s Botanical Garden, the competition brief, encourages the design of a iconic 21st century museum, yet a fundamental reflection of the park’s landscape and a great empathy with the existing historical buildings. It is this delicate balance what drives the sketch process, resulting in a simple, functional and characteristic architecture. Our ambition was to create a dynamic meeting place for sensory experiences and exploration of the solutions to current climate issues, the Climate House is to inspire visitors and the general public to change towards a sustainable way of life.

FREM VITEN

Utstillingen

Auditoriet og undersøkelser.

I kunnskapsk utstillingene. tidligere samt til en rekke al forskere.

Gå inn under b

Observerer og

The Climate House, is especially, a place for reflexion. The hole in the ceiling frames today’s weather out and is an invitation to observation,and appreciation. In the lobby there will be 4 large transparent columns filled with moving and color-rich air. They represent the principal elements that scientific uses to study climate evolution (light, precipitation, greenhouse gases....). So the building is, literally, the filter that helps us to understand the Climate and the human impact on the environment.

Valgmulighet: et


WEATHER

I DAG OBSERVERE

INNENFOR

STUDERE

UTENFOR

Luftrensende

HAGEN MUSEUM

VÆRET STRUKKET UT OVER TID OG PLASS

UTSTILLING

KLIMAET KLIMA Lokale arter

Et museum som omfavner stedets skala

Været + Tiden

Vannrensende

I hagen iscenesettes klima-tematikken for den besøkende med dens vannhåndtering og beplantning

En plattform som deler kunnskap for alle Spiselige planter

LAR

BUS

Sofienberggata

Sofienberggata

BUS

KLIMA HAGEN Sar

Sar

s Gat

s Gat e

e

KLIMATORIUM

P S

Oldemors hage Systematisk hage

Monrads Gate

Monrads Gate

EL

Aboratet Veksthus Dufthagen Fjelhagen BUS

Rød- og svartslistebed

BUS

Urtehagen Osloryggen

s Bje e

s Gat

lke

Skape bevisthet om klimaet og la mennesker erfare værets manifest

Jen

Den skal være et godt eksempel for bærekraftige bygninger

a

a

en

Gat

en

Tøy

KLIMATORIUMET Været + Tiden

Klimahuset søker å gjøre klimaforskning konkret og forståelig. Det hjelper folk til først å observere og deretter studere det usynlige. Hele bygningen er viet til dette. Hullet i taket danner en ramme for dagens vær – invitasjon til observasjon og verdsettelse. Auditoriet og taket er konstruert lagvis, noe som fremkaller en følelse av tid og funn - iskjernene eller årringene som gjør at klimaforskere kan forstå klimaendringene som har pågått i millioner av år. I lobbyen vil det være store transparente søyler fylt med bevegelig og fargerik luft (som forestiller sollys, en sandstorm, klimagasser og nedbør) som bringer været fra atmosfæren, forbi lag av tid, til utstillingsgalleriene under. De er klimakanaler - de frakter elementene som utgjør og influerer klimaet på jorden til de besøkende, og lar dem utforske disse videre i utstillingsgalleriene. Utstillingsgalleriene på grunnplanet er vitenskapsverkstedene som fremmer ikke bare observasjon, men også eksperimentering og analyse.

Flyt av stier i hagen

Gat

Tøy

BUS

T

En ny hage i den Botanisk Hage

Kommuniserer med omgivelsene og den vakre Botaniske Hage

PASSER INN I OMGIVELSE

En enkel, solitær og karakterfull bygning som kobler seg på et nytt, romlig hageanlegg, som danner nisjer, sitteplasser og forskjellige muligheter for opphold og aktivitet. Størsteparten av det nye museumsareal er lagt under bakken, men den transparente paviljongen er plassert fritt i parken og gir med det et innblikk til byggets funksjoner; amfirommet og museets utstillingsarealer i det indre. Taket på bygningen er samtidig et utheng, som skaper ett overdekket uterom og gir mulighet for opphold mens man for eksempel venter på å bli hentet, eller på å få følge. Uthenget leder en inn til et romslig område, hvor de besøkende kan få et overblikk og orientere seg. På den andre siden av glasset forvandler paviljong bygningen seg til en stor foajé og blir med det til et sentralt orienteringspunkt. Her finner de besøkende informasjonen og billettsalget, en regulert entré til utstilling og adgang for alle til auditoriet. Bygningens interiør tenkes utført i tre bekledning i lyse og varme toner som får vegger, trapper og museumsmøbler til å harmonere. Gulvet er i betong. Det lyse indre skal få foajéens varme lys og atmosfære til å spre seg utover i hagerommet i skumringen, og på denne måten gi glød til vinterens snølag. Den brede amfitrappen, som er det sentrale oppholdsrommet har innebygde sitte- og oppholdsplasser, så personale og museumsguider kan starte omvisninger i overgangen mellom foajéen og museet. Museets indre er forankret i et sterkt visuelt landskapsgrep. Parkens beplantning og landskapets dype historie skal være en del av museets dramatikk. Situasjons Plan 1:500

Kommuniserer med omgivelsene og den vakre Botaniske Hage

En plattform som deler kunnskap for alle

En forsiktig og sensitiv relasjon til omgivelsene

Et sentralt samlingsted med takvindu som rammer inn været

En bygning som bokstavelig talt samler væreffekter for å forstå klimaet i på et langsiktig perspektiv Oppstalt SØR 1:200

Den skal være et godt eksempel for bærekraftige bygninger

Skape bevisthet om klimaet og la mennesker erfare værets manifest

Oppstalt ØST 1:200


MECA

MAISON DE L’ÉCONOMIE CRÉATIVE ET DE LA CULTURE EN AQUITAINE 12350 m2_ COMMISSION CLIENT _ Conseil Regional d’Aquitaine This project brings together three cultural institutions into one building: the Maison de l’Économie Créative et de la Culture en Aquitaine—the MÉCA. Programmatic requirements defined by each school shape the MÉCA; the building is a loop, skewed and distorted to accommodate performance and backstage spaces, storage and archive rooms, and art galleries. The loop also frames a central, public space—an outdoor “urban room”—and opens the MÉCA towards the city of Bordeaux and the Garonne River. The “urban room” becomes a luminous frame for the vibrancy of Bordeaux and on special occasions, turns into a stage for performances, a screening surface for installations, and an open space for the urban life of Bordeaux to flow through and engage with the arts.


STATUS 133,000 SF / 12,350 M2 BUDGET BUDGET In Design COLLABORATORS 38 mil // 208.7 DKK 28 38 mil USD USD 208.7 mil mil2018 DKK // Sceno, 28 mil mil EUR EUR Expected Completion Freaks Freearchitects, Ducks Khephre LOCATION 237.5 mil 237.5 mil RMB RMB Ingenierie, VPEAS, Alto Ingenierie, Vincent Bordeaux, France Hedont, PBNL, MRYK & Moriceau, PH.A SIZE SIZE RDC ET MEZZANINE STATUS SF / 12,350 M2 133,000 133,000 SF / 12,350 M2 BUDGET In Design 38 mil USD / 208.7 mil2018 DKK / 28 mil EUR Expected Completion LOCATION LOCATION 237.5 mil RMB Bordeaux, France Bordeaux, France SIZE STATUS STATUS 133,000 SF / 12,350 M2 In In Design Design Expected Completion 2018 Expected LOCATIONCompletion 2018 Bordeaux, France

STATUS In Design Expected Completion 2018 PROMENADE CONNECTION VIEW FRAME

PROMENADE CONNECTION

VIEWING FRAME PROMENADE CONNECTION

VIEWING FRAME PROMENADE CONNECTION

URBAN LIVING ROOM VIEWING FRAME

94 URBAN LIVING ROOM

94 URBAN LIVING ROOM URBAN LIVING ROOM

94

MÉCA 112

PLAN

Th Ma un for Re Thi Bro Ma

uni Pro for bui Re Th bac Bro Ma fra un tow Pro for a lu bui Re int bac Bro spa fra

tow Pro aUrb lu bui and int bac and spa fra an tow gen Urb aand lu and int ext and spa an gen Urb and and ext and

an gen and ext







RINCIPE DE FAÇADE

NÊTRES DE 600 MM DE HAUTEUR - 3 LARGEURS: 1500, 1050 ET 600 MM

FAÇADE

MÉCA 79


CHRISTIANSHOLM ISLAND CLIENT _By og Havn and CĂ˜ P/S The vision for the project is to create a series of new halls for informal, public functions such as an event hall and a swimming hall. Private housing will be placed on top of the halls which encircles a green and intimate courtyard. The whole island will be flanked by a unifying public promenade. The existing vivid public life is balanced with the private life of the future inhabitants to make the island attractive for visitors as well as local residents During 2018, COBE has been running a series of workshops the requirements for the construction project of the island. After the development of the local plan, this phase contains studies of the floor plans and areas, placements of functions, room heights, disposition of stairs and cores, determined for parameters such as apartment sizes, and fire strategy. We are developing different facade solution to accommodate the diverse typologies granting character and a unique identity to each of the buildings.

COBE


INSPIRATION Papirøens warehouses

Boliger

Nye haller

Existing halls

+ 1. Halls The new buildings are inspired by the existing industrial halls at Christiansholm, manteing the same tectonic and langage as ”building machine”.

2. Warehouses From the local plan: ”Development in the area must be based on the character of the buildings along the harbor, and must be designed and presented as a new interpretation of Holmen’s and Christianshavn’s warehouses”

ARCHITECTURE PRINCIPLES

1. Open gables

2. Monolithic expresion

3. Caracteristic features for every cluster

East/West facade are light and transparent.

Througout the roof to the vertical facades and arcades, the architectonic expresion and materiality is the same.

Every cluster holds different progams and it will have a unique facade traitement creating diversity within the a coherent ensemble.






140 mm WINDOW SETBACK

HORIZONTAL BRICK- FLIPPED MORTAR POCKET

60 mm ELEMENTS JOINT GAP 90 MM WINDOW SETBACK

VERTICAL BRICK

35 MM ELEMENT JOINT GAP

12/ 18 MM MORTARGAP VARIATION 50 mm WINDOW SETBACK 120 MM SETBACK HORIZONTAL BRICK 170 MM WINDOW SETBACK


DL 1:10

CB

C3

Sten 01

C1 96 m

Sten 02

m

72

m

m

16.7° Topprofil: L = 965mm

96 m

710

100

m

Sten 03

40

20 m m

192

8

Sideprofiler: L = 910mm

X

m

DV 01

18

8m

mm

F.G.

16

120

362

16

XX - muremål 362

362

120

DL 01

362

m m

200

325

Påsvejst PF 3500

10

16

40

67 °

Sålbænk-profil: L = 965mm

mm

54 mm

(X) 2 86

925

110

26 m m 20 m m 26 m m

A

972

(A) 1 6

228

mm

Huldæk

ig l b ø l forb

DV 1:10

18

CHRISTIANHOLMS BRICK- DESIGNED AND PRODUCED FOR THIS PROJECT

Snit 1:100

16

Facade 1:100

9 1 0 2 . 09 . 9 0 tryk

Skillevæg 972

De historiske pakhuse langs havneløbet.

500

110

300

650

180

312

6 30

12°

Sideprofiler: L = 910mm

Neopren strimmel 30

110 16

482 860

30 30

COLOR AND TEXTURE REFERENCES

COBE - skitse - SK_ARK_219 - 3D Mock up 09-09-2019 CHR. HOLM


SCRIVENER SQUARE, TORONTO Competition CLIENT - Diamond Corp How can we create a new housing development at the Scrivener Square site,that fits into the diverse and distinstive context of Summerhill and at the same time enhances the existing qualities of the immediate surroundings?

We answered that question dividing the tower into two interlocked elements: the podium that gets its architectural language and scale from the brick surrounding buildings, and the tower which architecture relates to the North Toronto train station clock tower, creating a new housing development on top of a new vibrant public space. The tower divided in 4 volumes and the crowns in different heights defines the new addition of the Toronto skyline and stands as a unique landmark at the Summerhill subway stop.

COBE




Lamella Screen A screen of vertical lamellas in front of the glass maximizes views out from the interior apartments, while self-shading the glazing and reducing glare

Lamella Screen Plan Diagram

60 cm

80 cm


FLOOR PLAN PODIUM_ LEVEL 4 2087 m2

FLOOR PLAN MID-RISE_ LEVEL 10 641 m2

FLOOR PLAN HIGH-RISE_ LEVEL 20 448 m2


/ FLOOR

4 UNITS / FLOOR

Library

BR

Bedroom + Den

Foyer

BR

Living

2 Bedroom 2 106 m Unit 3 Bedroom

Kitchen Laundry

2

8m

Kitchen

Foyer BR

Living

2 Bedroom + Libr

BR

180 m

Foyer

180 m2

Lobby

2

Laundry

Den MBR

Kitchen

Laundry

WIC

WIC

Kitchen

WIC

Bedroom + Den

Den

Living

Kitchen

BR

MBR

2 Bedroom + Den

Laundry

WIC

2

MBA

113 m

2

3m

WIC

Foyer

Laundry

Foyer

MBR

Foyer

Laundry

MBR

BR

Foyer WIC

MBA

MBA

Foyer

WIC

MBR

Living

Kitchen Laundry

2

125m

BR

MBR

BR

Kitchen

Living

2

Kitchen

Den

Den/Library

K

2 Bedroom + Libr 180 m2

Laundry MBR Living

2 Bedroom + Den 190 m

Office

Foyer

MBA

2 Bedroom + Den

WIC

Den

Laundry

WIC Foyer

WIC

BR

Bedroom + Den

8m

Living

Living

BR

2

Living

Living BR

6 UNITS/ FLOOR (103- 148 m 2)

BR

4 UNITS/ FLOOR (180- 190 m 2)


STETTIN 7

18600 m2_ COMPETITION Stettin7’s site is an urban peninsula within a larger park setting. It is bounded on three sides by park and harbor with the only connection to built urban fabric to the north. Other buildings in equivalent positions along the park are cultural or institutional; they create social programs that increase public life and activate the areas around the park. By virtue of its catalytic position along the park, we have an unspoken opportunity and responsibility to create a generous urban condition, that will improve the urban space and public life. The courtyard typology generates a foil to the surrounding landscape - an intimate park within a park. Another category of elevated green space is created in the roof, by literally lifting the building from the park fabric.


5 m2 +11.880

6 m2 +11.880

5 m2 +11.880

5 m2 +11.880

5 m2 +11.880

6 m2 +11.880

G

G G

F K

G

G

F

G

G

G

F TP

G G

F

G

K

G

TP

TP

TP

EL

G

G

EL

ST

K F

K F

G

K

G

G G

TP

G

1.12.02 4.01A 4R 103 m2 +11.900

ST

K

G

F

6 m2 +11.880

G

TP

G

TP

G ST

ST

HS F ST K

EL

TP

F

5.12.01 3.14A 3R 87 m2 +11.900

TP

G

F

TP

K HS

TRH_5 24 m2 +11.900

5.12.02 1.03A 1R 40 m2 +11.900 K

TP

G

K

K

G

K

F

5.12.03 3.22A 3R 70 m2 +11.900

EL

G

4.12.01 2.04A 2R 52 m2 +11.900

F

2.12.02 3.01A.M 3R 81 m2 +11.900

K

G

TRH_1 24 m2 +11.900

3.12.01 2.02C 2R 45 m2 +11.900

2.12.01 2.02A 2R 44 m2 +11.900

HS

F

HS

1800 PARK

G

ST

G

G G

ST

TP

TP

G ST

4.12.03 2.09A 2R 53 m2 +11.900

TRH_4 22 m2 +11.900

HS

ST

1.12.01 4.01A.M 4R 103 m2 +11.900

EL

G

G

4.12.02 2.01B 2R 55 m2 +11.900

TRH_3 22 m2 +11.900

TRH_2 29 m2 +11.900

G

6 m2 +11.880

3.12.03 3.02C 3R 81 m2 +11.900

ST

TP

2.12.04 3.02A 3R 84 m2 +11.900

G

HS

3.12.02 2.01B 2R 55 m2 +11.900

G

ST

F

G

TP

K

G

ST

G

G

G

G

G

G

2.12.03 2.01A.M 2R 55 m2 +11.900

G

F

G

G

G

K

G

G

G

G

G

G

G

G

G

G

G

5 m2 +11.880

6 m2 +11.880

6 m2 +11.880

5 m2 +11.880

6 m2 +11.880

5 m2 +11.880

5 m2 +11.880

K F

G

G

6 m2 +11.880 G

HS HS

ST G

K

G

ST

TP

G

HS

G

6.12.02 3.33A 3R 86 m2 +11.900

G

HS

G

TP

6 m2 +11.880

F

G

TRH_6 19 m2 +11.900 K F

6.12.01 3.24A.R 3R 79 m2 +11.900

ST

ST G

G

EXTRUSION

12.12.03 3.01A 3R 82 m2 +11.900

TP

5 m2 +11.880

EL

HS

6 m2 +11.880 12.12.02 2.01A 2R 55 m2 +11.900

TP

ST

F

K

G

TP

G G

5 m2 +11.880

G

TP

HS

12.12.04 1.06A 1R 37 m2 +11.900

F

5 m2 +11.880

K

TRH_12 29 m2 +11.900

HS

12.12.01 3.16A 3R 70 m2 +11.900

G

ST

7.12.01 3.05A.R 3R 75 m2 +11.900

EL

G

F

K

5 m2 +11.880

TP

TRH_7 16 m2 +11.900

G

ST

G

G

G

HS

G

F

K

K

G

F

5 m2 +11.880

G G

G

G

G

G G

+15.600

Wooden Lamella Balcony

+13.950

+13.500

+14.700

Planter

+11.900

G

Shared terrace

G

G

Ramp 1:25

ST

ST

HS

EL

G

+13.800

Bench

+15.600

+13.200

G

G

HS

HS

9.12.02 D.01A.R DUP. 5R 73 m2 +11.900

typical plans

G

G

TP

G

10.12.01 3.02B 3R 77 m2 +11.900

Storage

ST

Private terrace

ST

TP

TRH_9 24 m2 +11.900

F

K

K

TRH_10 24 m2 +11.900

+13.050 +11.980

Chairs

Ramp 1:23

+14.550

+15.750

+12.900

+11.980

Elevator Overheight

F

K

+12.750

7.11.01 terrase

+12.040

116 m2

1R

Zone Category 1R 2R 3R 4R 5R 6R

F F

K G

9.12.01 4.06C.R 4R 104 m2 +11.900

EL

10.12.02 4.06A 4R 107 m2 +11.900

TP

ST

K

6 m2 +11.880

+12.120 +12.600

+13.800

+14.850

2R

TP G

+12.200

G

1. Floor

3R

Brandgasluckorna 1 x 1 m i pixel vägg

6 m2 +11.880

+13.200

+13.950

+12.200

+12.300

G

G

4R

Overview Net. Area 148 2.754 5.021 3.621 1.098 140

Quantity 4 52 65 36 9 1

12.782 m2

167

Sedum

6 m2

2,4 % 31,1 % 38,9 % Bins (Gr. floor) 21,6 % 5,4 % Grasscrete paving (Gr. floor) 0,6 %

Outdoor furniture

6 m2

3R 2

77 m

64 m

6m

6 m2 +11.880

9 m2 +11.880

+14.400

+13.350

+12.750

+12.300

5R

52 m

3R 2

2R 2

Terrace limitation

2

2R

52 m

64 m

Entrance

6 m2

2R 2

2R 2

Low vegetation

78 m

Beams below 1,9 m

2R

G

G

G

G

G

+15.150

5 m2 +11.880

DAYLIGHT

+11.700 7.11.01 terrase

26 m2

8.11.01 D.07A.R +16.800 DUP. 3R 41 m2 +11.900

TP

ST

G

G

A-40.1-0040 +13.950

+15.000

K

TP

ST

F

11.12.03 3.06A 3R 83 m2 +11.900

G

F

EL

11.12.02 4.11A 4R 99 m2 +11.900

26 m2

G

G

TRH_11 23 m2 +11.900

+15.000

7.11.01 terrase

G

ST

9 m2 +11.880

6 m2 +11.880

G

TP

6 m2 +11.880

11.12.01 3.15A 3R 81 m2 +11.900

+15.000

+15.600

G

7.11.01 D.06A.R DUP. 4R 32 m2 +11.900

100 %

49 m2

2R

LANDMARK

46 m2

6R TYPICAL APARTMENT PLAN

3,6

N

7,2

Reviderings nr.

Beskrivning

9 m2

3R 2

71 m

10,8m

79&Park

0

1

2

3

4

Adress: Sandhamnsgatan 79, S-115 28, Stockholm Byggherr: Oscar Properties Bygg AB, Linnégatan 2, Box 5123, SE 102 43, Stockholm

2nd floor Sign.: hk

Granskad: pbm

Gödkänd: fn

6m

BIG

Projekt no.: 11037

A - BJARKE INGELS GROUPS - TEL. NO: +45 72 21 72 27

K - KONKRET - TEL. NO: +46 8 402 38 80

VVS - METATOR - TEL. NO: +46 8 642 77 50

2R 2

52 m

Ritningnr:

A-40.1-0040

Datum: 06-03-2015

15

Skala:1:100

2R

BRAND - DE BRAND - TEL. NO: +46 733 25 80 25

79&PARK DESIGN REPORT 15-03-2015 Kløverbladsgade 56, 2500 Valby, Denmark

6 m2

RH 20002

Bygglovshandling

BH - OSCAR PROPERTIES - TEL. NO: +46 8 510 607 70

BIG Architects

N

5

49 m2

AKUSTIK - ACAD - TEL. NO +46 8 556 211 40

T+45 72 21 72 27

big@big.dk

6 m2

3R

75 m2 6 m2 13 m2

4R

95 m2

6 m2

6 m2

6 m2


31.800

FACADE UPDATE

FACADE UPDA

MAIN DETAILS

MAIN DETAILS

600

Under development A08

+30.500 8 8th Floor

ROOF SURFACE

8

1. M

1.100

B02

+27.400 7 7th Floor

+27.400

A1 SCOPE LINE

A1 SCOPE LINE

2.795

3.800

3.100

400

1.

7

26 25

47

40

305

47

40

+8.800

M

+27.050

VARIES

305

26 25 +27.050

M

2.

350

55

1.

3.100

+21.200 5 5th Floor

+21.200

305

5

+20.850

162

3.100

M

162

300 162

2.750

2.840

51

51

MIN. 53

3.

FACADE PLAN

FACADE PLAN

2.840

14 20 +17.750

C05 B08

Rev

ID

A11

Description

Date

BYGGHANDLING

M

B09 A12

A02

C06

1

2.840

3

300

B10

A13

A03

4

5

6

7

8

9

30 162

FACADE PLAN

N

1

A14

3.600

3.600 J

24

I

21

PARTIAL ELEVATION - GLASS FACADE 1:50

PARTIAL ELEVATION - LAMELLA FACADE 1:50

25

25 25

M

14 20

VVS - METATOR - TEL: +46 8 642 77 50 EL - PROJEKTEL - TEL:: +46 8 562 856 00 BRAND - DE BRAND - TEL: +46 733 25 80 25

Datum:

3.

Projekt nummer:

xx.xx.2015

(BIG) 11033

Ritat:

Granskad:

45

25

25 14

+14.950

10

K - KONKRET - TEL: +46 8 402 38 80

10

150

22

AKUSTIK - ACAD - TEL: +46 8 556 211 40

0

26 25

3.

Godkänd:

Ritning:

3.600 23

45 14 20

A2 - PROJIT AB (Invändig BH Projektering) - TEL: +46 6 412 26 50

A15 J

350

23

350

al

K

316

Parti

Line 24

26 25

Partial facade/section, Typical 22

PARTIAL FACADE SECTION 1:50

ISOMETRIC OVERVIEW FACADE

Helskala, A1:

1:50

Nummer_Rev.:

A-42.0-0110_

27

8

K

+5.100 0 Groundfloor

on Secti

+15.000

+14.650

8

235

235

+5.100

3.600

M

A1 - BJARKE INGELS GROUP (Fasad) - TEL: +45 72 21 72 27

A09

A06

A09

A1 SCOPE LINE

10

79&Park

Sandhamnsgatan 79, Stockholm

3.160

3.160

3.700

Linnégatan 2, 102 43, Stockholm B07

A05

350

B06

+8.450

FACADE PLAN

316

A04 260

C17

162

13

2.910

B04

305

2

C07

14

3.100

C04 B03

+8.800 1 1st Floor

51

2

B02

+8.800

26 25

14

51

C03

+11.550

260

2.

C03

45 14

3.100

C01

+11.900 2 2nd Floor

14

25 14

25

45 14 20 26 25

A10

C08

+11.900

190

10

2.

A07

257

A16

300 350 350

C09

A01

45 14

A08

14

+14.650

M

+18.050

10

14

305

305

+14.650

+18.100

A17

A18

C11

M

257

+15.000

3

A-42.0-0110_

350

3.100

2.910

2.840

1.100

+15.000 3 3rd Floor

C10

2.750

GH. ARY015 N I M .2 LI PRE XX.XX

B01

A03

10

45

DETAILS MARKED WITH GREYSCALE TO BE COMPLETED IN THE FOLLOWING PHASE

+17.750

25 25 25

3.

4

110

+18.100

190

260

1.100

MIN. 53

+18.100 4 4th Floor

Nummer_Rev.:

L

30 162

A02

14

305

FACADE PLAN

B07

A1 SCOPE LINE

2.840

2.750

A05

+8.450

50

FACADE PLAN

14

20

+23.950

10 8

260

350

1:100 slope

VARIES

2.

350

1.

6

10 8

+24.300 6 6th Floor

291

291

B06

+24.300

20

A04

Rail

14

2.500

2.840

120

3.100

Slope

14

14




ROOF overviw isodrawing GENERAL INSTRUCTIONS REFERENCES A-40.1-0120 A-42.4-1420 A-42.4-1421 A-42.0-1210

Plan, Roofplan Roof Railing Types_R1 Private Roof Railing Types_R2 Public Roof Elevations

DETAILS

SIGNATURES CEDAR WOOD CLADDING CEDAR WOOD CLADDING - LAMELLAS CEDAR WOOD CLADDING - LAMELLAS, TURNED 45º. ID FOR SIDE WINDOW IN BALCONY BEHIND LAMELLAS IN FACADE VIEW.

F7Bah1

CONCRETE IN FACADE

1:50

Private terrace 1.18.03

3.520 3.520

40

40 R1l H

8

9

7

8

Private terrace 1.18.03

PLAN 1:50

PLAN 1:50

3.520 R1l

TR450

33.600

40 40

2.610 R1

950

9

Nummer_Rev.:

A-42.4-1423_B

R1l

Private terrace 1.17.03

G

920

7

TR600

920

40 40 R1l

40

3.520

I

40 625 R1

34.200

30.500

40

40

R1

1.975

3.520

R1l

R1 40 40 625

3.520

40

40

40

40

29.250

27.400 40

40

28.050 3.520 R1l

R1l

R1l R1

1.975 R1

1.975

3.520

R1l

R1l

TR1250

40

40

F

1.975 R1

ISOMETRIC VIEW

40

G

920

TR650

TR1250

625 920

3.520

40

R1 40 40 625

40

40

Private terrace 1.19.02

ISOMETRIC VIEW

H

R1

ISOMETRIC VIEW

40

40 40

Private terrace 1.17.03

30.500

34.050 3.520

40

3.520

40

R1l

40 R1l

40

40

40 40 H

9

Private terrace 1.19.02

10

PLAN 1:50 9

10

11

C

C

B A REV

046 PM3 018 010 PM2 009 ID PM

ST220-03

R1

1.285

38.850

29-01-2016

40 R1l 660

R1l

1.054

1.806

40

3.520

1

2

3

4

5

6

7

8

9

D

R1l

40

R2l

785 R1l 40

40

D

935

Linnégatan 2, 102 43, Stockholm

1.975

79&Park

R1l

R1l

3.520

B 046

Sandhamnsgatan 79, Stockholm

3.520

3.520

DATE

N 40

40

40

R1 R1l 1.800

40

3.520

40

40

40

R1l

40

18-02-2016

INIT

186

R1

1.306

ST220-04

R1

R1

2.199

992

38.250

JBA JBA

1.100

1.079

#ID

36.430

Gate removed Railing changed / added. Planterbox added. Railing changed. Planterbox removed. DESCRIPTION

BYGGHANDLING

36.430 2.200

A1 - BJARKE INGELS GROUP (Fasad) - TEL: +45 72 21 72 27

920

TR450

A2 - PROJIT AB (Invändig BH Projektering) - TEL: +46 6 412 26 50 VVS - METATOR - TEL: +46 8 642 77 50 EL - PROJEKTEL - TEL:: +46 8 562 856 00

40

40

38.700 3.520 R1l

40

40

ISOMETRIC VIEW

PLAN 1:50

LANDSKAP - AJ LANDSKAP - TEL: +46 8 509 085 15

E

Private terrace 1.19.01 Private terrace 1.19.03

AKUSTIK - ACAD - TEL: +46 8 556 211 40

40 R1l

E

Private terrace 1.19.03

BRAND - DE BRAND - TEL: +46 733 25 80 25

3.520 40

38.850 3.520 R1l

40

R1l

R2l 625

40

3.520

40

40

K - KONKRET - TEL: +46 8 402 38 80

38.250

37.650 40

ISOMETRIC VIEW

10

11

Datum:

Projekt nummer:

18.12.2015

(BIG) 11033

Ritat:

Granskad:

Høgni Laksafoss

Godkänd:

Tobias Hjortdal

Per Bo Madsen

Ritning:

Private terrace 1.19.01 PLAN 1:50

Roofterrace overview_Private

Helskala, A1:

1:60, 1:50

Nummer_Rev.:

A-42.4-1423_B


DONG Commission 66 non-profit affordable housing, in a 6800m2 building in the Copenhagen’s multicultural area of Northwest. Big was commissioned to design Dortheavej in 3013 by the Danish non-profit affordable housing association Lejerbo, it was asked to create the much needed public space in the area while keeping the pedestrian passageway open and the adjacent green yard untouched. The characteristic checkered pattern of the project is based on a singular prefab structure. Conceived as a porous wall, the building gently curves in the center, creating space for a public plaza towards the street on the south side and an intimate green courtyard towards north. On the streed level, the building opens up to allow the residents and genera public to pass into the courtyard.





We have based the branch designs on these principles, to create an environment co atmosphere, incorporating an abundance of daylight, natural materials, and elegant

PROTOTYPE FOR A BANK BRANCH Commission BIG was commissioned commissioned in 2013 to develop a full prototype and the design manual for the future look of Bank branches. The design was based in the need of the bank to reduce staff and create a new self service strategy. The project was develop under a severe confidential frame and it remains unveil.


The Facilities Zone will incorporate combination surfaces relating their individual location, function and The Facilities Zone will incorporate aa combination ofof surfaces relating toto their individual location, function and requirement; for example the WC will surfaced with tiles. requirement; for example the WC will bebe surfaced with tiles. Reference: Reference:

For technical installation, see Appendix I: “Technical Manual”   For technical installation, see Appendix I: “Technical Manual” For layout and further examples, see Appendix Drawings   For layout and further examples, see Appendix II: II: Drawings P R IM A RY b u i ld i n g c o m ponen t s Internal window and door system (GOLD versionIn , sIn u pthe er public elpublic lipse) areas areas (Welcome Zone, Lounge Zone, Self-service Zone, and Teller Zone) stone ceramic tiles the (Welcome Zone, Lounge Zone, Self-service Zone, and Teller Zone) stone oror ceramic tiles

will used the primary flooring material. will bebe used asas the primary flooring material.

Stone floor tile layout outside meeting room_Diagram 2.3.1 Stone floor tile layout outside ofof meeting room_Diagram 2.3.1 Ellipse elements, Photo 2.6.4

staff areas, meeting rooms and other spaces, system carpet tile will implemented. InIn staff areas, meeting rooms and other spaces, aa system ofof carpet tile will bebe implemented.

Tile carpet layout Team Zone_Diagram 2.3.2 Tile carpet layout inin Team Zone_Diagram 2.3.2

Ellipse elements, Photo 2.6.5

Danske Bank Design Manual 01-07-2014 Page 27 Danske Bank ·· Design Manual ·· 01-07-2014 ·· Page 27


The Welcome Desk is located in close proximity to the entrance door. The Welcome Desk is the primary  For further detail drawings, see Appendix II: Drawings design object which is found in all Danske Bank branches. The corners of the Welcome Desk are rounded  For further specification, see Appendix III “Fixed furniture specification” allowing for closer contact if so desired. References:   

For Technical details, accessibility etc., see Appendix I: “Technical Manual” For further detail drawings, see Appendix II: Drawings For further specification, see Appendix III “Fixed furniture specification”

Welcome Desk (mock up) facing the main entrance, Photo 4.3.1

The Welcome Desk is designed with a white pigmented oak veneer and function as a three dimensional object. This form will allow it to be placed in most areas close to the entrance. It can be assembled as counter only; however in most cases a permanent working station module is required. The local branch requirements and space will determine this, see diagram 4.3.2. Welcome Desk (mock up) facing the main entrance, Photo 4.3.1

The Welcome Desk is designed with a white pigmented oak veneer and function as a three dimensional object. This form will allow it to be placed in most areas close to the entrance. It can be assembled as counter only; however in most cases a permanent working station module is required. The local branch requirements and space will determine this, see diagram 4.3.2.

Standard welcome desk setup, Diagram 4.3.2

Danske Bank · Design Manual · 01-07-2014 · Page 66


int is part of the Lounge Zone and part of the panel walls system.

echnical details, accessibility etc., see Appendix I: “Technical Manual” rther detail drawings, see Appendix II: Drawings rther specification, see Appendix III “Fixed furniture specification”

L O U N G E z o ne Option A - GOLD

Typical coffee point setup integrated with panel wall, Drawing 7.6.2 Dishwasher and refrigerator can be incorporated in the coffee point, but requires more cupboard space. However these functions are preferred located in adjacent service spaces, such as small separate “tea kitchens”

Product selected for coffee point, Photo 7.6.3

Coffee point integrated into the panel wall, Image 7.6.1 The fresh water tab should be ordered with an extra long ‘neck’ to allow water jug to go under the tap. This will be a special edition of the Vola 590 series.

int is composed of two 200mm “S” curved panels forming a niche that has a depth of 600mm n length. The table top is 5 mm thick brushed stainless steel. The Coffee point will contain two or fresh water and one for drinking water, a coffee machine, and cabinets containing the ble service, milk jugs, or fresh water coolers, etc. This stainless steel countertops should grain 320, provides a very uniform surface hiding all welding work and is referred to as


DUAL GL. HOLTEGAARD Temporary pavilion. Competition

CLIENT _Gl. Holtegaard Museum (Holte, Denmark) Dual is the last winning of the three-year exhibition series Pavillon I-III - New architecture in the baroque garden of Gl. Holtegaard. The task was to create an artistic architectural space for the baroque garden, which freely interprets the theme of scenery based on Gl. Holtegaard’s history as home of Ludvig Holberg’s comedies, masquerade and the idea of ​​the garden - and the world - as space for (self) staging. Dual is a self standing staircase, shaped as a perfect circle in plan that rises 2.5 meters from the ground. Halfway up, the platforms created in the middle of both arcs, and on the top, give the double staircase an overall sculptural expression as one big scene. Scenery is a simultaneous and very simple interpretation of the often magnificent staircase architecture from the baroque, where the stairs were used as scenes on arrivals and departures for major events in the substantial and powerful buildings.

PERSONAL WORK



7400

A2-040-3

569

1151

583

7400

2532

548

Between 1.4 - 1.5m acc. to cph steel

180

1260

1059

A2-040-1

Grass/ column Max. 0.2m A2-040-2

Compresed sand to level

8000

7400

50.00°

4400

DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER

køreplader 3x 2x 25 mm

GL. HOLTEGAARD

01 (no column)

CONSULTANT

HENRIK ALMEGAARD

DRAWN BY

02

27

60.00°

CSB

TF

Columns Ø48mm/4

PLAN

03

26 25

CHECKED BY

04 SCALE

05

25

A3 1:50

DATE

2017.05.08

DRAWING NUMBER

A02 - 20 - 002 06

24

23

07

7400

9.00° 08

22

8000 1700

21.00°

1300

09

21

10

20

2000

11

19 12

18 17

13 16

15

14

60.00°

POSITION OF COLUMNS SEE DRAWING A02 - 20 - 004 FOUNDATION SEE DRAWING A02 - 40 - 002

28.00° DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER

GL. HOLTEGAARD

CONSULTANT

HENRIK ALMEGAARD

DRAWN BY

CSB

CHECKED BY

TF


7400 4400

119.00 mm

01 27

Top Railing (Horizontal) Ø48mm

02

Baluster (Vertical) Ø48/4mm

03

26 25

04 05

25

06

24

Ø 48 mm 4mm / S235 23

07

7400

12mm / S235

9.00° 08

22

24.00 mm

4 3

12.00 mm

8.00 mm

8.00 mm

21

09

10 M12 Quality 8.8 11

20

48.00 mm 96.00 mm

8mm / S235 0.8mm Brushed/ stainless steel

19

DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051

18

12

BUILDING OWNER

GL. HOLTEGAARD

17

13

CONSULTANT

HENRIK ALMEGAARD

16

DRAWN BY

CSB

15

CHECKED BY

14 TF

4mm / S235

CONNECTION DETAIL PLATE AND BALUSTER

SCALE

A3 1:2

DATE

2017.04.04

DRAWING NUMBER

A02 - 40 - 003 Ø 48 x 4mm / S235

POSITION OF Grass BALUSTERS SEE DRAWING A02 - 20 - 003

DUAL Architectur Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051

DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER

12.00 mm

200.00 mm

GL. HOLTEGAARD HENRIK ALMEGAARD

48.00 mm Soil

BUILDING OWNER

CONSULTANT DRAWN BY

Ø 48.3 x 4mm / S235 11mm steel plate foundatinn S235

CSB

CHECKED BY

TF

CONNECTION DETAIL COLUMN AND PLATE

DATE

SCALE

A3 1:2

2017.04.04

GL. HOLTEGAAR

CONSULTANT

HENRIK ALMEGA

DRAWN BY

CSB

PLAN

DRAWING NUMBER

a5

10mm steel plate foundatinn S235

A02 - 40 - 001

SCALE

A3 1:50 DRAWING NUMBER

A02 - 20 -

25 mm steel plate ?? mm Gravel/ Sand

Soil

D

DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER

GL. HOLTEGAARD


LOMA SOMERA 350m2_ COMMISSION How can we renovate a 200 year old house without compromising the users comfort? In the structure of the house was easy to read three different parts, corresponding to 3 extensions that occurred in different times of the house history. What we found when we come into the house for the first time, was a collection of spaces disconnected to each other and laying in many different levels. So the main focus of the project was giving a continuity creating several architectural promenades that link to all the spaces of the house.

PERSONAL





VIEW FROM NORTH BRIDGE ROAD

SINGAPORE TOWER 93 000 m2_ COMPETITION CLIENT _Capitaland Located in the heart of Singapore financial distrid, the 280m tall tower, transforms the site of a former car park complex built in the 1980s. The building’s exterior façade consists of vertical elements that are pulled apart to allow glimpses into the green oases blooming from the base, core and rooftop. At the ground floor, visitors will be met by a public rainforest plaza and park, with garden paths and covered passages leading into the City Room, a 19m – high generous open space at the foot of the tower. The first eight floors of the tower are dedicated to a 299-units serviced residence including a wide range of facilities. The top 29 floors of the tower offer premium office spaces . At the core of the building between the hardscapes of the offices and residences are four connected levels of organic soft-scape, called the Green Oasis- a mesmerizing 30 open- air garden for work, casual strolls, relaxation, exercise and events.


CH & CECIL STREETS

1.6.3

4.11.2

Project Glory Design Update

June 29 2016

DESIGN OVERVIEW OVERALL GEOMETRY

THE GREEN SPRING HANGING GARDENS & HAMMOCKS, FL 21

1.6.3 DESIGN OVERVIEW OVERALL GEOMETRY

THE GREEN SPRING The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.

4.4 THE GREEN SPRING CONCEPT SECTION

The concept section shows approximate achievable heights of trees planted towards the interior of the Spring, based on identification of possible plant species from daylight (lux) studies.

Project Glory Design Update

June 29 2016

Not to Scale

1.6.3

Project Glory Design Update

June 29 2016

DESIGN OVERVIEW OVERALL GEOMETRY

ROOF GARDEN AND AMENITIES The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.

Roof Garden and Amenities Centralized MEP plantrooms are located on a single floor under a rooftop restaurant. The restaurant itself is connected to a roof garden that spirals up in a continuous and accessible loop in order to accommodate the varying height requirements of the MEP equipment below.

THE FACADE The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.

Roof Ga Centraliz floor und itself is c in a con accomm MEP equ

Roof Garden and Amenities Centralized MEP plantrooms are located on a single floor under a rooftop restaurant. The restaurant itself is connected to a roof garden that spirals up in a continuous and accessible loop in order to accommodate the varying height requirements of the MEP equipment below.

Facades Vertical extrusions mounted to the exterior of the facade as mullions run continuously from top to bottom of the building. These vertical elements are systematically deformed to accommodate the green and social spaces at the top, middle, and bottom of the building - a play between the orthogonal and the organic that both unifies and reveals pockets of green and activities in the tower. The facades and image of the building could be a perfect expression of its function and layout.

Facades Vertical as mullio building deforme at the to between unifies a tower. Th perfect e


origin

origin


I

80

I

80

6,5

H

7,5

00

6,5

H

COMMUNITY SPORTS/ MULTI PURPOSE

7,5

00

G G

7,5

00

L

00

F K

7,5

F

A

VO ID

A

E

7,5

00

7,5

00

A

E

GLASS LIFT

Lif t L0 LR 5 Lif t L0 LR 6 Lif tC L3 CP 1 Lif t L0 LR 2

A

Lif t L1 HR 9

S 2 tair 27 8 st 5/1 ep 71 s .4

A

S 2 tair 27 0 st 5/1 ep 75 s

FOREST COLONNADE

A

A

UP START OF RAMP

7,5

CAFE

A

A

A

A

E

00

00

E

7,5

A

F

7,5

4

00

7,5

4

00

origin DATE

5

NAME

DESCRIPTION

7,5

REV

00

7,5

5

00

origin

DRAWING NO.

SING-

DESCRIPTION

PROJECT-

SD00-AD-FP-10-0000 PHASE - CONSULTANT - DRAWING TYPE - FLOOR NO. - BLOCKNUMBER

PROJECT

PROJECT GLORY

7,5

6

00

50 Market Street Singapore 048940 Singapore

PROPOSED ERECTION OF A 52-STOREY COMMERCIAL DEVELOPMENT WITH A BASEMENT AND COMPRISING SHOPPING / HAWKER CENTRE(AIR SPACE LOT) / SERVICED APARTMENT / OFFICE / MULTISTOREY CAR PARK AND ANCILLARY FACILITIES ON LOTS 00505N & OO660X-PT, TS 01 AT MARKET STREET / CHULIA STREET / CHURCH STREET

7,5

6

Lif t L2 SR 5

Lif t L0 LR 1

Lif t L1 HR 8

SKYLIGHT

00

VO ID

Lif tC L3 CP 0

Lif t L0 LR 3

Lif t L1 HR 6 Lif t L1 HR 7 Lif t L1 HR 3

S2

Lif t L1 HR 9

Lif t L1 HR 4 Lif t L1 HR 3

9,0

A

00

A

COMMUNITY SPORTS/ PURPOSE

2

9,0

F

SR LIFT

KITCHEN

Lif t L1 HR 4

C

80

A S2

Lif t L0 LR 4

Lif t L0 MR 9 Lif t L1 MR 1 Lif t L1 MR 0 Lif t L3 SR 4

3,5

1

3 3

Lif t L2 Fire 0

Lif t L0 MR 7 Lif t L1 MR 2 Lif t L2 PL 8

Lif t L1 HR 5

Lif t L0 LR 1

ER RIS

Lif t L1 HR 8

Lif t L2 PL 7

80 3,5 Lif tC L3 CP 0

G

E AR SP

VO ID

Lif t L0 LR 2

PUBLIC LIFT

Y BB LO

Lif t L1 HR 7

T LIF

Lif t L1 HR 5

7,5

00 Lif t L0 LR 6 Lif tC L3 CP 1

Lif t L0 LR 4

Lif t L0 LR 3

ER RIS

Lif t L1 HR 6

E AR SP

TS EN SID RE

Lif t L1 MR 0

SR

Lif t L3 SR 4

Lif t L0 MR 8

Lif t L0 LR 5

L0 R 9

Lif t L1 MR 1

ER

RIS

H

T

SKYLIGHT

Lif tC L2 CP 9

Lif t L0 MR 8 Lif

tM

t L1 MR 2

Lif

Lif t L2 Fire 1

00

Lif t L2 Fire 1

Lif t L2 Fire 0

Lif t L0 MR 7

A A

VO ID

SRELEC

Lif t L2 PL 8

A

ER

RIS

Lif t L2 PL 7

T

SRELEC

A

B A

ON MM ER CO T RIS SR EC EL

A

80

2

7,5

A A 00 7,5

00 7,5

ON MM ER CO T RIS SR EC EL

CE

80

NOT ACCESSABLE

A

N NA

3,5

A

TE IN MA

I

3,5

1

Y BB LO

Y BB LO

R FO

J

C

K

A

SKYLIGHT

A

G IN HT FIG

AL TW CA

B

G IN HT FIG

S1

A

E FIR

C

PICNIC HILLS

E FIR

S 2 tair 27 0 st 5/1 ep 75 s

7,5

S1

7,5

A

D

00

S 2 tair 27 8 st 5/1 ep 71 s .4

00

A

Lif t L3 GS 5

A

A

D

00

7

9,0

CLIENT

00

7 9,0

CapitaLand Singapore Limited

00

168 Robinson Road #30-01 Capital Tower 068912 Singapore

3,5

3,5 80

8

8

BIG Bjarke Ingels Group A/S Carlo Ratti Associati

9

80

LEAD DESIGNERS:

9

RSP Architects Planners & Engineers CONSULTANTS: SECTION TITLE:

Floor Plan 10 SR DRAWING NO.:

SING- SD00-AD-FP-10-0000 GEZ. / GEPR.

XX/XX

DATE

8/22/2016

FORMAT

841X594 (DIN A1)

SCALE:

1:200

OUTDOOR SEATING


ion of the building, is consistent with ed concept with move one floor of and the alignment meter of the office & further reducing

ROOF

ROOF

F53

F53

F52

+380.00 9400

9400

14100

4000

4000

LMR

LMR

RESTAURANT

F52 14100

+380.00

M&E

9000

RESTAURANT

10500

M&E

9000

F51

F51

F50

F50

4800

4800

F49

F49

4800

4800

F48

F48

4800

4800

F47

F47

4800

4800

F46

F46

4800

4800 MID-RISE OFFICE

F45

F45

4800

4800

F44

F44

4800

4800

F43

F43

4800

4800

F42

F42

4800

4800

F41

F41

4800

4800

F40

F40

4800

4800

F39

F39

4800

4800

F38

F38

4800

4800

F37

F37

4800

4800

F36

F36

4800

4800 MID-RISE OFFICE

F35

F35

4800

4800

F34

F34

4800

4800

F33

F33

4800

4800

F32

F32

4800

4800

F31

F31

4800

4800

F30

F30

4800

4800

F29

F29

4800

4800

F28

F28

4800

4800

F27

F27

4800

4800 LOW-RISE OFFICE

F26

F26

4800

4800

F25

F25

4800

4800

F24

F24

4800

4800

F23

F23

4800

4800

F22

F22

4800

4800

3600

3600 M&E EXHAUST

F21

F21

F20

F20

F19

F19

F18

F18

F17

F17

F16 F15 F14 F13 F12 F11 F10

F16 F15 F14 F13 F12 F11 F10

F09

F09

F08

F08

M&E

F07

F07

PARKING

F06 F05 F04

F06 F05 F04

F03

F03

F02

F02

F01

F01

B01

B01

MID-RISE OFFICE

276000

276000

M&E EXHAUST MULTIPURPOSE & DINING

INFORMAL MEETING/WORK AREAS

34800 WORKOUT/ACTIVE USE

WORKOUT/ACTIVE USE

GARDENS

GARDENS

34800

34800

32900

32900

CAFE, F&B

3500

3500

3500

3500

3500 SERVICED RESIDENCE 3500

3500 3500 3500

3500

3500

3500

SR 7000 CHECK IN & AMENITIES

7000

SERVICED RESIDENCE

SR CHECK IN & AMENITIES COOLING TOWER

19950

OFFICE,CITY SR, PUBLIC ROOM LOBBIES

OFFICE, SR, PUBLIC LOBBIES

M&E

M&E PARKING

COOLING TOWER

PARKING

4200

PARKING

3500

PARKING

3500

PARKING

6650 4200 4200 3500

7000

HAWKER CENTER

7000

HAWKER CENTER

7000

19950 HAWKER CENTER

7000

5950 7500

RETAIL

22050

3500

HAWKER CENTER

RETAIL M&E

6650 4200

22050 PARKING

PARKING

CITY ROOM

142800

4900

4900

19950

142800

LOW-RISE OFFICE

INFORMAL MEETING/WORK AREAS

CAFE, F&B

23500

MID-RISE OFFICE

MULTIPURPOSE & DINING

34800

23500 10500

5950 7500

19950



METZLER TOWER

Shifting Terraces 56

65.000 M2 m2_ COMPETITION Frankfurt is a unique urban setting that combines the classical European perimeter block city with high-rises forming a vibrant cluster in the city centre. We propose a tower that is derived from a careful study of the site and program, and as a result creates a strong presence both on street level and in the skyline. The program is a unique mix of two types of offices, residential, and public program. Each part of the height of the tower has its own constraints and potentials. The tower reacts to the constraints and potential of each specific height and program, creating a silhouette that is both rational and sculptural. The tower is articulated as a slender and rational stack of inhabited floors, interrupted by two sculptural moves where the program changes. At street level, the floors are shifted back and forth to create inhabitable terraces and canopies facing the park. In the middle of the silhouette where the program changes to residential, the floor plates slide out in a spiralling movement creating terraces and views up and down the streets for the residents. In the upper part the tower returns to the simple stack of floor plates epitomized for offices.





Contributions: Facade desing studies, coordination meeting with suppliers and details

Recommendation letter

and drawing production during the detail design fase, concluding with the construcction of the project. Collaborators: OBF Rådgivende Ingeniører

Date: 30 October 2019

West Don Lands Site Plan Application and Permit drawing set

To whom it may concern,

Housing + Retail

Teresa Fernández Rojo has been employed as an Architect at COBE A/S from 1 December 2016

Size: 60000 m2

to 31 October 2019.

Client: WDL 8 GP inc. Contributions: Facade desing studies, coordination meeting with client and detail and

Teresa has been a steady workforce during her stay at COBE, and she been involved in a wide

drawing production for the permit drawing set.

range of projects, spanning from architectural design, and competitions to detailed design.

Collaborators: Architects Alliance, Claude Cormier+ Associés inc., Thornton Tomasetti, M.V.Shore Associates, Cole Engineering Group Ltd., Terraprobe, Desifn Agency, RWDI,

Teresa has been engaged in the following projects, adding great value to the overall results of the

WSP, Jensen Hughes

different projects, with specific responsibilities on more of them: Christiansholm Skitseforslag, Dispositionforslag

Climate House, Oslo, Norway

Mix used

Competition for a museum

Size: 45000 m2 + 25000 me basement

Size: 700 m2

Client: Danica Properties

Client: Naturhistorisk museum, Oslo

Contributions: Design studies, façade coordination, and material production for

Contributions: Project leader, concept development, and competition material

Skitseforslag and Dispositionforslag.

production.

Collaborators: MOE A/S Rådgivende Ingeniører, Inside Outside landscape

Collaborators: Kossmann. Dejong, exhibition architects, BUROHAPPOLD ENGINEERING. During her time at COBE, Teresa has shown great qualities as an architect on several levels,

Scrivener, Toronto. Canada

spanning from idea and concept phases towards design development, but has over the years also

Schematic Design

developed into a detailed design architect, always taking responsibility of her work and deadlines.

Housing Size: 30 000 m2

Teresa has a good sense of design, composition, and a systematic approach to studies and

Client: Diamond corp and TRICON development group

problem solving.

Contributions: Desing studies, coordination meeting with the client and collaborators and drawing production during the schematic design phase concluding with the

As an employee at COBE, Teresa has been appreciated by all co-workers, from the management

submision for the City of Toronto design Review Panel.

team to architects and interns, adding great value and atmosphere to the office spirit, also as

Collaborators: Graziani + Corazza architects inc. , ERA, J.D.BARNES, COLE

head of COBE Social.

ENGINEERING, Claude Cormier+ Associés Landscape Architecture and Urban Desing, I can warmly recommend Teresa Fernández Rojo as a thoughtful and inspiring architect, and

BA Group, Urban strategies inc.

wish her all the best in her future career as an architect.

RJV_ Social Housing, Ørestad

Please do not hesitate to contact me if you need further information.

Schematic design and Detail design Housing Size: 7500 m2

Eik Bjerregaard

Client: AP pension

Project Director eik@cobe.dk

1

2


BIG 03. October 2016 To whom it may concern, I am pleased to offer my recommendation for Ms. Maria Teresa Fernandez Rojo. Teresa has worked at Bjarke Ingels Group (BIG) since April 2013 as an architect, and I have had the oppor‐ tunity to get to know Teresa in my capacity as the partner‐in‐charge of a project for a mixed‐ used tower in Singapore that is currently in the detailed design phases. Teresa has also collabo‐ rated within the office on numerous other ongoing projects representing a spectrum of typolo‐ gies and in various phases of design such as a mixed‐use tower for Frankfurt, the Blåvand Bun‐ ker Museum in Western Denmark, Maison de l'Economie Créative en Aquitaine se dévoile (MÉCA) in Bordeaux, and Stettin 7 residential development in Stockholm. Teresa has a well‐rounded set of skills (from 3D modeling, drawing, and visual representation), as well as a professional attitude and focus on the tasks at hand, frequently under heavy time pressure. Her positive can‐do attitude and sense of responsibility makes her a true pleasure to work with, and allows her to quickly become an essential player within the team. In addition, Teresa’s ability to work independently and strong problem solving skills has allowed her to be successfully involved in multiple project phases and especially in conceptualizing and imple‐ menting design intent sketches into detailed design drawings. I have no doubt that she will make a valuable contribution to any team or studio in which she chooses to advance her career. The following is a select list of key projects in which Teresa has assisted: SING Singapore Mixed Use Tower (Confidential Client) 2015 – present : 105,000 m2 : Singapore, Singapore Teresa worked on this project from concept through schematic design and was responsible for multiple major building parts and their development from initial design ideas through to im‐ plementation and communication with the internationally‐based client and consultant team. Teresa effectively put extensive and exhaustive effort into developing multiple solutions to a high level of resolution, within a tight frame. METZ Omniturm Tower (Confidential Client) 2015 – present (construction): 65,000 m2: Frankfurt, Germany She worked in this project during schematic design, being in charge of the residential section of the building, coordinating the efficiency and design of the apartments layout with the facade and structure solutions. MCB Museum Center Blåvand 2012 – present (construction): 120,000 m2: Billund, Denmark She was the architect in control of the drawing set and I produced almost all final drawings for the DD. She was also full integrated in design solutions starting from optimization of plans to contributing to design of the individual details. MECA Bordeaux Métropole Aménagement 2012 ‐ Present (construction): 12,350 m2: Bordeaux, France Teresa started in this project working as an design assistant, becoming architect after few months. She worked during the APD, APS, and APD phases.

I can only imagine that Teresa will continue to excel in every way possible. I have every confi‐ dence in her future, and I would like to give Teresa my highest recommendation. Please do not hesitate to contact me if you have any additional questions. Best Regards,

Brian Yang Partner, BIG M +45 25 10 44 79 brian@big.dk

BJARKE INGELS GROUP KLØVERBLADGADE 56 2500 VALBY DENMARK T +45 7221 7227 F +45 3512 7227 WWW.BIG.DK


11-10-2011 / Page 1 of 1 / Copenhagen

ADEPT

Recommendation: Teresa Fernández Rojo Teresa Fernández Rojo was an intern at ADEPT from 1.02.2011-1.6.2011. It has been a pleasure to have Teresa Fernández Rojo as an employee in our office. From the very beginning the collaboration was very engaged and professional. During the period of working at ADEPT, Teresa Fernández Rojo evolved to become a valuable employee. At the office Teresa Fernández Rojoworked on the following projects: Masterplan, Fredericia,Denmark Masterplan, Asker, Norway Elderly houses, Copenhagen, Denmark Teresa Fernández Rojo worked in various scales involving both architecture and urban planning. By being involved in different types, scales and phases of projects, Teresa Fernández Rojo developed a wide series of architectural tools. At ADEPT, Teresa Fernández Rojo was always part of a project team, and was from the very beginning a very openminded and positive person. She combines a good mood with a professional approach and due to that it was always a pleasure to have Teresa Fernández Rojo at our office. We wish Teresa Fernández Rojo all the best for the future, and we truly recommend her to any other architectural office. Feel free to contact me for further information. Sincerely

Anders Lonka Architect and founding Partner alo@adeptarchitects.com +45 30296049 ADEPT 1. ADEPT - [’adept] sb. Master (at, in) adj. skilled, competent. 2. ADEPT - architecturedepartment (a-dept). ADEPT’s approach is to develop very contextual projects which add value to its urban environments without compromising the specific brief. Experience has shown that this approach does not only promote better cities and urban spaces, it also creates a synergy in relation to economically, socially and ecologically sustainable developments. ADEPT is based in Copenhagen, Denmark and works within the fields of architecture, urban planning and landscape design. ADEPT is founded and lead by architects: Anders Lonka, Martin Laursen and Martin Krogh. The office only takes part in deliberately selected projects. Therefore it is able to achieve a high level of quality in each single contracted job. The Company has within the latest year won numerous international competitions.


M. Teresa Fernรกndez Rojo teresafrojo@gmail.com +34 618820496 +45 31372555


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.