M. TERESA FERNÁNDEZ ROJO //PORTFOLIO 2020
M. Teresa Fernรกndez Rojo teresafrojo@gmail.com 17/ 05/ 83 Spain +34 618820496 +45 31372555
PROFESSIONAL EXPERIENCE COBE
Architect MAA Copenhagen, Dicember 2016- Diciembre 2019
BIG/ Bjarke Ingels Group
Architect MAA Copenhagen, April 2013- July 2016
BIG/ Bjarke Ingels Group
Architect assistant Copenhagen, January 2012- July 2013
COMPUTER LITERACY Autocad Proficient Rhinoceros Proficient V-ray Proficient Grasshopper Basic Archicad Proficient Revit Good level Photoshop Proficient Illustrator Proficient InDesign Proficient
ADEPT
Architect assistant Copenhagen, 2011
HOLSCHER NORDBERG
Architect assistant Copenhagen, November 2010, January 2011
EDUCATION MADRID POLYTECHNIC UNIVERSITY ( ETSAM) (2002-2010) ÉCOLE NATIONALE SUPÉRIEURE D’ARCHITECTURE DE PARIS-LA VILLETTE - (ENSAPLV) (2005-2006)
LANGUAGES Spanish Native English Full professional proficiency French Basic communication skills Danish Level 2
PROFESSIONAL EXPERIENCE_ Selected project.
STIANSHOLM eprojekt, byggeri og landskab på øen
COMPETITION
IN CONSTRUCTION ROBERT JACOBSENS VEJ 73 FARVESTUDIER 2017.10.27
Totalrådgiver
CHR
Trangravsvej 6
Underrådgiver, landskab
Christiansholm Island
Architect M.A.A Concept, S.D, Role: Facades coordination 3D design solution. COBE_ Client: By og Havn- CØ P/S Location: Copenhagen, Denmark Size: 40,000 m2 Status: Detail design.
KLIMATORIUMET Naturhistorisk Museum
SUMMERHILL
RJV- ØRESTAD
KLIMAHUSET
Architect M.A.A
Architect M.A.A Revised concept/ SD/DD Role: 3D desing solutions and BIM drawings
Architect M.A.A Competition Role: Project leader.
Eerste Nassaustraat 5
1436 København K
1052 BD Amsterdam
Scrivener square tower Schematic design
Role: Facade coordination COBE_ Client: Diamond Corp Location: Toronto, Canada Size: 30.127 m2 Status: DD
Museum Center Blåvand
COBE_ Client: AP pension Location: Copenhegen, Denmark Size: 7500 m2 Status: In Construction,
COBE
Naturhistorisk Museum, Oslo
COBE Location: Oslo Size: 700 m2 Status: Idea
PROFESSIONAL EXPERIENCE_ Selected project.
Project Glory Design Update
June 29 2016
IN CONSTRUCTION
T
SHIFTING TERRACES
Metzler Tower Frankfurt
PRESENTATION BOOK
SING
METZ
Architect M.A.A Concept, S.D, D.D Role: Drawing set coordination, 3D design solution.
Architect M.A.A
Mix- Used tower
BIG_ Client: Capitaland Location: Singapore Size: 95,000 m2 Status: In Construction.
Metzler Tower
MCB
Museum Center Blåvand
Architect M.A.A Revised concept/ SD/DD/ Tender Schematic design Role: Coordination residential area Role: BIM Drawings coordination 3D desing solutions BIG_ Client: Confidential Location: Frankfurt, Germany Size: 65.000 m2 Status: In Construction, Completion in 2018
BIG Location: Blåvand, Denmark Size: 2.500 m2 Status: Completed (2017)
DONG
Frederiksborgvej, 73 Architect M.A.A Schematic Design Role: BIM Drawings.
BIG Location: Copenhagen, Denmark Size: 10.000 m2 Status: Completed (2017)
IN CONSTRUCTION
ST7
MECA
COMPETITION
TM2
Setettin 7 Housing
Culture house en Bordeaux La Defense
BIG_ Client: Oscar Properties Location: Stockholm, Sweden Size: 20.000m2 Status: Completed (2018)
BIG_ Client: Conseil Regional d’Aquitaine Location: Bordeaux, France Size: 12,350 M2 Status: Under Construction
Architect M.A.A Schematic Design Role: BIM Drawings
Architect assistant/Architect M.A.A Architect M.A.A Competition PRE/APS/APD/DPC/PCG Plan set Drawings (autocad) Role: Illustrations/ 3D/ drawings BIG Location: Paris, France Size: 40,000 M2 Status: Idea
SMN
Natural History Museum Architect assistant Competition 3Dmodeling/Illustrations
BIG Location: Copenhagen, Denmark Size: 38,000 M2 Status: Idea
PERSONAL WORK_ Selected project
2017
2015
COMPLETED
2014
COMPETITION
// 3rd Place_
DUAL
LOMA SOMERA
RINGEN
Architect M.A.A Role: Concept, project Management
Architect COAM_ Madrid Comision Role: Concept, drawing, site Management
Architect M.A.A Competition Arkitektforening Role: Physical and 3D Models, illustration
Pavillion for GL HoltegĂĽrd Museum
Team: Camila Andrade Buschle, Sofia Adolfsson, Location: Holte, Denmark WStatus: Finished
Family house renovation
Team: Armor Gutierrez Rivas Location: Cantabria, Spain Size: 350m2 Status: Finished
Pavillion MAA 2015
Team: Sofia Adolfsson, Camila Location: Copenhagen, Denmark Size: 289.5m2 Status: Idea
CHRISTIANSHOLM ISLAND CLIENT _By og Havn and CĂ˜ P/S The vision for the project is to create a series of new halls for informal, public functions such as an event hall and a swimming hall. Private housing will be placed on top of the halls which encircles a green and intimate courtyard. The whole island will be flanked by a unifying public promenade. The existing vivid public life is balanced with the private life of the future inhabitants to make the island attractive for visitors as well as local residents During 2018, COBE has been running a series of workshops the requirements for the construction project of the island. After the development of the local plan, this phase contains studies of the floor plans and areas, placements of functions, room heights, disposition of stairs and cores, determined for parameters such as apartment sizes, and fire strategy. We are developing different facade solution to accommodate the diverse typologies granting character and a unique identity to each of the buildings.
COBE
INSPIRATION Papirøens warehouses
Boliger
Nye haller
Existing halls
+ 1. Halls The new buildings are inspired by the existing industrial halls at Christiansholm, manteing the same tectonic and langage as ”building machine”.
2. Warehouses From the local plan: ”Development in the area must be based on the character of the buildings along the harbor, and must be designed and presented as a new interpretation of Holmen’s and Christianshavn’s warehouses”
ARCHITECTURE PRINCIPLES
1. Open gables
2. Monolithic expresion
3. Caracteristic features for every cluster
East/West facade are light and transparent.
Througout the roof to the vertical facades and arcades, the architectonic expresion and materiality is the same.
Every cluster holds different progams and it will have a unique facade traitement creating diversity within the a coherent ensemble.
140 mm WINDOW SETBACK
HORIZONTAL BRICK- FLIPPED MORTAR POCKET
60 mm ELEMENTS JOINT GAP 90 MM WINDOW SETBACK
VERTICAL BRICK
35 MM ELEMENT JOINT GAP
12/ 18 MM MORTARGAP VARIATION 50 mm WINDOW SETBACK 120 MM SETBACK HORIZONTAL BRICK 170 MM WINDOW SETBACK
DL 1:10
CB
C3
Sten 01
C1 96 m
Sten 02
m
72
m
m
16.7° Topprofil: L = 965mm
96 m
710
100
m
Sten 03
40
20 m m
192
8
Sideprofiler: L = 910mm
X
m
DV 01
18
8m
mm
F.G.
16
120
362
16
XX - muremål 362
362
120
DL 01
362
m m
200
325
Påsvejst PF 3500
10
16
40
67 °
Sålbænk-profil: L = 965mm
mm
54 mm
(X) 2 86
925
110
26 m m 20 m m 26 m m
A
972
(A) 1 6
228
mm
Huldæk
ig l b ø l forb
DV 1:10
18
CHRISTIANHOLMS BRICK- DESIGNED AND PRODUCED FOR THIS PROJECT
Snit 1:100
16
Facade 1:100
9 1 0 2 . 09 . 9 0 tryk
Skillevæg 972
De historiske pakhuse langs havneløbet.
500
110
300
650
180
312
6 30
12°
Sideprofiler: L = 910mm
Neopren strimmel 30
110 16
482 860
30 30
COLOR AND TEXTURE REFERENCES
COBE - skitse - SK_ARK_219 - 3D Mock up 09-09-2019 CHR. HOLM
SCRIVENER SQUARE, TORONTO Competition CLIENT - Diamond Corp How can we create a new housing development at the Scrivener Square site,that fits into the diverse and distinstive context of Summerhill and at the same time enhances the existing qualities of the immediate surroundings?
We answered that question dividing the tower into two interlocked elements: the podium that gets its architectural language and scale from the brick surrounding buildings, and the tower which architecture relates to the North Toronto train station clock tower, creating a new housing development on top of a new vibrant public space. The tower divided in 4 volumes and the crowns in different heights defines the new addition of the Toronto skyline and stands as a unique landmark at the Summerhill subway stop.
COBE
Lamella Screen A screen of vertical lamellas in front of the glass maximizes views out from the interior apartments, while self-shading the glazing and reducing glare
Lamella Screen Plan Diagram
60 cm
80 cm
FLOOR PLAN PODIUM_ LEVEL 4 2087 m2
FLOOR PLAN MID-RISE_ LEVEL 10 641 m2
FLOOR PLAN HIGH-RISE_ LEVEL 20 448 m2
/ FLOOR
4 UNITS / FLOOR
Library
BR
Bedroom + Den
Foyer
BR
Living
2 Bedroom 2 106 m Unit 3 Bedroom
Kitchen Laundry
2
8m
Kitchen
Foyer BR
Living
2 Bedroom + Libr
BR
180 m
Foyer
180 m2
Lobby
2
Laundry
Den MBR
Kitchen
Laundry
WIC
WIC
Kitchen
WIC
Bedroom + Den
Den
Living
Kitchen
BR
MBR
2 Bedroom + Den
Laundry
WIC
2
MBA
113 m
2
3m
WIC
Foyer
Laundry
Foyer
MBR
Foyer
Laundry
MBR
BR
Foyer WIC
MBA
MBA
Foyer
WIC
MBR
Living
Kitchen Laundry
2
125m
BR
MBR
BR
Kitchen
Living
2
Kitchen
Den
Den/Library
K
2 Bedroom + Libr 180 m2
Laundry MBR Living
2 Bedroom + Den 190 m
Office
Foyer
MBA
2 Bedroom + Den
WIC
Den
Laundry
WIC Foyer
WIC
BR
Bedroom + Den
8m
Living
Living
BR
2
Living
Living BR
6 UNITS/ FLOOR (103- 148 m 2)
BR
4 UNITS/ FLOOR (180- 190 m 2)
KLIMAHUSET, OSLO
COBE
Competition CLIENT _UiO Naturhistorisk museum, Oslo Located in the Tøyen’s Botanical Garden, the competition brief, encourages the design of a iconic 21st century museum, yet a fundamental reflection of the park’s landscape and a great empathy with the existing historical buildings. It is this delicate balance what drives the sketch process, resulting in a simple, functional and characteristic architecture. Our ambition was to create a dynamic meeting place for sensory experiences and exploration of the solutions to current climate issues, the Climate House is to inspire visitors and the general public to change towards a sustainable way of life.
FREM VITEN
Utstillingen
Auditoriet og undersøkelser.
I kunnskapsk utstillingene. tidligere samt til en rekke al forskere.
Gå inn under b
Observerer og
The Climate House, is especially, a place for reflexion. The hole in the ceiling frames today’s weather out and is an invitation to observation,and appreciation. In the lobby there will be 4 large transparent columns filled with moving and color-rich air. They represent the principal elements that scientific uses to study climate evolution (light, precipitation, greenhouse gases....). So the building is, literally, the filter that helps us to understand the Climate and the human impact on the environment.
Valgmulighet: et
WEATHER
I DAG OBSERVERE
INNENFOR
STUDERE
UTENFOR
Luftrensende
HAGEN MUSEUM
VÆRET STRUKKET UT OVER TID OG PLASS
UTSTILLING
KLIMAET KLIMA Lokale arter
Et museum som omfavner stedets skala
Været + Tiden
Vannrensende
I hagen iscenesettes klima-tematikken for den besøkende med dens vannhåndtering og beplantning
En plattform som deler kunnskap for alle Spiselige planter
LAR
BUS
Sofienberggata
Sofienberggata
BUS
KLIMA HAGEN Sar
Sar
s Gat
s Gat e
e
KLIMATORIUM
P S
Oldemors hage Systematisk hage
Monrads Gate
Monrads Gate
EL
Aboratet Veksthus Dufthagen Fjelhagen BUS
Rød- og svartslistebed
BUS
Urtehagen Osloryggen
s Bje e
s Gat
lke
Skape bevisthet om klimaet og la mennesker erfare værets manifest
Jen
Den skal være et godt eksempel for bærekraftige bygninger
a
a
en
Gat
en
Tøy
KLIMATORIUMET Været + Tiden
Klimahuset søker å gjøre klimaforskning konkret og forståelig. Det hjelper folk til først å observere og deretter studere det usynlige. Hele bygningen er viet til dette. Hullet i taket danner en ramme for dagens vær – invitasjon til observasjon og verdsettelse. Auditoriet og taket er konstruert lagvis, noe som fremkaller en følelse av tid og funn - iskjernene eller årringene som gjør at klimaforskere kan forstå klimaendringene som har pågått i millioner av år. I lobbyen vil det være store transparente søyler fylt med bevegelig og fargerik luft (som forestiller sollys, en sandstorm, klimagasser og nedbør) som bringer været fra atmosfæren, forbi lag av tid, til utstillingsgalleriene under. De er klimakanaler - de frakter elementene som utgjør og influerer klimaet på jorden til de besøkende, og lar dem utforske disse videre i utstillingsgalleriene. Utstillingsgalleriene på grunnplanet er vitenskapsverkstedene som fremmer ikke bare observasjon, men også eksperimentering og analyse.
Flyt av stier i hagen
Gat
Tøy
BUS
T
En ny hage i den Botanisk Hage
Kommuniserer med omgivelsene og den vakre Botaniske Hage
PASSER INN I OMGIVELSE
En enkel, solitær og karakterfull bygning som kobler seg på et nytt, romlig hageanlegg, som danner nisjer, sitteplasser og forskjellige muligheter for opphold og aktivitet. Størsteparten av det nye museumsareal er lagt under bakken, men den transparente paviljongen er plassert fritt i parken og gir med det et innblikk til byggets funksjoner; amfirommet og museets utstillingsarealer i det indre. Taket på bygningen er samtidig et utheng, som skaper ett overdekket uterom og gir mulighet for opphold mens man for eksempel venter på å bli hentet, eller på å få følge. Uthenget leder en inn til et romslig område, hvor de besøkende kan få et overblikk og orientere seg. På den andre siden av glasset forvandler paviljong bygningen seg til en stor foajé og blir med det til et sentralt orienteringspunkt. Her finner de besøkende informasjonen og billettsalget, en regulert entré til utstilling og adgang for alle til auditoriet. Bygningens interiør tenkes utført i tre bekledning i lyse og varme toner som får vegger, trapper og museumsmøbler til å harmonere. Gulvet er i betong. Det lyse indre skal få foajéens varme lys og atmosfære til å spre seg utover i hagerommet i skumringen, og på denne måten gi glød til vinterens snølag. Den brede amfitrappen, som er det sentrale oppholdsrommet har innebygde sitte- og oppholdsplasser, så personale og museumsguider kan starte omvisninger i overgangen mellom foajéen og museet. Museets indre er forankret i et sterkt visuelt landskapsgrep. Parkens beplantning og landskapets dype historie skal være en del av museets dramatikk. Situasjons Plan 1:500
Kommuniserer med omgivelsene og den vakre Botaniske Hage
En plattform som deler kunnskap for alle
En forsiktig og sensitiv relasjon til omgivelsene
Et sentralt samlingsted med takvindu som rammer inn været
En bygning som bokstavelig talt samler væreffekter for å forstå klimaet i på et langsiktig perspektiv Oppstalt SØR 1:200
Den skal være et godt eksempel for bærekraftige bygninger
Skape bevisthet om klimaet og la mennesker erfare værets manifest
Oppstalt ØST 1:200
DUAL GL. HOLTEGAARD Temporary pavilion. Competition
CLIENT _Gl. Holtegaard Museum (Holte, Denmark) Dual is the last winning of the three-year exhibition series Pavillon I-III - New architecture in the baroque garden of Gl. Holtegaard. The task was to create an artistic architectural space for the baroque garden, which freely interprets the theme of scenery based on Gl. Holtegaard’s history as home of Ludvig Holberg’s comedies, masquerade and the idea of the garden - and the world - as space for (self) staging. Dual is a self standing staircase, shaped as a perfect circle in plan that rises 2.5 meters from the ground. Halfway up, the platforms created in the middle of both arcs, and on the top, give the double staircase an overall sculptural expression as one big scene. Scenery is a simultaneous and very simple interpretation of the often magnificent staircase architecture from the baroque, where the stairs were used as scenes on arrivals and departures for major events in the substantial and powerful buildings.
PERSONAL WORK
7400
A2-040-3
569
1151
583
7400
2532
548
Between 1.4 - 1.5m acc. to cph steel
180
1260
1059
A2-040-1
Grass/ column Max. 0.2m A2-040-2
Compresed sand to level
8000
7400
50.00°
4400
DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER
køreplader 3x 2x 25 mm
GL. HOLTEGAARD
01 (no column)
CONSULTANT
HENRIK ALMEGAARD
DRAWN BY
02
27
60.00°
CSB
TF
Columns Ø48mm/4
PLAN
03
26 25
CHECKED BY
04 SCALE
05
25
A3 1:50
DATE
2017.05.08
DRAWING NUMBER
A02 - 20 - 002 06
24
23
07
7400
9.00° 08
22
8000 1700
21.00°
1300
09
21
10
20
2000
11
19 12
18 17
13 16
15
14
60.00°
POSITION OF COLUMNS SEE DRAWING A02 - 20 - 004 FOUNDATION SEE DRAWING A02 - 40 - 002
28.00° DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER
GL. HOLTEGAARD
CONSULTANT
HENRIK ALMEGAARD
DRAWN BY
CSB
CHECKED BY
TF
7400 4400
119.00 mm
01 27
Top Railing (Horizontal) Ø48mm
02
Baluster (Vertical) Ø48/4mm
03
26 25
04 05
25
06
24
Ø 48 mm 4mm / S235 23
07
7400
12mm / S235
9.00° 08
22
24.00 mm
4 3
12.00 mm
8.00 mm
8.00 mm
21
09
10 M12 Quality 8.8 11
20
48.00 mm 96.00 mm
8mm / S235 0.8mm Brushed/ stainless steel
19
DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051
18
12
BUILDING OWNER
GL. HOLTEGAARD
17
13
CONSULTANT
HENRIK ALMEGAARD
16
DRAWN BY
CSB
15
CHECKED BY
14 TF
4mm / S235
CONNECTION DETAIL PLATE AND BALUSTER
SCALE
A3 1:2
DATE
2017.04.04
DRAWING NUMBER
A02 - 40 - 003 Ø 48 x 4mm / S235
POSITION OF Grass BALUSTERS SEE DRAWING A02 - 20 - 003
DUAL Architectur Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051
DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER
12.00 mm
200.00 mm
GL. HOLTEGAARD HENRIK ALMEGAARD
48.00 mm Soil
BUILDING OWNER
CONSULTANT DRAWN BY
Ø 48.3 x 4mm / S235 11mm steel plate foundatinn S235
CSB
CHECKED BY
TF
CONNECTION DETAIL COLUMN AND PLATE
DATE
SCALE
A3 1:2
2017.04.04
GL. HOLTEGAAR
CONSULTANT
HENRIK ALMEGA
DRAWN BY
CSB
PLAN
DRAWING NUMBER
a5
10mm steel plate foundatinn S235
A02 - 40 - 001
SCALE
A3 1:50 DRAWING NUMBER
A02 - 20 -
25 mm steel plate ?? mm Gravel/ Sand
Soil
D
DUAL Architecture IVS Enghave Plads 23B, 2. th 1670 København V info@dual-architecture.dk +45 6128 6078 CVR 38435051 BUILDING OWNER
GL. HOLTEGAARD
VIEW FROM NORTH BRIDGE ROAD
SINGAPORE TOWER 93 000 m2_ COMPETITION CLIENT _Capitaland Located in the heart of Singapore financial distrid, the 280m tall tower, transforms the site of a former car park complex built in the 1980s. The building’s exterior façade consists of vertical elements that are pulled apart to allow glimpses into the green oases blooming from the base, core and rooftop. At the ground floor, visitors will be met by a public rainforest plaza and park, with garden paths and covered passages leading into the City Room, a 19m – high generous open space at the foot of the tower. The first eight floors of the tower are dedicated to a 299-units serviced residence including a wide range of facilities. The top 29 floors of the tower offer premium office spaces . At the core of the building between the hardscapes of the offices and residences are four connected levels of organic soft-scape, called the Green Oasis- a mesmerizing 30 open- air garden for work, casual strolls, relaxation, exercise and events.
CH & CECIL STREETS
1.6.3
4.11.2
Project Glory Design Update
June 29 2016
DESIGN OVERVIEW OVERALL GEOMETRY
THE GREEN SPRING HANGING GARDENS & HAMMOCKS, FL 21
1.6.3 DESIGN OVERVIEW OVERALL GEOMETRY
THE GREEN SPRING The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.
4.4 THE GREEN SPRING CONCEPT SECTION
The concept section shows approximate achievable heights of trees planted towards the interior of the Spring, based on identification of possible plant species from daylight (lux) studies.
Project Glory Design Update
June 29 2016
Not to Scale
1.6.3
Project Glory Design Update
June 29 2016
DESIGN OVERVIEW OVERALL GEOMETRY
ROOF GARDEN AND AMENITIES The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.
Roof Garden and Amenities Centralized MEP plantrooms are located on a single floor under a rooftop restaurant. The restaurant itself is connected to a roof garden that spirals up in a continuous and accessible loop in order to accommodate the varying height requirements of the MEP equipment below.
THE FACADE The Green Spring The office block is lifted to 280m AMSL in order to maximize its commercial value, and is connected to the Serviced Residences below by gesture of a single spiraling connection that also becomes a programmatic connection between live and work. The spiral between the office and SR tower is filled with lush, tropical and bio-diverse vegetation and is occupied with different types of amenities representing a spectrum of use between live, work, and play.
Roof Ga Centraliz floor und itself is c in a con accomm MEP equ
Roof Garden and Amenities Centralized MEP plantrooms are located on a single floor under a rooftop restaurant. The restaurant itself is connected to a roof garden that spirals up in a continuous and accessible loop in order to accommodate the varying height requirements of the MEP equipment below.
Facades Vertical extrusions mounted to the exterior of the facade as mullions run continuously from top to bottom of the building. These vertical elements are systematically deformed to accommodate the green and social spaces at the top, middle, and bottom of the building - a play between the orthogonal and the organic that both unifies and reveals pockets of green and activities in the tower. The facades and image of the building could be a perfect expression of its function and layout.
Facades Vertical as mullio building deforme at the to between unifies a tower. Th perfect e
origin
origin
I
80
I
80
6,5
H
7,5
00
6,5
H
G 00
COMMUNITY SPORTS/ MULTI PURPOSE
7,5
G
7,5
00
L
00
F K
7,5
F
A
VO ID
A
E
7,5
00
7,5
00
A
E
GLASS LIFT
Lif t L0 LR 5 Lif t L0 LR 6 Lif tC L3 CP 1 Lif tC L3 CP 0
Lif t L0 LR 4
Lif t L0 LR 2
A
Lif t L1 HR 9
S 2 tair 27 8 st 5/1 ep 71 s .4
A
VO ID
00
SKYLIGHT
S 2 tair 27 0 st 5/1 ep 75 s
A
A
FOREST COLONNADE UP START OF RAMP
7,5
CAFE
00
E
00
E
7,5
A
A
A
A
A
F
7,5
4
00
7,5
4
00
origin DATE
5
NAME
DESCRIPTION
7,5
REV
00
7,5
5
00
origin
DRAWING NO.
SING-
DESCRIPTION
PROJECT-
SD00-AD-FP-10-0000 PHASE - CONSULTANT - DRAWING TYPE - FLOOR NO. - BLOCKNUMBER
PROJECT
PROJECT GLORY
7,5
6
00
50 Market Street Singapore 048940 Singapore
PROPOSED ERECTION OF A 52-STOREY COMMERCIAL DEVELOPMENT WITH A BASEMENT AND COMPRISING SHOPPING / HAWKER CENTRE(AIR SPACE LOT) / SERVICED APARTMENT / OFFICE / MULTISTOREY CAR PARK AND ANCILLARY FACILITIES ON LOTS 00505N & OO660X-PT, TS 01 AT MARKET STREET / CHULIA STREET / CHURCH STREET
7,5
6
Lif t L2 SR 5
Lif t L1 HR 8
Lif t L0 LR 1
Lif t L1 HR 7 S2
Lif t L1 HR 9
Lif t L1 HR 4 Lif t L1 HR 3
9,0
A
00
A
COMMUNITY SPORTS/ PURPOSE
Lif t L1 HR 3
Lif t L1 HR 4
C
80
A S2
KITCHEN
2
9,0
F
SR LIFT
Lif t L0 LR 3
Lif t L1 HR 6
Lif t L1 MR 1 Lif t L1 MR 0 Lif t L3 SR 4
3,5
1
3 3
Lif t L2 Fire 0 Lif t L0 MR 8 Lif t L0 MR 9
Lif t L1 MR 2 Lif t L2 PL 8
Lif t L1 HR 5
Lif t L0 LR 1
ER RIS
Lif t L1 HR 8
Lif t L2 PL 7
80 3,5 Lif tC L3 CP 0
G
E AR SP
VO ID
Lif t L0 LR 2
PUBLIC LIFT
Y BB LO
Lif t L1 HR 7
T LIF
Lif t L1 HR 5
7,5
00 Lif t L0 LR 6 Lif tC L3 CP 1
Lif t L0 LR 4
Lif t L0 LR 3
ER RIS
Lif t L1 HR 6
E AR SP
TS EN SID RE
Lif t L1 MR 0
Lif t L0 MR 7
Lif t L0 LR 5
L0 R 9
Lif t L1 MR 1
SR
Lif t L3 SR 4
ER
RIS
H
T
SKYLIGHT
Lif tC L2 CP 9
Lif t L0 MR 8 Lif
tM
t L1 MR 2
Lif
Lif t L2 Fire 1
00
Lif t L2 Fire 1
Lif t L2 Fire 0
Lif t L0 MR 7
A A
VO ID
SRELEC
Lif t L2 PL 8
A
ER
RIS
Lif t L2 PL 7
T
SRELEC
A
B A
ON MM ER CO T RIS SR EC EL
A
80
2
7,5
A A 00 7,5
00 7,5
ON MM ER CO T RIS SR EC EL
CE
80
NOT ACCESSABLE
A
N NA
3,5
A
TE IN MA
I
3,5
1
Y BB LO
Y BB LO
R FO
J
C
K
A
SKYLIGHT
A
G IN HT FIG
AL TW CA
B
G IN HT FIG
S1
A
E FIR
C
PICNIC HILLS
E FIR
S 2 tair 27 0 st 5/1 ep 75 s
7,5
S1
7,5
A
D
00
S 2 tair 27 8 st 5/1 ep 71 s .4
00
A
Lif t L3 GS 5
A
A
D
00
7
9,0
CLIENT
00
7 9,0
CapitaLand Singapore Limited
00
168 Robinson Road #30-01 Capital Tower 068912 Singapore
3,5
3,5 80
8
8
BIG Bjarke Ingels Group A/S Carlo Ratti Associati
9
80
LEAD DESIGNERS:
9
RSP Architects Planners & Engineers CONSULTANTS: SECTION TITLE:
Floor Plan 10 SR DRAWING NO.:
SING- SD00-AD-FP-10-0000 GEZ. / GEPR.
XX/XX
DATE
8/22/2016
FORMAT
841X594 (DIN A1)
SCALE:
1:200
OUTDOOR SEATING
ion of the building, is consistent with ed concept with move one floor of and the alignment meter of the office & further reducing
ROOF
ROOF
F53
F53
F52
+380.00 9400
9400
14100
4000
4000
LMR
LMR
RESTAURANT
F52 14100
+380.00
M&E
9000
RESTAURANT
10500
M&E
9000
F51
F51
F50
F50
4800
4800
F49
F49
4800
4800
F48
F48
4800
4800
F47
F47
4800
4800
F46
F46
4800
4800 MID-RISE OFFICE
F45
F45
4800
4800
F44
F44
4800
4800
F43
F43
4800
4800
F42
F42
4800
4800
F41
F41
4800
4800
F40
F40
4800
4800
F39
F39
4800
4800
F38
F38
4800
4800
F37
F37
4800
4800
F36
F36
4800
4800 MID-RISE OFFICE
F35
F35
4800
4800
F34
F34
4800
4800
F33
F33
4800
4800
F32
F32
4800
4800
F31
F31
4800
4800
F30
F30
4800
4800
F29
F29
4800
4800
F28
F28
4800
4800
F27
F27
4800
4800 LOW-RISE OFFICE
F26
F26
4800
4800
F25
F25
4800
4800
F24
F24
4800
4800
F23
F23
4800
4800
F22
F22
4800
4800
3600
3600 M&E EXHAUST
F21
F21
F20
F20
F19
F19
F18
F18
F17
F17
F16 F15 F14 F13 F12 F11 F10
F16 F15 F14 F13 F12 F11 F10
F09
F09
F08
F08
M&E
F07
F07
PARKING
F06 F05 F04
F06 F05 F04
F03
F03
F02
F02
F01
F01
B01
B01
MID-RISE OFFICE
276000
276000
M&E EXHAUST MULTIPURPOSE & DINING
INFORMAL MEETING/WORK AREAS
34800 WORKOUT/ACTIVE USE
WORKOUT/ACTIVE USE
GARDENS
GARDENS
34800
34800
32900
32900
CAFE, F&B
3500
3500
3500
3500
3500 SERVICED RESIDENCE 3500
3500 3500 3500
3500
3500
3500
SR 7000 CHECK IN & AMENITIES
7000
SERVICED RESIDENCE
SR CHECK IN & AMENITIES COOLING TOWER
19950
OFFICE,CITY SR, PUBLIC ROOM LOBBIES
OFFICE, SR, PUBLIC LOBBIES
M&E
M&E PARKING
COOLING TOWER
PARKING
4200
PARKING
3500
PARKING
3500
PARKING
6650 4200 4200 3500
7000
HAWKER CENTER
7000
HAWKER CENTER
7000
19950 HAWKER CENTER
7000
5950 7500
RETAIL
22050
3500
HAWKER CENTER
RETAIL M&E
6650 4200
22050 PARKING
PARKING
CITY ROOM
142800
4900
4900
19950
142800
LOW-RISE OFFICE
INFORMAL MEETING/WORK AREAS
CAFE, F&B
23500
MID-RISE OFFICE
MULTIPURPOSE & DINING
34800
23500 10500
5950 7500
19950
MUSEUM CENTER BLÅVAND
2500 m2_ COMMISSION CLIENT _The Museum of Varde City & Vicinity Museum Center Blåvand integrates four independent institutions: a WWII bunker museum; an amber museum; a local history museum; and a gallery for special exhibitions. The existing bunker, a relic of WWII, sits in a nature preserve that prohibits construction, however an opportunity arose to build into an artificial dune, created during wartime to transport guns to the bunker. Four simple incisions into the topography create a sunken, central courtyard for the museum; as the dune rises around the site, footpaths plow straight into the landscape to allow access by foot. The courtyard is a point of connection amongst the four museums and is also the beginning of an underground exhibition tunnel leading to the restored bunker. The new intervention is the antithesis of bunker architecture; it is vacuum rather than volume, and transparency rather than heaviness. It is a new architecture of a light that simultaneously treats the historic site with sensitivity but also injects elements of surprise and discovery as the journey down into and through the new museum unfolds before its visitors.
FOUR MUSEUMS
SUNKEN VOID
PATHS TO MUSEUM AND LANDSCAPE
3
4
1.400
5
2.165
3 K01_N302
6
5.710
7
12.975
3.100 52.825
8
K01_N411
2
2.600
2 K01_N301
5
6 K01_N303
1
9
7.400
10
3.100
11
12.975
1.400
12
N
2.600
Teknik
Teknik
T.03
2.000
T.01
2.000
T.01
2.000
2.600
A
Teknik
(250) 22.001 Type 2 (250) 32.004
2.800
300
U.31
Gang
23.225
(250) 32.002 Type 1
Slangevinder
Se rumtegning K01_N442
6.270
Se rumtegning K01_N435 U.02
(250) 32.003 T1
1.654
6.755
TR-02
5.430
1.654 1.654
Teknik
(250) 32.003 T1
K01_N404
9.532
16.010
U.30
Se rumtegning #LayID
(240) 22.001
(240) 22.001
Flugtvejsgang
I.09 F119 Se tegning
12.875
Teknik
Ravmuseum
1.305
Toilet
Se rumtegning #LayID
(240) 22.001 (370) 32.002
850
U.12
#LayID
U.10
Histolarium
4 K01_N302
2.158
23.225
U.01
Se rumtegning K01_N446
K01_N405
1.495
4 K01N_302
TR-03
T.07
1.339 (240) 22.001
K01_N402
Se tegning K01_N593 og N594
(285) 32.002
Flugtvejsgang
2.150
Se rumtegning K01_N443
I.10
Bænk
2.800
Udstillingsgang
(240) 22.001
Slangevinder (285) 32.002
(285) 32.002
1.300
K01_N5054 U.18
3.068
(250) 32.002 Type 1
12.725
3.250
300
K01_N5063
Madpakkerum
Gang
U.16
12.725 (285) 22.001 Type 5
U.17
Udst.
7.675
1.300
1.300
2.950
B
Se tegning #LayID
1.950
Ovenlys
C
1.876
2.800
3.400
8.140 (370) 32.004 Brandskydeport
Se tegning K01_N5084
K01_N5052
5.080
2.100
U.26
Omklædning/Bad509
1 K01_N301 Udstillings nicher
U.05
3.662
Se rumtegning K01_N441
(250) 32.001 Type 2
Se rumtegning K01_N444
U.08
3.467
(250) 32.001 Type 2
Midterrum
2.300
(370) 32.002 Type 1
Se rumtegning K01_N436 Se tegning K01_N5080
Slangevinder
8.140
K01_N403
Garderobe
U.13
1.142 1.800
I.02
Trappe 1 Se tegning K01_N412 5.320
E (250) 32.002 Type 1
.K01_N410
Fortsættes på tegning K01_N446
TR-03
2.113 2.077
K01_N5053
K01_N408 #LayID
K01_N5073
(370) 32.002 Type 3
2.808
2.100
2.580 7.515
16.825
Udstillingsgang
U.27
(370) 32.002 T1
Elevator
Udstillingsgang
U.15
Se rumtegning K01_N441
(250) 32.002 Type 1
Depot
41.950
Bunker Udstilling / Tunnel K01_N409
13.300
(240) 22.001
7.400
(250) 22.001 Type 2
Se tegning K01_N591 og N592 (240) 22.001
(240) 22.001
I.04
U.06
K01_N5071
Forrum
1.200
TR-05
2.500
2.074
Stoledepot U. 25
1.876
#LayID
U.28
(370) 32.001
D
(250) 32.001 Type 1
(370) 32.002 Type 1
2.274
Depot køkken
3.100
3.562
1.800
(370) 32.002 Type 1
1.910
20.275
(250) 32.002 Type 1
2.113
U.29
RevI ChID Change Name D
Date
K01_N102
1 K01_N301
(240) 22.001
(240) 22.001
Se tegning K01_N5083
1.300
Se tegning K01_N5082
2.800
2.800
3.100
U.07
8.075
Se tegning K01_N5089
(250) 22.001 Type 2
01 WIP
Udstillingsgang K01_N406 Se rumtegning K01_N441
2.525
Work in Progress
10.500 (250) 32.001 Type 1
1.950
(250) 32.002 Type 1
K01_N5074
K01_N5072
Teknik U.03
Toilet
Bunkermuseum
Slangevinder
Se rumtegning #LayID
Særudstilling
(240) 22.001 1.305
Se rumtegning #LayID
13.125
U.04
Se tegning K01_N5003
(240) 22.001
1.654
TR-04
IT/Tekn.
Se rumtegning K01_N434 12.725
10.025
U.23
K01_N404 I.11
5.430
Udstilling Opbevaring / Værksted
1.654
3.736
9.745
5.462
U.09
(240) 22.001
Se rumtegning K01_N447
(250) 32.003 T1
Rengøringsrum
1.654
K01_N405
U.24
(370) 32.001
12.875
T.04
850
U.11
Flugtvejsgang
2.731
(240) 22.001
Se tegning K01_N5088
(250) 32.002 Type 2
2.732
(370) 32.001
23.225
(250) 32.002 Type 2
1.915
1.858
150
Udstillingsgang
U.14
K01_N407
F
(240) 22.001
1.339 (370) 32.001
2.150
Se rumtegning #LayID
Se rumtegning K01_N444
2.800
Se rumtegning K01_N442
(250) 32.002 Type 1
Gang
(250) 32.002 Type 1
Udst.
1.300
U.32 U.19
32.002 (250)(250) 32.002 TypeType 4 4
(285) 32.002
Bænk (240) 22.001
2.950
1.250
Forrum
1.300
U.21
Slangevinder
(370) 32.001 Slangevinder
1.300
1.300
Wc (240) 22.001
F118 Se tegning
1.830
Flutevejsg.
I.12
(285) 32.002
2.520
(250) 32.003 T1
U.22
8.075 U.20
23.225
K01_N5054
Udstillingsgang
300
2.800
300
12.725
K01_N5054
1.500
G
2.600
(250) 22.001 Type 2
K01_N412 2
3
5
H
6 K01_N303
T.05
Teknik
2.000
2.600
(250) 32.004
REV
T.06
REV.DATO
BEMÆRKNINGER
INT:
Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark BYGHERRE: Museum Center Blåvand Fonden Bytoften 2, 6800 Varde
Hovedprojekt Tegn. nr.
Etageplan, Udstillingsniveau
K01_N102
C (520) 37.042 Beplantning på tag (520) 37.042 Beplantning på tag, Resevoir plader
C
(360) 47.041 Inddækninger (Varmgalvaniseretstål)
D
(370) 37.042 Tagdækning og Rodspærre
Værn på tag (250) 24 001
(360) 47.041 Stern, Vandfast uorganisk Plade (285) 31.001 Facade/Stern Bæreprofil (285) 31.001 Stern Isolering
Beplantning på tag (528) 37.041
Tag
610
Vari.
+18,740 45
(370) 37.042 Tagdækning/Isolering
30
T
OK Stern Varierer
100 (285) 31.001 Facade/Stern Beslag max. 60 mm
Tagdækning (360) 37.042 REF. K01_N542
(285) 31.001 Facade/Stern Beslag (285) 31.001 Deformation Tag
50
160
Se tegning K01_N409 Værn på tag (250) 24 001
5
225
62
7 40
7
K01_N5053
Beplantning på tag (528) 37.041 Tagdækning (360) 37.042) REF. K01_N542
(285) 31.001 Facade/Sternlukning Dampspærre Halfenizer Iht. Ing. Beton Iht. Ing. (370) 37.042 Tagdækning, Isolering (285) 31.001 Facade Type 3
Tag
OK Stern Varierer
250
(370) 37.042 Tagdækning, Isolering
Se tegning K01_N5053
(285) 31 001 type 3
K01_N401 MOD. 150
150
62
(250) 42.001 Stålkassetter, Akustikvægge, Gardingrav (380) 31.001 Gardiner, Type 01, 02 og 03 - Gardin, motor, aksel inkl styring
RÆKKEFØLGE FOR UDFØRELSE BEMÆRKNINGER INT: 1. -BETON KONSTRUKTIONER IHT. ING 2. -AFRETNING IHT. ING. 3. -(360) 37.041 BYGGEPALDSMEMBRAN 4. -(285) 31.001 GLASFACADER TYPE 1 OG 3, FODPLADE MONTERES BYGHERRE: Museum Center Blåvand Fonden 5. -(285) 31.001 GLASFACADER TYPE 1 OG 3, GLAS-OPMÅLING Hovedprojekt Bytoften 2, 6800 Varde 6. -(360) 37.041 FOAMGLAS UDLÆGGES (285)31.001 Glasfacade Type 3 Facadefod og Understopning 7. -(360) 37.041 TAGDÆKNING Tegn. nr. Slidsrende m. inspektionslem og fuge iht. ing. 8. -(285) 31.001 GLASFACADER TYPE 1 OG 3, GLAS-MONTAGE Detalje 9. -(360) 37.041 TAGDÆKNING FÆRDIGGØRES MOD GLAS PROFILER (360) 37.041 Tagdækning Sti/Gårdrum Byggepladsmembran/Foamglass/Tagmembran 10. -(285) 31.001 GLASFACADER TYPE 1 OG 3, DÆKPROFIL MONTERES Beton belægning og isolering iht. ing. 11. -ISOLERING OG SLIDSRENDE IHT. ING. Godk.: OE Sags nr.: 11072PLACERES/MONTERES Init.: FL Kontrol: OE Målestok:1:5 Dato: 19/12/2014 12. -BELÆGNING UDFØRES IHT. ING. STI BIG Kløverbladsgade 56, 250042.001 Valby INDVENDIG STÅLAPTERING T+45 77 32 57 00 www.big.dk ARKITEKT/TOTALRÅDGIVER OK BELÆGNING 12.140 13. -(285) 22.001, 35.031, Fald 1:40 INGENIØR Johannson & Kalstrup Østervang 2, 6800 Varde Type 01, 02 og 03 - Gardin, motor, T+45 75aksel 22 40 inkl 88 styring www.j-k-as.dk 14. -(380) 31.001 Gardiner, I (285)31.001 Glasfacade Type 3
150
REV
REV.DATO
(285)31.001 Glasfacade Type 3 fastgøørelsesbeslag 88 62 150 Tagdækning Sti/Gårdrum facade membraner (360) 37.041
Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark
Fuge for Slidsrende m. inspektionslem og fuge iht. ing.
K01_N5053
36
42
23
102
UK DÆK varierer
vari.
Se tegning K01_N5052
10
K01_N505
UK Varierer
1230
LED Stållofter T2 (250) 35.031 REF. K01_ N533
UK PX180 11.510
77
U.03 Bunkermuseum
KBE42/22 iht. ing. (250) 42.001 Stålkassetter, Akustikvægge, Fastgørelsesbeslag
Stål pladegulv (250) 43.021 REF. K01_ N524
FG + 8,140
IHT.Ing. K01_N527 Installationsgulv (345) 33.021
+8,140 +7,874
22
Installationsgulv (345) 33.021 REF. K01_N527
UK RB 66/42 11.390
40
Se tegning K01_N5073
(285) 31.001 Deformation Tag
575
UK KBE42/22 11.310
48
3
U.06 Bunker udstillingsgang/ tunnel
Afretning iht. ing. PX180 iht. ing.
73
2,770
U.02 Ravmuseum
UDSTILLING
Stålkassetter (250) 42.001 REF. K01_N508
200
Se tegning K01_N5051
Deformation max. 5 mm
UK loft +10,910 LED
180
220
Lys
I
Slidsrende Gardin (380) 31 001 PX 180 KBE 42/22
200
180 215
Gardin (380) 31 001
+12,140
+12,140
60
+12,085
260
+12,140
135
Slidsrende
65
Kostet beton (220) 37.041 REF. K01_N541
Sti
NOTE: #Notes
115 mm - 80 mm
27
48
UK LOFT 10.910
U
(250) 35.031 Stålloft Type 2 (250) 35.031 Stålloft Type 2 Beslag LED iht. ing.
GANG
(250) 42.001 Stålkassetter, U-Profil (250) 42.001 Stålkassetter, Akustikvægge (250) 22.001 Stålskeletvægge Type 2
REV
REV.DATO
(250) 42.001 Stålkassetter, Akustikvægge
BEMÆRKNINGER
I
Museumscenter Blaavand SAGSADRESSE: Tane Hedevej Blåvand 6857 Danmark BYGHERRE: Museum Center Blåvand Fonden Bytoften 2, 6800 Varde
3
45
5
95
95 300
5 45
Hovedproje
3
Tegn.
Detalje Init.: FL
K01_N505 Kontrol: OE
ARKITEKT/TOTALRÅDGIVER INGENIØR
Godk.: OE
Sags nr.: 11072
Dato: 19/12/2014
BIG
Kløverbladsgade 56, 2500 Valby
T+45 77 32 57 00
Johannson & Kalstrup
Østervang 2, 6800 Varde
T+45 75 22 40 88
Målestok
www.b
www.j-k-a
NOTE: #No
MECA
MAISON DE L’ÉCONOMIE CRÉATIVE ET DE LA CULTURE EN AQUITAINE 12350 m2_ COMMISSION CLIENT _ Conseil Regional d’Aquitaine This project brings together three cultural institutions into one building: the Maison de l’Économie Créative et de la Culture en Aquitaine—the MÉCA. Programmatic requirements defined by each school shape the MÉCA; the building is a loop, skewed and distorted to accommodate performance and backstage spaces, storage and archive rooms, and art galleries. The loop also frames a central, public space—an outdoor “urban room”—and opens the MÉCA towards the city of Bordeaux and the Garonne River. The “urban room” becomes a luminous frame for the vibrancy of Bordeaux and on special occasions, turns into a stage for performances, a screening surface for installations, and an open space for the urban life of Bordeaux to flow through and engage with the arts.
STATUS 133,000 SF / 12,350 M2 BUDGET BUDGET In Design COLLABORATORS 38 mil // 208.7 DKK 28 38 mil USD USD 208.7 mil mil2018 DKK // Sceno, 28 mil mil EUR EUR Expected Completion Freaks Freearchitects, Ducks Khephre LOCATION 237.5 mil 237.5 mil RMB RMB Ingenierie, VPEAS, Alto Ingenierie, Vincent Bordeaux, France Hedont, PBNL, MRYK & Moriceau, PH.A SIZE SIZE RDC ET MEZZANINE STATUS SF / 12,350 M2 133,000 133,000 SF / 12,350 M2 BUDGET In Design 38 mil USD / 208.7 mil2018 DKK / 28 mil EUR Expected Completion LOCATION LOCATION 237.5 mil RMB Bordeaux, France Bordeaux, France SIZE STATUS STATUS 133,000 SF / 12,350 M2 In In Design Design Expected Completion 2018 Expected LOCATIONCompletion 2018 Bordeaux, France
STATUS In Design Expected Completion 2018 PROMENADE CONNECTION VIEW FRAME
PROMENADE CONNECTION
VIEWING FRAME PROMENADE CONNECTION
VIEWING FRAME PROMENADE CONNECTION
URBAN LIVING ROOM VIEWING FRAME
94 URBAN LIVING ROOM
94 URBAN LIVING ROOM URBAN LIVING ROOM
94
MÉCA 112
PLAN
Th Ma un for Re Thi Bro Ma
uni Pro for bui Re Th bac Bro Ma fra un tow Pro for a lu bui Re int bac Bro spa fra
tow Pro aUrb lu bui and int bac and spa fra an tow gen Urb aand lu and int ext and spa an gen Urb and and ext and
an gen and ext
RINCIPE DE FAÇADE
NÊTRES DE 600 MM DE HAUTEUR - 3 LARGEURS: 1500, 1050 ET 600 MM
FAÇADE
MÉCA 79
STETTIN 7
18600 m2_ COMPETITION Stettin7’s site is an urban peninsula within a larger park setting. It is bounded on three sides by park and harbor with the only connection to built urban fabric to the north. Other buildings in equivalent positions along the park are cultural or institutional; they create social programs that increase public life and activate the areas around the park. By virtue of its catalytic position along the park, we have an unspoken opportunity and responsibility to create a generous urban condition, that will improve the urban space and public life. The courtyard typology generates a foil to the surrounding landscape - an intimate park within a park. Another category of elevated green space is created in the roof, by literally lifting the building from the park fabric.
5 m2 +11.880
6 m2 +11.880
5 m2 +11.880
5 m2 +11.880
5 m2 +11.880
6 m2 +11.880
G
G G
F
G
K
G
F K
G
F K
F TP
G
TP
G
TP
ST
EL
G
G
EL
K
EL
K
G
K
F
G
TP
G
G
F
F
ST
F K
EL
ST
HS
G G
TP
G
1.12.02 4.01A 4R 103 m2 +11.900
ST
K
G
F
1800 PARK
6 m2 +11.880
K
G
F
TP
K
5.12.01 3.14A 3R 87 m2 +11.900
F
TP
G
TP
G
TRH_5 24 m2 +11.900
5.12.02 1.03A 1R 40 m2 +11.900
TP
G
5.12.03 3.22A 3R 70 m2 +11.900
4.12.01 2.04A 2R 52 m2 +11.900
3.12.01 2.02C 2R 45 m2 +11.900
2.12.01 2.02A 2R 44 m2 +11.900
2.12.02 3.01A.M 3R 81 m2 +11.900
K
HS
F
HS
TRH_1 24 m2 +11.900
ST
HS ST
G
EL
HS
ST
1.12.01 4.01A.M 4R 103 m2 +11.900
K
G
TP
G
6 m2 +11.880
G G
G
G
G G
G
TP
TP
TP
TRH_4 22 m2 +11.900
ST
TRH_3 22 m2 +11.900
TRH_2 29 m2 +11.900
ST
HS
4.12.03 2.09A 2R 53 m2 +11.900
TP
F
4.12.02 2.01B 2R 55 m2 +11.900 G
ST
ST
K
3.12.03 3.02C 3R 81 m2 +11.900
TP
2.12.04 3.02A 3R 84 m2 +11.900
K
G
3.12.02 2.01B 2R 55 m2 +11.900
G
F
G
G
G
ST
G
G
G
G
G
G
G
2.12.03 2.01A.M 2R 55 m2 +11.900
G
F
G
G
G
G
K
G
G
G
G
G
G
G
G
G
6 m2 +11.880
G G
5 m2 +11.880
6 m2 +11.880
6 m2 +11.880
5 m2 +11.880
5 m2 +11.880
5 m2 +11.880
K F
G
G
6 m2 +11.880 G
HS HS
ST G
K
G
ST
TP
G
HS
G
6.12.02 3.33A 3R 86 m2 +11.900
G
HS
G
TP
6 m2 +11.880
F
G
TRH_6 19 m2 +11.900 K F
6.12.01 3.24A.R 3R 79 m2 +11.900
ST
ST G
G
EXTRUSION
12.12.03 3.01A 3R 82 m2 +11.900
TP
5 m2 +11.880
EL
HS
6 m2 +11.880 12.12.02 2.01A 2R 55 m2 +11.900
TP
G
ST
F
K
G
TP
G TP
G
5 m2 +11.880 HS
12.12.04 1.06A 1R 37 m2 +11.900
F
5 m2 +11.880
K
TRH_12 29 m2 +11.900
12.12.01 3.16A 3R 70 m2 +11.900
HS G
ST
7.12.01 3.05A.R 3R 75 m2 +11.900
EL
G
F
K
5 m2 +11.880
TP
TRH_7 16 m2 +11.900
G
ST
G
G
G
HS
G
F
K
K
G
F
5 m2 +11.880
G
G
G
G
G
G
G
G
8.11.01 D.07A.R +16.800 DUP. 3R 41 m2 +11.900
G
+15.600
Wooden Lamella Balcony
+13.950
+13.500
+14.700
Planter
+11.900
G
Shared terrace G
G
Ramp 1:25
ST
+13.800
Bench
typical plans
G
G
G
+13.200
Storage
ST
Private terrace
+11.980 +13.050
TP
Elevator Overheight
F
K
+12.900
G
G
HS HS HS
+15.600
ST
F
9.12.02 D.01A.R DUP. 5R 73 m2 +11.900
ST
EL
TP
G
10.12.01 3.02B 3R 77 m2 +11.900
TP
G
ST
11.12.03 3.06A 3R 83 m2 +11.900
TRH_9 24 m2 +11.900
F
K
K
TRH_10 24 m2 +11.900
+11.980
Chairs
Ramp 1:23
+14.550
+15.750
+12.750
7.11.01 terrase
+12.040
116 m2
1R Zone Category 1R 2R 3R 4R 5R 6R
F F
K TP
ST
9.12.01 4.06C.R 4R 104 m2 +11.900
EL
10.12.02 4.06A 4R 107 m2 +11.900
G
K
6 m2 +11.880
+12.120 +12.600
+13.800
+14.850
2R
TP G
+12.200 G
1. Floor
3R
Brandgasluckorna 1 x 1 m i pixel vägg
6 m2 +11.880
+13.200
+12.200
+12.300
G
+13.950
G
4R
Overview Net. Area 148 2.754 5.021 3.621 1.098 140
Quantity 4 52 65 36 9 1
12.782 m2
167
Sedum
6 m2
6 m2
Outdoor furniture
2,4 % 31,1 % 38,9 % Bins (Gr. floor) 21,6 % 5,4 % Grasscrete paving (Gr. floor) 0,6 %
6m
6 m2 +11.880
9 m2 +11.880
+14.400
+13.350
+12.750
+12.300
52 m
3R 2
2R 2
Terrace limitation
2
2R
52 m
64 m
Entrance
6 m2
2R 2
2R 2
Low vegetation
3R 2
77 m
64 m
78 m
Beams below 1,9 m
G
G
G
G
G
+15.150
5 m2 +11.880
DAYLIGHT
A-40.1-0040 +11.700
7.11.01 terrase
K
TP
ST
G
+15.000 G
F
EL
11.12.02 4.11A 4R 99 m2 +11.900
26 m2
26 m2
G
TRH_11 23 m2 +11.900
+15.000
7.11.01 terrase
+13.950
9 m2 +11.880
6 m2 +11.880
G
TP
ST
6 m2 +11.880
11.12.01 3.15A 3R 81 m2 +11.900
+15.000
+15.600 G
7.11.01 D.06A.R DUP. 4R 32 m2 +11.900
2R
100 %
49 m2
2R
LANDMARK
5R
46 m2
6R TYPICAL APARTMENT PLAN
3,6
N
7,2
Reviderings nr.
Beskrivning
9 m2
3R 2
71 m
10,8m
79&Park
0
1
2
3
4
RH 20002
6m
Adress: Sandhamnsgatan 79, S-115 28, Stockholm Byggherr: Oscar Properties Bygg AB, Linnégatan 2, Box 5123, SE 102 43, Stockholm
2nd floor Sign.: hk
Granskad: pbm
2R 2
Bygglovshandling
BIG
Gödkänd: fn
6 m2
N
5
Projekt no.: 11037
52 m
Ritningnr:
A-40.1-0040
Datum: 06-03-2015
15
Skala:1:100
A - BJARKE INGELS GROUPS - TEL. NO: +45 72 21 72 27
K - KONKRET - TEL. NO: +46 8 402 38 80
BRAND - DE BRAND - TEL. NO: +46 733 25 80 25
BH - OSCAR PROPERTIES - TEL. NO: +46 8 510 607 70
VVS - METATOR - TEL. NO: +46 8 642 77 50
AKUSTIK - ACAD - TEL. NO +46 8 556 211 40
79&PARK DESIGN REPORT 15-03-2015 BIG Architects
Kløverbladsgade 56, 2500 Valby, Denmark
T+45 72 21 72 27
2R 49 m2
big@big.dk
6 m2
3R 75 m2 6 m2 13 m2
4R 95 m2
6 m2
6 m2
6 m2
31.800
FACADE UPDATE
FACADE UPDA
MAIN DETAILS
MAIN DETAILS
600
Under development A08
+30.500 8 8th Floor
ROOF SURFACE
8
1. M
1.100
B02
+27.400 7 7th Floor
+27.400
A1 SCOPE LINE
A1 SCOPE LINE
2.795
3.800
3.100
400
1.
7
26 25
47
40
305
47
40
+8.800
M
+27.050
VARIES
305
26 25 +27.050
M
260
2.
350
55
1.
3.100
14
20
+23.950
10 8
350
1:100 slope
10 8
2.
VARIES
6
291
291
+24.300 6 6th Floor
350
1.
B06
+24.300
20
A04
Rail
14
2.500
2.840
120
3.100
Slope
+8.450 50 FACADE PLAN
B07
+21.200 5 5th Floor
305
5
+20.850
162
3.100
M
162
300 162
2.750
2.840
51
51
MIN. 53
+18.100
3.
4
3.
DETAILS MARKED WITH GREYSCALE TO BE COMPLETED IN THE FOLLOWING PHASE
190
FACADE PLAN
FACADE PLAN
+17.750
2.840
+17.750
2
C05 B08
260
B02 190
Rev
ID
A11
+11.550
Description
Date
BYGGHANDLING M
3.100
C04 B09
B03
A12
A02 C06
1
2
3
300
2.840
C07
B04
C17
B10
162 4
5
6
7
8
9
30 162
A13
A03 1
FACADE PLAN
N
+8.800 1 1st Floor
+8.800
A04 260
51
14
51
C03
2.910
26 25
14
C03
45 14
3.100
C01
+11.900 2 2nd Floor
14
14 20
2.
C08
+11.900
45
25 14
25
45 14 20 26 25
A10
C09
2.750
10
2.
A07
257
A16
300 350 350
A01
A08
14
305
305
C10 +14.650
M
+18.050
10
257
+15.000
C11
+18.100
A17
A18
3
350
1.100
+15.000 3 3rd Floor
M
25 25 25
3.100
2.840
2.910
A-42.0-0110_
GH. ARY015 N I M .2 LI PRE XX.XX
B01 A03
+14.650
10
45 14
260
1.100
MIN. 53
+18.100 4 4th Floor
Nummer_Rev.:
305
30 162
A02
14
305
+21.200
A1 SCOPE LINE
2.750
2.840
FACADE PLAN A05
FACADE PLAN
A14
B06
+8.450 Linnégatan 2, 102 43, Stockholm
A1 SCOPE LINE
21
PARTIAL ELEVATION - GLASS FACADE 1:50
PARTIAL ELEVATION - LAMELLA FACADE 1:50
25
25 25
M
45
25
25 14
+14.950
14 20
14
10
K - KONKRET - TEL: +46 8 402 38 80
EL - PROJEKTEL - TEL:: +46 8 562 856 00 BRAND - DE BRAND - TEL: +46 733 25 80 25
(BIG) 11033
Ritat:
Granskad:
350
26 25 350
3.
Projekt nummer:
xx.xx.2015
316
Datum:
10
150
I
AKUSTIK - ACAD - TEL: +46 8 556 211 40
0
3.
Godkänd:
Ritning:
3.600 23
22
26 25 350
J
316
23
Partial facade/section, Typical 22
PARTIAL FACADE SECTION 1:50
ISOMETRIC OVERVIEW FACADE Helskala, A1:
1:50
Nummer_Rev.:
A-42.0-0110_
27
8
24
al
K
+14.650
8
3.600 J
Parti
Line 24
110
3.600
+5.100 0 Groundfloor
on Secti
13
235
235 K
45
A2 - PROJIT AB (Invändig BH Projektering) - TEL: +46 6 412 26 50
A15
+15.000
VVS - METATOR - TEL: +46 8 642 77 50
+5.100
3.600
14 20
A1 - BJARKE INGELS GROUP (Fasad) - TEL: +45 72 21 72 27
A09 A06 A09
L
M
Sandhamnsgatan 79, Stockholm
3.160
3.160
3.700
10
79&Park
B07
A05
14
14
ROOF overviw isodrawing GENERAL INSTRUCTIONS REFERENCES A-40.1-0120 A-42.4-1420 A-42.4-1421 A-42.0-1210
Plan, Roofplan Roof Railing Types_R1 Private Roof Railing Types_R2 Public Roof Elevations
DETAILS
SIGNATURES CEDAR WOOD CLADDING CEDAR WOOD CLADDING - LAMELLAS CEDAR WOOD CLADDING - LAMELLAS, TURNED 45º. ID FOR SIDE WINDOW IN BALCONY BEHIND LAMELLAS IN FACADE VIEW.
F7Bah1
CONCRETE IN FACADE
1:50
Private terrace 1.18.03
3.520 3.520
40
40 R1l H
9
7
8
PLAN 1:50
PLAN 1:50
TR450
33.600
40 40
2.610 R1
950
9
Nummer_Rev.:
A-42.4-1423_B
R1l
Private terrace 1.18.03
3.520 R1l
R1
1.975
3.520
8
Private terrace 1.17.03
G
920
7
TR600
920
40 40 R1l
40
3.520
I
40 625 R1
34.200
30.500
40
40 R1l
R1 40 40 625
3.520
40
40
40
40
29.250
27.400 40
40
28.050 3.520 R1l
R1l
R1l R1
1.975 R1
1.975
3.520
R1l
R1l
TR1250
40
40
F
1.975 R1
ISOMETRIC VIEW
40
G
920
TR650
TR1250
625 920
3.520
40
R1 40 40 625
40
40
Private terrace 1.19.02
ISOMETRIC VIEW
H
R1
ISOMETRIC VIEW
40
40 40
Private terrace 1.17.03
30.500
34.050 3.520
40
3.520
40
R1l
40 R1l
40
40
40 40 H
9
10
Private terrace 1.19.02 PLAN 1:50 9
10
11
C
C
B A REV
046 PM3 018 010 PM2 009 ID PM
1.285
R1
R1
1.306
ST220-04
29-01-2016
1
2
3
4
5
38.850
6
7
8
9
DATE
40
40
40
N
186 R1
D
40 R1l 660
785 R1l 40
R1l
1.054
1.806
40
3.520
D
R1l
40
R2l
935
40
R1l 1.800
40
3.520
40
40
40
R1l
40
18-02-2016
INIT
ST220-03
R1
R1
2.199
992
38.250
JBA JBA
1.100
1.079
#ID
36.430
Gate removed Railing changed / added. Planterbox added. Railing changed. Planterbox removed. DESCRIPTION
BYGGHANDLING
36.430 2.200
79&Park Sandhamnsgatan 79, Stockholm
3.520
3.520
3.520
R1l
R1l
1.975
Linnégatan 2, 102 43, Stockholm
B 046
A1 - BJARKE INGELS GROUP (Fasad) - TEL: +45 72 21 72 27
920
TR450
A2 - PROJIT AB (Invändig BH Projektering) - TEL: +46 6 412 26 50
VVS - METATOR - TEL: +46 8 642 77 50 EL - PROJEKTEL - TEL:: +46 8 562 856 00
40
40
40
40
ISOMETRIC VIEW
AKUSTIK - ACAD - TEL: +46 8 556 211 40
40
LANDSKAP - AJ LANDSKAP - TEL: +46 8 509 085 15
E
Private terrace 1.19.01 Private terrace 1.19.03
3.520 R1l
E
Private terrace 1.19.03
BRAND - DE BRAND - TEL: +46 733 25 80 25
38.700 3.520 R1l
40
R2l 625
38.850 3.520 R1l
40
R1l
40
40
3.520 40
K - KONKRET - TEL: +46 8 402 38 80
38.250
37.650 40
10
11
Datum:
Projekt nummer:
18.12.2015
(BIG) 11033
Ritat:
Granskad:
Godkänd:
Høgni Laksafoss
Tobias Hjortdal
Per Bo Madsen
Ritning:
ISOMETRIC VIEW Private terrace 1.19.01
Roofterrace overview_Private
PLAN 1:50 PLAN 1:50
Helskala, A1:
1:60, 1:50
Nummer_Rev.:
A-42.4-1423_B
METZLER TOWER
Shifting Terraces 56
65.000 M2 m2_ COMPETITION Frankfurt is a unique urban setting that combines the classical European perimeter block city with high-rises forming a vibrant cluster in the city centre. We propose a tower that is derived from a careful study of the site and program, and as a result creates a strong presence both on street level and in the skyline. The program is a unique mix of two types of offices, residential, and public program. Each part of the height of the tower has its own constraints and potentials. The tower reacts to the constraints and potential of each specific height and program, creating a silhouette that is both rational and sculptural. The tower is articulated as a slender and rational stack of inhabited floors, interrupted by two sculptural moves where the program changes. At street level, the floors are shifted back and forth to create inhabitable terraces and canopies facing the park. In the middle of the silhouette where the program changes to residential, the floor plates slide out in a spiralling movement creating terraces and views up and down the streets for the residents. In the upper part the tower returns to the simple stack of floor plates epitomized for offices.
LOMA SOMERA 350m2_ COMMISSION How can we renovate a 200 year old house without compromising the users comfort? In the structure of the house was easy to read three different parts, corresponding to 3 extensions that occurred in different times of the house history. What we found when we come into the house for the first time, was a collection of spaces disconnected to each other and laying in many different levels. So the main focus of the project was giving a continuity creating several architectural promenades that link to all the spaces of the house.
PERSONAL
RINGEN 289.5m2_ COMPETITION ARKITEKTFORENING Ringen is a wooden pavilion located in the middle of Kongens Have. It creates a unique environment for the users during the summer time in Copenhagen and a natural meeting point within the parkland. The organic profile of the pavilion offers a bench area, accessible from both sides, and a large space to lay and relax. The rotation of the ring is strategically placed towards the castle and the lower part towards the sun. Ringen contains 2880 pieces of pinewood, which forms 720 frames. In total, Ringen uses 3189m of 48x48mm elements and 285.2m of 36x68mm elements. The different profiles and an angle of 0,5 degrees between frames give shape to the circle. The inner circle has a radius of 9.6m while the outer circle shape is modelled according to the movement of the wooden elements. The top pieces, which create the top surface, are all 1600mm long. The other pieces are unique and interconnected sections following the curve.
PERSONAL
Contributions: Facade desing studies, coordination meeting with suppliers and details
Recommendation letter
and drawing production during the detail design fase, concluding with the construcction of the project. Collaborators: OBF Rådgivende Ingeniører
Date: 30 October 2019
West Don Lands Site Plan Application and Permit drawing set
To whom it may concern,
Housing + Retail
Teresa Fernández Rojo has been employed as an Architect at COBE A/S from 1 December 2016
Size: 60000 m2
to 31 October 2019.
Client: WDL 8 GP inc. Contributions: Facade desing studies, coordination meeting with client and detail and
Teresa has been a steady workforce during her stay at COBE, and she been involved in a wide
drawing production for the permit drawing set.
range of projects, spanning from architectural design, and competitions to detailed design.
Collaborators: Architects Alliance, Claude Cormier+ Associés inc., Thornton Tomasetti, M.V.Shore Associates, Cole Engineering Group Ltd., Terraprobe, Desifn Agency, RWDI,
Teresa has been engaged in the following projects, adding great value to the overall results of the
WSP, Jensen Hughes
different projects, with specific responsibilities on more of them: Christiansholm Skitseforslag, Dispositionforslag
Climate House, Oslo, Norway
Mix used
Competition for a museum
Size: 45000 m2 + 25000 me basement
Size: 700 m2
Client: Danica Properties
Client: Naturhistorisk museum, Oslo
Contributions: Design studies, façade coordination, and material production for
Contributions: Project leader, concept development, and competition material
Skitseforslag and Dispositionforslag.
production.
Collaborators: MOE A/S Rådgivende Ingeniører, Inside Outside landscape
Collaborators: Kossmann. Dejong, exhibition architects, BUROHAPPOLD ENGINEERING. During her time at COBE, Teresa has shown great qualities as an architect on several levels,
Scrivener, Toronto. Canada
spanning from idea and concept phases towards design development, but has over the years also
Schematic Design
developed into a detailed design architect, always taking responsibility of her work and deadlines.
Housing Size: 30 000 m2
Teresa has a good sense of design, composition, and a systematic approach to studies and
Client: Diamond corp and TRICON development group
problem solving.
Contributions: Desing studies, coordination meeting with the client and collaborators and drawing production during the schematic design phase concluding with the
As an employee at COBE, Teresa has been appreciated by all co-workers, from the management
submision for the City of Toronto design Review Panel.
team to architects and interns, adding great value and atmosphere to the office spirit, also as
Collaborators: Graziani + Corazza architects inc. , ERA, J.D.BARNES, COLE
head of COBE Social.
ENGINEERING, Claude Cormier+ Associés Landscape Architecture and Urban Desing, I can warmly recommend Teresa Fernández Rojo as a thoughtful and inspiring architect, and
BA Group, Urban strategies inc.
wish her all the best in her future career as an architect.
RJV_ Social Housing, Ørestad
Please do not hesitate to contact me if you need further information.
Schematic design and Detail design Housing Size: 7500 m2
Eik Bjerregaard
Client: AP pension
Project Director eik@cobe.dk
1
2
BIG 03. October 2016 To whom it may concern, I am pleased to offer my recommendation for Ms. Maria Teresa Fernandez Rojo. Teresa has worked at Bjarke Ingels Group (BIG) since April 2013 as an architect, and I have had the oppor‐ tunity to get to know Teresa in my capacity as the partner‐in‐charge of a project for a mixed‐ used tower in Singapore that is currently in the detailed design phases. Teresa has also collabo‐ rated within the office on numerous other ongoing projects representing a spectrum of typolo‐ gies and in various phases of design such as a mixed‐use tower for Frankfurt, the Blåvand Bun‐ ker Museum in Western Denmark, Maison de l'Economie Créative en Aquitaine se dévoile (MÉCA) in Bordeaux, and Stettin 7 residential development in Stockholm. Teresa has a well‐rounded set of skills (from 3D modeling, drawing, and visual representation), as well as a professional attitude and focus on the tasks at hand, frequently under heavy time pressure. Her positive can‐do attitude and sense of responsibility makes her a true pleasure to work with, and allows her to quickly become an essential player within the team. In addition, Teresa’s ability to work independently and strong problem solving skills has allowed her to be successfully involved in multiple project phases and especially in conceptualizing and imple‐ menting design intent sketches into detailed design drawings. I have no doubt that she will make a valuable contribution to any team or studio in which she chooses to advance her career. The following is a select list of key projects in which Teresa has assisted: SING Singapore Mixed Use Tower (Confidential Client) 2015 – present : 105,000 m2 : Singapore, Singapore Teresa worked on this project from concept through schematic design and was responsible for multiple major building parts and their development from initial design ideas through to im‐ plementation and communication with the internationally‐based client and consultant team. Teresa effectively put extensive and exhaustive effort into developing multiple solutions to a high level of resolution, within a tight frame. METZ Omniturm Tower (Confidential Client) 2015 – present (construction): 65,000 m2: Frankfurt, Germany She worked in this project during schematic design, being in charge of the residential section of the building, coordinating the efficiency and design of the apartments layout with the facade and structure solutions. MCB Museum Center Blåvand 2012 – present (construction): 120,000 m2: Billund, Denmark She was the architect in control of the drawing set and I produced almost all final drawings for the DD. She was also full integrated in design solutions starting from optimization of plans to contributing to design of the individual details. MECA Bordeaux Métropole Aménagement 2012 ‐ Present (construction): 12,350 m2: Bordeaux, France Teresa started in this project working as an design assistant, becoming architect after few months. She worked during the APD, APS, and APD phases.
I can only imagine that Teresa will continue to excel in every way possible. I have every confi‐ dence in her future, and I would like to give Teresa my highest recommendation. Please do not hesitate to contact me if you have any additional questions. Best Regards,
Brian Yang Partner, BIG M +45 25 10 44 79 brian@big.dk
BJARKE INGELS GROUP KLØVERBLADGADE 56 2500 VALBY DENMARK T +45 7221 7227 F +45 3512 7227 WWW.BIG.DK
11-10-2011 / Page 1 of 1 / Copenhagen
ADEPT
Recommendation: Teresa Fernández Rojo Teresa Fernández Rojo was an intern at ADEPT from 1.02.2011-1.6.2011. It has been a pleasure to have Teresa Fernández Rojo as an employee in our office. From the very beginning the collaboration was very engaged and professional. During the period of working at ADEPT, Teresa Fernández Rojo evolved to become a valuable employee. At the office Teresa Fernández Rojoworked on the following projects: Masterplan, Fredericia,Denmark Masterplan, Asker, Norway Elderly houses, Copenhagen, Denmark Teresa Fernández Rojo worked in various scales involving both architecture and urban planning. By being involved in different types, scales and phases of projects, Teresa Fernández Rojo developed a wide series of architectural tools. At ADEPT, Teresa Fernández Rojo was always part of a project team, and was from the very beginning a very openminded and positive person. She combines a good mood with a professional approach and due to that it was always a pleasure to have Teresa Fernández Rojo at our office. We wish Teresa Fernández Rojo all the best for the future, and we truly recommend her to any other architectural office. Feel free to contact me for further information. Sincerely
Anders Lonka Architect and founding Partner alo@adeptarchitects.com +45 30296049 ADEPT 1. ADEPT - [’adept] sb. Master (at, in) adj. skilled, competent. 2. ADEPT - architecturedepartment (a-dept). ADEPT’s approach is to develop very contextual projects which add value to its urban environments without compromising the specific brief. Experience has shown that this approach does not only promote better cities and urban spaces, it also creates a synergy in relation to economically, socially and ecologically sustainable developments. ADEPT is based in Copenhagen, Denmark and works within the fields of architecture, urban planning and landscape design. ADEPT is founded and lead by architects: Anders Lonka, Martin Laursen and Martin Krogh. The office only takes part in deliberately selected projects. Therefore it is able to achieve a high level of quality in each single contracted job. The Company has within the latest year won numerous international competitions.
M. Teresa Fernรกndez Rojo teresafrojo@gmail.com +34 618820496 +45 31372555