PORTFOLIO INTERIOR
DESIGN
FALL 2020
01 SANDRISE Senior Project Introduction 02 Site Plan 03 Concept 04-05 Mood Board 06 Design Statement 07-09 First Design Approach 10-11 Technical Information 12-23 Renders 24-48
02 JOHN FLUEVOG Commercial Design Concept 50 Site Plan 51 Design statement 52-53 Mood Board 54-55 First Design Approach 56-57 Technical Information 58-59 Renders 60-73
03 KIKA MARKETING Corporate Design Concept 74 Site Plan 75 Design statement 76-77 Mood Board 78-79 First Design Approach 80-81 Technical Information 82-83 Renders 84-93
LUISA
MEJIA
04
INVENERGY Corporate Design Concept 94 Site Plan 95 Design statement 96-97 Mood Board 98-99 First Design Approach 100 Technical Information 101-108 Renders 109-111 Real Pictures 112-115
05
FRITS DE VRIES Corporate Design Concept 116 Site Plan 117 Design statement 118-119 Mood Board 120 First Design Approach 122 Technical Information 123-124 Renders 125-131
06 PINK BUFFALO Construction info. Introduction 132 Technical Information 133-144
TABLE
OF
CONTENTS
02
LUI SA-
“Design is intelligence made visible”
Luisa Fernanda Mejia González I am an passionate architect and interior designer student. This portfolio is a presentation of my design work, I hope you will enjoy it, thank you for your attention. After some experience as an architect I decided to move to Vancouver and follow what I really want to be, an interior designer, with the main purpose of exploring, understand and be involved in the industry in Vancouver.
01
SENIOR
0
PROJECT
INTRODUCTION
SANDRISE Hotel Boutique
This project is a private luxury boutique hotel located in Osoyoos Desert, British Columbia. the concept design stands up Its landscape, diversity in fauna and flora. The boutique is designed to frame its natural environment, the garden as the protagonist and heart of the hotel let the guests have a connection with the exterior nature from inside, also through the open spaces and the natural lighting coming into the interior. the total area is 19.000 sq ft with exclusive areas for the guests as outdoor infinity swimming pool, a bar- Restaurant, and a wide spa with the wet area as hot tub, an indoor swimming pool, and sauna, making them feel like they are at home, instilling a sense of peace and belonging in the midst of some of the most diverse natural and historical landscapes of canadá.
02
01
SENIOR
PROJECT
LOCATION
SANDRISE BOUTIQUE HOTEL
OSOYOOS, BC 1200 Rancher Creek Rd, Osoyoos, BC V0H 1V6
03
SENIOR
0
PROJECT
SANDRISE Hotel Boutique
OCHER OCHER “Is the term for both a golden-yel-
CONCEPT
low or light yellow-brown color and for a form of earth pigment which produces the color” Is among the earliest pigment used by mankind, derived from naturally tinted clay containing mineral oxides The color reminds the human mind to be involve in the natural elements, which have been adapted according to their
00
needs, creating different experiences.
04
01
SENIOR
PROJECT
ARCHITECTURAL COLLAGE
05
SENIOR
PROJECT
02
01
04
03
05
06
The Botanic Garden as the heart of the design
Common
Area
surronding
the Botanic Garden.
Hybrid
spaces
inviting
a
visual connection with the heart and its environment.
Passageways delivering toward the private spaces
Private spaces as the left arm to the botanic garden.
07
SENIO
PROJECT
DESIGN PRINCIPLES
NATURE
WELLNESS
DEMOGRAPHICS
COUPLES
SINGLE PERSON
08
JOY
BREATH
IDENTITY ORGANIC
PRODUCTS
BOTANIC GARDEN
SPA
SHOP
The products are ex-
The products are part
The
tracted from the plants
of the treatment
marketed
09
products
are
SENIOR
PROJECT
PROGRAMMING Main Floor
10
SENIOR
PROJECT
PROGRAMMING Upper Floor
11
FLOOR MAIN
FLOOR PLAN 01 Front Desk
06 Guest Elevator
11 Storage
02 Lobby
07 Botanic Garden
12 Reception Spa
03 Waiting Area
08 Public Washrooms
13 Treatment Room
04 Stairs
09 Service Elevator
14 Washroom
05 Fire Scape Stairs
10 Shop
15 Saunas
12
16 Host Desk
2 1 Desert Lounge
26 Manager Office
17 Bar Counter
2 2 Swimming Pool
27 Admin. Office
18 Dining Area
2 3 Washrooms
28 Finance Office
19 Kitchen
2 4 Unisex W.C
29 Lounge
20 Pick Up Area
2 5 Staff Washroom
13
UPPER
FLOOR
FLOOR PLAN 0 1 Stairs
05 Service Elevator
08 Deluxe Room
0 2 Guest Elevator
06 Fireplace / waiting area
09 Junior Deluxe Room
0 3 Fire Scape Stairs
07 Executive Room
10 Standard Room
0 4 Storage
14
SENIOR
PROJECT
SECTION A-A’
SECTION B-B’
15
Axonometric view 01
01 03
02 02
03 05 04
09
08
10 15
16
12
Deluxe Room
03
Junior Deluxe Room
04
Standard Room
05
Fireplace
01
07 01
11
13
02
MAIN FLO O R
03
14
UPPER FLO O R 01 Executive Room
Reception
02 Lobby 03
06
04
05
02
Botanic Garden
04 Waiting Area 05 Shop
16
06
Washrooms
07
Kitchen
08
Dining Restaurant
09
Washrooms
10
Bar
11
Swimming Pool
12
stairs
13
Spa Reception
14
Spa
15
Sauna
16
Offices
SENIOR
PROJECT
UPPER FLOOR
MAIN FLOOR
17
PROJECT SENIOR
EXECUTIVE ROOM
01 07 05 08
10
04 06
02
03 11 09
0 1 Entrance
05 Kitchen
09 Balcony
0 2 Living Room
06 Studio
10 Bathroom
0 3 TV Stand
07 King Bed
11 Closet
0 4 Dining Table
08 Bench
TOTAL AREA: 926.40 sq ft QNT: 2
18
PROJECT SENIOR
DELUXE ROOM A 06 05 12
08 04
01
07
09
10
11
02
03
0 1 Entrance
05 Kitchen
09 King Bed
0 2 Living Room
06 Bar
10 TV Stand
0 3 Console table
07 Studio
11 Balcony
0 4 Dining Table
08 Closet
12 Bathroom
TOTAL AREA: 785.70 sq ft QNT: 1
19
PROJECT SENIOR
DELUXE ROOM B 01 02 12
11
03 04 06
08 10
05 09
07
0 1 Entrance
05 Bench
09 Bench / Storage
0 2 kitchen
06 Living Room
10 Studio / TV Stand
0 3 Large Mirror
07 Bay Window Seating
11 Closet
0 4 TV Stand
08 King Bed
12 Bathroom TOTAL AREA: 756.90 sq ft QNT: 1
20
PROJECT SENIOR
JUNIOR DELUXE A 04
05 07
02
03 01
06
0 1 Entrance
05 TV Stand
0 2 BAR
06 Closet
0 3 King Bed
07 Bathroom
0 4 Balcony TOTAL AREA: 520.50 sq ft QNT: 1
21
PROJECT SENIOR
JUNIOR DELUXE B 09 06
06
10
08
07 01 05
04
03
02
0 1 Entrance
05 Studio / TV Stand
0 2 Closet
06 Double Bed (2)
0 3 Bar
07 Balcony
0 4 Bench / Mirror
08 Bathroom
TOTAL AREA: 550.40 sq ft QNT: 1
22
PROJECT SENIOR
STANDARD ROOM 02 03
04
01
05 08 06
07
0 1 Entrance
05 Bench
0 2 Bar
06 King Bed
0 3 Bench
07 Closet
0 4 TV Stand / Studio
08 Bathroom
TOTAL AREA: 437.16 sq ft QNT: 2
23
SENIOR
PROJECT
EXECUTIVE ROOM
24
25
SENIOR
PROJECT
DELUXE ROOM A
26
27
SENIOR
PROJECT
DELUXE ROOM B
28
29
SENIOR
PROJECT
JUNIOR DELUXE A
30
31
SENIOR
PROJECT
JUNIOR DELUXE B
32
33
SENIOR
PROJECT
STANDARD
34
35
RECEPTION / LOBBY SENIOR PROJECT
36
The reception is the guests first approach to the place, therefore, it reflects well-being, nature and the joy of conceptual design through open spaces where the natural lighting come into the space and the exterior environment is part of the interior.
37
RECEPTION / LOBBY SENIOR PROJECT
38
39
WAITING AREA SENIOR
PROJECT
40
RESTAURANT SENIOR
41
PROJECT
42
SENIOR
PROJECT
T E A SPA
The TEA SPA design goes with the concept of nature into the space, the use of brown and grey tones is related with the earth colors. The spa treatments are base on organic products extracted from the Botanic garden and gotten from the shop. that made it a unique and exclusive place.
43
The lounge area includes a dining area, bar and pool. in summer the glass door is kept open to invite to an open space where all areas are integrated, in winter the restaurant is separated from the pool, however through the glazing the guest has visual contact with the surrounding nature.
LOUNGE AREA SENIOR
PROJECT
44
45
FIREPLACE / UPPER FLOOR SENIOR PROJECT
46
47
SENIOR
PROJECT
ESSENTIAL SHOP
With a contemporary style, the design of the store is inspired by the feeling of freshness, the combination of green tones and organic elements such as wood and plants providing vibrations, calm and neutral climates that allow the guest to spend time feeling comfortable. The skincare products are made from the botanical garden.
48
SENIOR
PROJECT
SITE PLAN
49
COMMERCIAL
PROJECT
SHOES STORE Jhon fluevog
FILMING PRODUCTION a self-described progressive art deco
CONCEPT
inspired brand that has stood out for its unique designs, that are often used by world-renowned artists. A work of art that is undoubtedly the centre of attention of any outfit as if it were the main actor in a movie. This is why these John Fluevog shoes are presented as the star of the Hollywood show of the 50s surrounded by accessories, furniture, lighting and scenography that highlight their main role.
50
0
02
COMMERCIAL
PROJECT
LOCATION
JHON FLUEVOGE
GRANVILLE ISLAND 1680 Johnston St, Vancouver, BC V6H 3S2
51
COMMERCIAL
PROJECT
KEYWORDS
GLAMOUR
FA S H ION
DEMOGRAPHICS TOURIST Age: 22-60 year old Profile: students and employees Career: Designers, artist, Architects, photographers Income: 3.500 CAD -7.000 CAD Monthly Socio-economic status: Medium
52
unconv e ntiona l
wom en
FAMILY Age: Parents (27-45 years old) Children (3-12 years old) Profile: Young couple living in Vancouver Career: Any one Income: 2.500 CAD -7.000 CAD Monthly
53
COMMERCIAL
PROJECT
MOOD BOARD The materials evoke the golden age of Hollywood where the colors and vintage-referenced furniture stand out to represent the glamour of the time. All the decorative elements, display walls, tables and lighting seek to transport the clients to that time, surrounding them with posters and scenography that provide an experience that will make them feel like a star on the set of a great movie.
54
COMMERCIAL
PROYECT
07
06
09
08
10
55
COMMERCIAL
PROJECT
COLLAGES Jhon fluevog
The collage intention is showing the woman as the protagonist, the designs of john fluevog are focused in making the client feel like a rockstar and like a queen as he said, so it is important to highlight her powerful and the fashion look at the same time being combined with the vintage look. The swimmers show her freedom and revolutionary feeling as the brand
56
PROPOSAL Will coincide with the open thinking that evokes the brand and the client. the focus will provide an inspirational environment which reflects fashion design trends or bucked them, a space with character and authenticity where the Fluevoggers dare to be themselves without prototypes. The new store will be oriented just for women, to make them feel comfortable and unique like the brand, this will be an unconventional propose which let the client create experiences better than just get a product.
57
FLOOR PLAN COMMERCIAL
PROJECT
-
STORE
58
3
3
3 3
3
3
3
3 1
1
2
3
3
HEIGHTS: 1. Cove ceiling & Lighting: 12’ AFF 2. Drywall Dropped Ceiling: 10’6” AFF 3. Drywall Dropped Ceiling + T-Bar ceiling: 8’6” AFF
CEILING PLAN COMMERCIAL
59
PROJECT
-
STORE
60
The washroom purpose is to stand out the vintage look blended with a modern air through the use of rustic materials as the wood, mosaic tiles with grey tones and some touches of gold finishes which remind elegance.
61
PROJECT
WATER CLOSET
COMMERCIAL
COMMERCIAL
PROJECT
JOHN FLUEVOG STORE
62
63
COMMERCIAL
PROJECT
JOHN FLUEVOG STORE
64
65
RECEPTION / FITTING AREA
COMMERCIAL
66
PROJECT
67
FITTING AREA / DISPLAY WALL
The display wall is inspired by the movie posters typical in a theatre, also the accent lighting brings out the filming production concept with a vintage look through the materials with bright tones and mosaic textures. which goes with the glamour feeling.
68
69
COMMERCIAL
PROJECT
C.O OFFICE
70
71
COMMERCIAL
PROJECT
BREAK ROOM
72
73
CORPORATE
0
PROJECT
OFFICES Kika Marketing
YOUNG SPIRIT kika marketing brings together the perfect combination of
CONCEPT
marketing expertise, creative talent, and technical prowess to turn visionary ideas into extraordinary brand experiences that drive business beyond the competition. The office design reflects the open
and
creative
thinking
through bright colours and the industrial look, with the purpose
11
to provide a happy and positive environment. Also, some spaces configuration and contact with nature make the employees feel as at home and comfortable appropriate to create new ideas.
74
03
CORPORATE
PROJECT
LOCATION
KIKA MARKETING
COAL HARBOURD 100-535 Thurlow St #1255, Vancouver, BC
75
CORPORATE
PROJECT
CULTURE
FUN
TEAM WORK
SUPPORTIVE
DEMOGRAPHICS
4 Back and developer
1 Account marketing manager
4 Front-end-developer
1 Sr. Developer
7 Graphic designers
1 Controller
2 Quiality assurance
1 Accounting clerk 1 Receptionist
76
INTEGRITY
ADAPTABLE
1 Present & Founder
DIVERSITY
Client
77
CORPORATE
PROJECT
MOOD BOARD Wood and plants make the space balanced, calm and comfortable, a perfect complement to the bright colour scheme. The carpet provides a psychological feeling of heat and is good at absorbing noise. White brick gives a rustic look to the space with a mix of sober and elegance
78
CORPORATE
PROJECT
13
14
17
18
12
15
16
79
PROPOSAL The office will count with private offices and open workspace to contribute to the interaction between employees while they are creating ideas. the cafeteria and break room are social spaces which can be used for informal meetings as collaborative likewise the seating area located on the back of the open offices. the materials bring a contemporary and youth look through and industrial style.
80
CORPORATE
PROJECT
PROGRAMMING Kika Marketing
81
WORK SPACE
LOCKERS
82
PRIVATE OFFICES
BREAK ROOM
QUIET SPACE
W.C
WAITING AREA
RECEPTION
MEETING ROOM
C.O OFFICE
FLOOR PLAN COPORATE
83
PROJECT
-
Offices
CORPORATE
PROJECT
RECEPTION
84
85
This space evoke the creative thinking and make emphasis in the young feeling of the company, the implementation of swing chairs, plants, decorative rugs and some phone booths help to reflect the character and authenticity of the brand, and provide spaces for the employees where besides to take a break, inspire them and let them create new ideas.
86
COPORATE
PROJECT
MEETING ROOM
The meeting room has neutral tones and materials due the activities are developed usually within this kind of spaces, the finishes evoke the elegance and professionalism of business, also let avoid distractions and keep focus in the meeting subject to the guest or the person in charge.
87
WORK SPACE / OPEN OFFICES
CORPORATE
88
PROJECT
89
CORPORATE
PROJECT
PRIVATE OFFICES
90
The private spaces use materials like brick, wood and black colour framing partitions which goes with the industrial look. the bright colour as blue and green tones of the upholstery make the space fun, welcoming and creative.
91
CORPORATE
PROJECT
BREAK ROOM
92
93
CORPORATE
PROJECT
OFFICES Invenergy
0 DYNAMICS OF MOVEMENT This is a project for invenergy company, which is leading pri-
CONCEPT
vately held, a global developer and operator of sustainable energy solutions. the design concept is inspired by the methods that the brand used to produce energy, the dynamics meaning are how the body is moving and this relates to speed, energy and flow of movement. the central passageway delivers different spaces each with
19
a unique look, but thinking with the same direction, the essence of materials and colour scheme, remind the production environments and the compa-
94
04
CORPORATE
PROJECT
LOCATION
INVENERGY
BIO 26 BUILDING Cl. 26 #38 - 26, Medellín, Antioquia, Colombia
95
CORPORATE
PROJECT
DESIGN PRINCIPLES
FLEXIBILITY
IDENTITY
DEMOGRAPHICS
WORKSTATION:
PRIVATE OFFICES
18 EMPLOYEES
2 SUPERVISORS
96
PRIVACY
DIVERSITY
PRIVATE OFFICE
CLIENT
1 C.O OFFICE
97
CORPORATE
PROJECT
MOOD BOARD The materials proposal was based on the colour scheme brand, the blue, green and yellow represent the natural resources they use to produce energy, which is also the reason of the wood and concrete selection to complement the different tones also to generate welcoming spaces appropriate to work.
98
CORPORATE
PROJECT
21
20
22
23
24
25
26
99
PROPOSAL The project was designed from some marketing statements already developed by the company, the challenge was to create a new space with a contemporary style but at the same time related to the brand standards. The use of bright colours remember the employees and the guest the brand and brings youth and innovative look to space, some materials as the green metallic panel or the concrete accent walls stand out the industrial environment of the productions places where the energy is made.
100
TOTAL AREA 2.137.20 SQ FT
Reception
Landing
Workstation
I.T Room
Lunch room
Small meeting rom
Lockers
Individual space
Storage
Printing
Private offices
Vanity table
101
0 1 Reception
05 Meeting room
09 Lunchroom
0 2 Lockers
06 Workstation
10 Utilities room
0 3 Printing
07 Meeting room
11
0 4 Landing
08 Private offices
12 Vanity table
Storage
FLOOR PLAN CORPORATE
PROJECT
-
OFFICE
102
13 IT. Room
Carpet
Vinyl
Vinyl
Carpet
Vinyl
FINISHES PLAN CORPORATE
103
PROJECT
-
OFFICE
LUNCH ROO M
M E E T ING R O O M
W O R K STAT IO N
ELEVATIONS COPORATE
PROJECT
-
OFFICES
104
MEET I N G
LANDI NG
RO OM
M E E T ING R O O M
RECEP TI ON
105
ELEVATIONS COPORATE
PROJECT
-
OFFICES
106
CORPORATE
PROJECT
LUNCH ROOM It is a flexible space, besides to met the kitchen activities, the long table can be used as a temporary workstation, the match of wood, green and a patterned wall give the ambience diversity and youth look.
SMALL MEETING ROOM The small size of this room let the employees have privacy in an informal meeting while the main meeting room is busy. the carpet helps to insolate the noisy that come from the exterior, the blue gives elegance.
PRIVATE OFFICE the private offices use neutral tones and textures with the purpose to keep balance and simplicity, the flooring carpet keep the insolation from the exterior,
107
CORPORATE
PROJECT
MAIN MEETING ROOM The vivid tone of the walls and chairs encourage the creativity and open thinking needed in this space where all the ideas are born, the new relationship developed as team members come together.
INDIVIDUAL SPACE This space is located at the end of the passageway, between the private offices and the cafeteria, it is thought to give an alternative to the guest, after a meeting, to spent a while alone whether to reply a phone call or just to use the laptop.
VANITY It is a useful and small corner with the purpose to give the employees and space where they can be themselves
108
COPORATE
PROJECT
RECEPTION
109
COPORATE
PROJECT
LANDING
The industrial look is related to the functions of the company, the metal sheet represents the energy storage the use, likewise, the exposed ceiling contribute with this look. the grey upholstery and wood flooring make the space cosy and welcoming,
110
COPORATE
PROJECT
WORKSTATION
111
COPORATE
PROJECT
RECEPTION
112
COPORATE
PROJECT
LANDING
113
COPORATE
PROJECT
PASSAGEWAY
114
COPORATE
PROJECT
OFFICES
115
CORPORATE
0
PROJECT
OFFICES Frits de vries
HEMISPHERE As one of two balanced sides equally important, but not the
CONCEPT
same and with different functions. The left brain is divided into two hemispheres, the left side is responsible for all task that has to do with logic and the right hemisphere with all activities that have to do with creativity. Both hemispheres are connected to perform a complete and a better function. Our project is based on this concept, where logic and creativity come together to obtain
27
a greater result. Each area has it own individual functions for employees and customers, so they can create new ideas, investigate and analyse to reach every project goal.
116
05
CORPORATE
PROJECT
LOCATION
FRITS DE VRIES OFFICE
FRITS DE VRIES ARCHITECT LTD. 1834 West 1st Avenue, Vancouver, BC
117
CORPORATE
PROJECT
CREATIVE hemisphere ACTIVITIES
REST
/
SPACES
COLLABORATIVE
THINK
LOGIC hemisphere ACTIVITIES
TECHNICAL VALIDATION
/
SPACES
PROFITABILITY
118
RESEARCH
COFFEE STATION
MEETING ROOM
WORKSTATION
PRINTING STATION
C.O OFFICE
LIBRARY STAIRS
119
CORPORATE
PROJECT
29
28
30
31
32
120
33
PROPOSAL Office for 9 people with a waiting area that receives the guests, it is separated by furniture, which has two sides, one of them is the printing area that is a complement to the open office. Besides the circulation is established for a long bench that finishes off in a small coffee. Behind the staircase are the bathroom, which is closed of the meeting room or thinking table, this open space connects the open office with the main office as a point of intersection, and the main office which also has a sofa for the guests.
121
FLOOR PLAN CORPORATE
PROJECT
-
OFFICE
122
C.O Office
Waiting Area Meeting Room Workstation
Lockers Staircase Printing
Washroom
Coffee Station
RENDERED PLAN CORPORATE
123
PROJECT
-
OFFICE
CORPORATE
PROJECT
WORKSTATION
124
125
CORPORATE
PROJECT
BENCH / STAIRS
126
127
CORPORATE
PROJECT
PASSAGEWAY
128
129
CORPORATE
PROJECT
MEETING ROOM
130
The blue and grey tones give the space a fresh and clean feeling, which is balanced with the warm tone of the wood and the brick texture. also the lighting with black aluminium contrast with the white ceiling that makes the space look wider.
131
CONSTRUCTION
06
DOCUMENTS
OFFICES Pink Buffalo films N SITE
PINK BUFFALO FILMS The purpose was about renovation of this existing office and 1
ID0.00
SITE PLAN
turn it into a modern and corpo-
SCALE: N.A
rative space, alway meeting the company standards and client needs. The information made for this project needed to be as detailded as possible to be constructed
132
6
N 03
N
10'
HAS
02
01
GS
TIN
10'
03
01
EET
STR 1
ID0.01
DEMOLITION PLAN SCALE: 1/4" = 1'- 0"
LEGEND GENERAL EXISTING EXTERIOR, CORE WALLS AND PARTITION TO REMAIN NEW PARTITIONS AREA OUT OF CONTRACT
KEY NOTES 01
EXISTING DOORS TO BE REMOVED AND SAVED FOR REUSE
02
EXISTING MILLWORK TO BE REMOVED
03
DEMOLISH PORTION OF EXISTING WALL
LEGEND DEMOLITION PLAN TO BE REMOVED
133
N 6"
07
KITCHEN COUNTER
ID0.09
3'-2"
E5 ID0.04
4"
7'-6"
3'-2"
8'-8"
D4
2" 14'-
6'
RECEPTION DESK
1'-5"
18'-8"
3'-2"
5"
E13 ID0.06
1
3
3
TIN
D2 LINTEL
D3
4"
EET
STR
E12 ID0.06
4"
4'-10"
4"
15'-
11
GS
13'-3"
1
OFFICE 2 406
'-2"
4
E16 ID0.06
BOARD ROOM 408
1" 3'-12
HAS
OPEN OFFICE 407
D1
E15 ID0.06
7'-5"
E14 ID0.06
PRINT TABLE
D4
0"
9'-
4'
E10 ID0.05
OFFICE 1 405
1 10'-
D3
2'
1
E11 ID0.05
4"
E2 ID0.04
3
1'-11"
1
2'
2
2
ID0.02
E1 ID0.04
5'-6"
11'
1
D4 E9 ID0.05
BENCH
E4 ID0.04
4"
D3 E7 ID0.05
5'-11"
BREAK ROOM 404
6"
STORAGE
RECEPTION 401
11'-5"
E8 ID0.05
"
E6 ID0.05
18'-6"
E3 ID0.04
MEETING ROOM 402
10'
C.O OFFICE 403
4"
3 12'-4"
12'-10"
11'-2"
3
4'-6
4"
3
4"
6"
15'-
4" 10'
CONSTRUCTION PLAN SCALE: 1/4" = 1'- 0"
ADITIONAL NOTES 1.
NEW OFFICE FRONT GLAZING PARTITION TO RECEIVE GLAZING FILM TO MATCH EXISTING
2.
NEW OFFICE DOORS AND FRAMS TO MATCH EXISTING
3.
ALIGN NEW PARTITION AND BUILT-IN MILLWORK TO ADJACENT EXISTING FACE OF PARTITION / COLUMN AS NOTED
GENERAL LEGEND EXISTING EXTERIOR, CORE WALLS AND PARTITION TO REMAIN
NEW PARTITIONS
EXISTING PARTITION TO REMAIN NEW MILLWORK, REFERS TO ELEVATION & MILLWORK SECTIONS NEW GLAZING PARTITIONS
PARTITIONS LEGEND 1
2
NEW GLAZED PARTITION TO 9'-0" AFF . 12 MM TEMPERED GLASS SET IN CLEAR ALUMINUM U CHANNELS FLOOR AND RECESSED HEADER MOUNTED.
NEW INTERIOR PARTITION TO U/S OF SLAB (MATCH EXISTING WALLS) 1 2" Gypsum wall board (drywall) both sides 2X4 @16" O.C
3
4
AREA OUT OF CONTRACT
INTERIOR WALL WITH INSOLATION 1 2" Gypsum wall board/ drywall both sides 2x4 @16" O.C with R14 batt insulation
PLUMBING WALL 1 2" moisturemold resistance (green board) or purple high-performance drywall or Denshield tile backer board on the west side / area 2x6 @ 16' O.C 1 2" Drywall (check room function)
134
ROOM NAME XXX XX ID0.XX
ROOM NAME
ELEVATION SYMBOL
ALIGN SYMBOL
DX
NEW DOOR, REFERS TO DOOR NUMBER AND HARDWARE SCHEDULE
N R2
3'-6"
3'
3'
4'
6'
C1 84" AFF
2'
P1
6'
M1
M1
L2 84" AFF
L2 84" AFF L2 84" AFF
2' 2' 2' RECEPTION 401 C-01
P1
1' 6'
2'
2'
4' 6'
M1
2'
P1
4'
6'
GWB @ 11'-6" AFF
6'
M1
4'-8"
M1
M1
C-03
5'
$
4'
3'
M1
2'
2'
GWB @ 9'- 6" AFF
C-05
GWB @ 9'- 0" AFF
2'-6"
1'-6"
R2
3'
L2 84" AFF
L2 84" AFF L2 84" AFF
3'
R2
2'
C1 84" AFF
"
6'-4"
R2
L2 84" AFF L2 84" AFF
L1 75" AFF
$$
$ R2
2'-7"
BREAK ROOM 404
$$
C-04
C1 84" AFF
C-03
3'-6"
GWB @ 8'- 6" AFF
4
6'-5
R2
$
"
4'-6 '-6"
L2 84" AFF
R2
7'
U1
R2
R2
4'
R2
GWB @ 8'- 6" AFF C-04
C.O OFFICE 403
4" 11'-
" 2'-5
R2
4'
R2
6"
MEETING ROOM 402 R2
R2
R2
3'
2'-6"
$
4' C-03
6'-2"
4'-6
R1
3'-6" R1
3'-3" R1
"
R2
R1
C-04
3'
2'
L1 75" AFF
M1
"
ING
2'-4
$
$ $ R1
R3
2'-6"
"
3'
GWB @ 9'- 0" AFF
R2
1'-6"
R2
C-04
GWB @ 8'- 6" AFF
BOARD ROOM R1 408 R3
C-04
M1
R3
$
L1 75" AFF
M1
4'-6
T HAS
3'
OFFICE 1 405
R2
3'-7"
OPEN OFFICE 407
"
GWB @ 8'- 6" AFF
R3
C-02
6'-4"
4'-6
R2
L1 75" AFF
M1
R2
$$
"
"
4'-6
4'
3'-1
4'
$
$
3'
4'
3'
C1 84" AFF
2'-6
"
R2 R2
3'
3' 5'
OFFICE 2 R2 406
3' R2
$
3'
"
4'-6
ET
TRE
SS
M1 C-04
GWB @ 8'- 6" AFF
R2
1
ID0.03
REFLECTED CEILING PLAN SCALE: 1/4" = 1'- 0"
LIGHTING LEGEND
$
SWITCH LED SURFACE CYLINDER MOUNTED LIGH
M1
RECESSED LIGHTING
R1
ADJUSTABLE RECESSED TRIM
R2
CEILING LEGEND R3
C-01
WOOD SLAT CEILING LINEAR DIMENSION/ SLAT: 2" X 4"
L2
CEILING DROP IN CERTAIN AREA
T-BAR CEILING GRID @ 9'-0" MANUFACTURER: EDGE ACOUSTIC SUPPLY DIMENSIONS: 2' X 4' COLOR: WHITE
EXPOSED CEILING C-03
LINEAR LED LIGHTING
C-04
L1
C-02
RECESSED LINEAR LIGHTING
U1
ROUND ACOUSTIC CEILING PANELS
LINEAR PENDANT LIGHT UNDER CABINET STRIP LIGHT
C-05
GWB @ 9'- 0" AFF
ROUND PENDANT LIGHT
CEILING TYPE / HEIGHT REFERENCE
C1 84" AFF
135
2'
2'
4'-8"
C-03
EXPOSED STRUCTURE
C-01
3'-4" X 6'-10"H SOLID CORE DOOR WITH 2" MDF DOOR FRAME- OFFICE DOOR LOCKSET P-01
CR-1
8'-4"
7'
WC-1
BENCH
6'-10"
D1
STORAGE
3" FLAT STOCK MDF BASEBOARD
1'-2"
2'-6"
M-01
WAITING AREA 1/2" = 1'-0"
2'
2'
E1 ID0.04
C-01 3'
PENDANT .TYP 76" AFF
6'-2"
PINK BUFFALO 1'-6"
RUSTED METAL LOGO
1'-6"
9'
WC-1
RECEPTION DESK
S1
8'-6"
5'
ID0.07
M2
M3
2'-6"
3'-6"
2'
BENCH
M1
E2
RECEPTION 1/2" = 1'-0"
2'
2'
ID0.04
1'-4"
3" FLAT STOCK MDF BASEBOARD
C-01 3'
C-01
WC-1
6'
P-2
1'-6"
7'
PINK BUFFALO
7'
WC-1
76" AFF
8'-6"
RUSTED METAL LOGO
RUSTED METAL LOGO
E3 ID0.04
RECEPTION DESK 3" 3'-88
2 EQUALS
3" 1'-1016
STORAGE
1'
18'-6"
M1
3" FLAT STOCK MDF BASEBOARD
STORAGE RECEPTION
E4 ID0.04
1/2" = 1'-0"
136
SIDE RECEPTION 1/2" = 1'-0"
M2
2'-6"
2'-6"
M2
2 EQUALS
2'-6"
3" 1'-1016
2'-6"
STORAGE 2 EQUALS
2'-6"
S2
ID0.07
3'
3'
FROSTED GLASS PARTITION
S3
WC-3
1'-11"
C-04
C-04
ID0.07
5 EQUAL DOORS
P-3
1'-8"
C.O DESK
4'-6"
3" FLAT STOCK MDF BASEBOARD
ID0.05
1/2" = 1'-0"
1/2" = 1'-0"
2'-6"
C-03 4'-3"
1" 2'-52
2'-5"
C-05
ARTIFICIAL PLANTS 5" 3'-516
5 EQUAL DOOR
2'-8" OPEN
2'-1"
D4
S5
ID0.08
P-4
13" 1'-816
M9
2'
2'-5"
6"
3'-7"
ID0.08
P-1
84" AFF
ROUND PENDANT LIGHT
S4
1'-9"
3'
P-1
1" 1'-98
P-2
C.O OFFICE
E6
MEETING ROOM
2'-4"
3" FLAT STOCK MDF BASEBOARD
E5
M4
2'-4"
3'-4"
WC-2
ID0.04
WRITABLE WALL PAINT
ATTACHED AGAINST WALL
1'-4"
P-3
1'-3"
G-1
M4
G-1
6'-2"
5'-2"
TV 50"
P-2
1'-35 8"
BY OTHERS
BY OTHERS
BACK SPLASH T-2
FRIDGE ADJUSTABLE SHELVE
3'
M9
GLAZING FILM
C.O OFFICE DOOR
E8 ID0.05
BREAK ROOM COUNTER 1/2" = 1'-0"
84" AFF
ROUND PENDANT LIGHT
6"
C-05
1'-9"
2'-6"
2'-6"
1/2" = 1'-0"
P-1
2'-1"
P-1
M9
3" FLAT STOCK MDF BASEBOARD
M9
E9 ID0.05
BREAKROOM 1/2" = 1'-0"
137
1'-8"
T-2 COUNTERTOP
3'
8'-9"
BASE BUILDING GLAZING REFER TO ARCH. DWGS
3"
E7 ID0.05
5'-3"
3 EQUALS
1'-8"
G-1
1" 1'-84
8'-6"
LG
1" 1'-98
3'
P-1
11" 2'-316
3 EQUALS
3'-6"
3 EQUALS
3'-6"
1'
2'-3"
G-1
G-1
GLAZING FILM
1" 1'-84
GLAZING FILM
3 EQUAL
D4
8'-6"
D3
OFFICES GLASS WALL 1/2" = 1'-0"
3'
E10 ID0.05
C-04
S7
2'-1"
C-04
S6
ID0.08
ID0.09
M6
2 EQUAL
WOOD VENEER SURFACE 1'-5"
6'-2"
G-1
STEEL FRAME AND LEGS
P-5
4'-7"
2'-4"
3" FLAT STOCK MDF BASEBOARD
ID0.06
OFFICE 2 1/2" = 1'-0"
2'-6" CR-1
P-2
3'-117 8"
OPEN
2'-1"
OPEN
1'-8"
2'-3"
PLYWOOD UPPERCABINET
S8
ID0.09
4 EQUALS
1'-8"
C-02
WC-6 2'-37 8"
1" 1'-02
M8
DOOR ON TOUCH LATCH
PLYWOOD CREDENZA
9"
WC-6
3'
M8
E13 ID0.06
COPY MILLWORK 1/2" = 1'-0"
138
STEEL FRAME AND LEGS
3" FLAT STOCK MDF BASEBOARD
1/2" = 1'-0"
2'
ID0.05
2'
M6
E12
OFFICE 1
3"
E11
WOOD VENEER SURFACE 3 EQUAL
M5 M5
WC-4
BASE BUILDING GLAZING REFER TO ARCH. DWGS
2'-7"
P-5
M5
1'-6"
P-1
3'
2'-6" P-2
1'-6"
2'-6" 2'-3"
PLYWOOD UPPERCABINET
C-02
1' CR-1 3'-4"
2'-1"
75" AFF
M8
1'-8"
PLYWOOD CREDENZA
2'
P-2
1'-10"
9'
WRITABLE WALL PAINT
FREESTANDING FURNITURE 4'
M8
2'-4"
3'
BENCH/LOW CABINET
M7
OPEN OFFICE
E14
1/2" = 1'-0"
P-1
1'
3'
ID0.06
C-04
3'-4"
WRITABLE WALL PAINT
WC-7
G-1
WC-2
3" FLAT STOCK MDF BASEBOARD
BOARD ROOM
2'-8"
P-2
10
ID0.09
1'-7"
OPEN
E16
T-2
1'-8"
M10
ID0.06
C-04
3 EQUALS
2'-1"
S9
ID0.09
1'-9"
3'
1/2" = 1'-0"
M10
3'
E15 ID0.06
KITCHEN 1/2" = 1'-0"
139
BACK SPLASH
4'-2"
WHITEBOARD
2'-10"
C-01
PENDANT LAMP WC-1
2"
RUSTED METAL LOGO 1'-6"
P-2
PLYWOOD SURFACE / VENEER FINISH
1'
M3 1" 72
2'-5"
1 2" QUARTZ ON ALL SIDES OF PLYWOOD SUBSTRATE
1'-6"
1'-6"
33 4"
M3
1" 1'-102
2'-6"
33 4"
1"
PLYWOOD PANEL W/WOOD VENEER EXPOSED SIDES TYP.
2'-3"
2'-6"
3 4"
3 4" PLYWOOD PANEL W/WOOD VENEER EXPOSED SIDES TYP.
9"
LINE OF GABLE BEYOND
S1 ID0.07
3"
3"
BASE W/PLAM FINISH
RECEPTION SECTION 1/2" = 1'-0"
3'
C-01
C-04
WC-1
2"
1'-11"
P-2
3
RECESSED LIGHTING
1'
M4 1'-6"
1'-8"
RUSTED METAL LOGO
INTEGRATED FINGER PULL 1'-4"
FORMICA PANEL CONCRETE FINISH
PLYWOOD SURFACE
M3
ADJUSTABLE SHELF
3"
BASE W/PLAM FINISH 3"
S2
1" 1'-52
2'-6"
M4
OPEN
3" FLAT STOCK MDF BASEBOARD
ID0.07
1'-6"
4"
SHELFT 1" PLYWOOD W/PLAM FINISH ALL SIDES
1" 32
1'-6"
1" 1'-12
ATTACHED TO THE WALL
PLYWOOD SURFACE / VENEER FINISH
SHELFT 1" PLYWOOD W/PLAM FINISH ALL SIDES
1" 22
2'-6"
TEXTILE ACOUSTIC PANEL
STORAGE SECTION
S3 ID0.07
1/2" = 1'-0"
140
C.O OFFICE SECTION 1/2" = 1'-0"
4'-3"
C-03
4'-3"
C-03
C-05
P-1
C-05
ARTIFICIAL PLANTS
ARTIFICIAL PLANTS
6"
6"
P-1
DOOR 34" PLYWOOD W/PLAM FINISH ALL SIDES
M9
M9 2'-1"
SHELFT 34" PLYWOOD W/PLAM FINISH ALL SIDES
2'-1"
OPEN SHELVES
01 ID0.10
MDF BACKING
4" HEIGHT PULL IN SATIN 1'
1'
BACK SPLASH TILE
BACK SPLASH TILE 02
T-2
2'
ID0.10
1" 12
COUNTER DOUBLE RADIOUS SQUARE EDGE
4" HEIGHT PULL IN SATIN 4" HEIGHT PULL IN SATIN DRAWER BOTTOM MDF W/ MELAMINE FINISHALL EXPOSED SIDES
1" 2'-72
LOWER CABINET + ADJUSTABLE SHELVE
DRAWER FRONT PLYWOOD W/PLAM FINISH ALL SIDES
M9 2'-1"
3 4"
3"
3"
RUBBER BASE
RUBBER BASE
DRAWERS SECTION
S5 ID0.08
1/2" = 1'-0"
SINK SECTION 1/2" = 1'-0"
3 2'-1"
C-04
C-04 03 ID0.10
CABINET TOP 34" PLYWOOD W/PLAM FINISH ALL SIDES
2'-1"
S4
M9
DRAWER FRONT 34" PLYWOOD W/PLAM FINISH ALL SIDES
DRAWER FRAME 34" PLYWOOD W/ MELAMINE ALL EXPOSED SIDE
ID0.08
2' 1" 22
1" 12
QUARTZ COUNTER
4"
1 2"
CABINET TOP 34" PLYWOOD W/PLAM FINISH ALL SIDES 3'
3'
1'-6"
DOOR 34" PLYWOOD W/PLAM FINISH ALL SIDES
OPEN
M5
1'
P-1
STYLISH LAMINATE TOP +STEEL FRAME AND LEGS
2'-7"
STYLISH LAMINATE TOP
P-5 2"
MDF 18MM + FINGER PULL CABINET DOOR
3 EQUALS
P-5
1"
2'-7"
P-1
1'-5"
ADJUSTABLE SHELF 1" PLYWOOD W/PLAM FINISH ALL SIDE
1'-4"
M5
M6
BASE 34" PLYWOOD W/ PLAM FINISH ALL EXPOSED SIDE
OFFICE 1 SECTION
S7 ID0.09
1/2" = 1'-0"
141
OFFICE 2 SIDE SECTION 1/2" = 1'-0"
2' 3"
1'-11"
3 8" MDF BACK, MELAMINE FINISH EXPOSED SIDE
3" S6 ID0.08
M6
P-5
WALL PAPER + ACOUSTIC PANELS
2'
1'-6"
VERTICAL LIFT SYSTEM ALUMINUM FINISH
4
2
C-04 05
WOOD VENEER WALL PANEL
P-2
1'-9"
2'-3"
P-2
P-1
ID0.10
M10 1'
1'
1"
3" 118
1"
1 2"
BACK SPLASH TILE QUARTZ COUNTER
2'
DRAWER BOTTOM MDF W/ MELAMINE FINISHALL EXPOSED SIDES
1"
06
1'-11"
ID0.10
113 8"
DRAWER FRAME 34" PLYWOOD W/ MELAMINE ALL EXPOSED SIDE RUBBER BASE
COPY SECTION
S9 ID0.09
1/2" = 1'-0"
4 C-04 P-2
1'-9"
P-1
1'
DOOR 34" PLYWOOD W/PLAM FINISH ALL SIDES
M10 2'-1"
SHELFT 34" PLYWOOD W/PLAM FINISH ALL SIDES 1 2" MDF BACKING
LED LIGHT IN ALUMINUM CHANNEL
T-2 1'-8"
BACK SPLASH TILE DOUBLE RADIOUS SQUARE EDGE 4" HEIGHT PULL IN SATIN
4"
4"
2'
DRAWER FRONT 34" PLYWOOD W/PLAM FINISH ALL SIDES
2'-1"
LOWER CABINET + ADJUSTABLE SHELVE
RUBBER BASE 3"
S8 ID0.09
3"
RUBBER BASE
DRAWER FRONT 34" PLYWOOD W/PLAM FINISH ALL SIDES
S10 ID0.09
CAFE SINK SECTION 1/2" = 1'-0"
142
M10
CAFE SECTION 1/2" = 1'-0"
1" 2'-72
ID0.10
3"
7" 1'-68
1"
04
SHELFT 1" PLYWOOD W/ PLAM FINISH ALL SIDES
2'
4" HEIGHT PULL IN SATIN
8"
1"
M8
T-2
1'-8"
1'-8"
WC-6
RECESSED METAL FINGER PULL
MDF BACKING
1" 12
M8
PLYWOOD SURFACE / VENEER FINISH
1" 114
2'-1" 3" 108
DOOR 34" PLYWOOD W/PLAM FINISH ALL SIDES
INNER DRAWER TANDEM. ATTACH TO DOOR FRONT
OPEN SHELFT
2'-1"
3" 4
CABINET TOP 34" PLYWOOD W/PLAM FINISH ALL SIDES
1" 114
C-02
M10
N -2
WC
-3
P-1
WC-1
P-1
P-2
P-1
P-2
CA-1
CA-1
P-4
MEETING ROOM 402
P-3
P-1
WC
C.O OFFICE 403
P-1
WC-2
P-3
RECEPTION 401
T-2
V-1
T-1 G-1
P-1 V-1
G-1
P-1
BREAK ROOM 404
P-1
CR-1
GP-1
P-
1
CR-1
1
P-1
WC-6
V-1 WC-2
P-1
HAS
OPEN OFFICE 407
OFFICE 1 405
V-1
V-1
BOARD ROOM 408
P-1
P-2
CA-1
P-1
P-1
P-2
P-5
T-1
-4
T-2
WC
CR-1
TIN
WC-7
P-1
G-1
-4
GS
WC
P-1
CA-1
P-1
STR
OFFICE 2 406 P-5
EET 1
ID0.11
FINISHES PLAN SCALE: 1/4" = 1'- 0"
FINISHES SCHEDULE P-1
P-2
P-3
P-4
P-5
CR-1
V-1
CA-1
T-1
PRODUCT:
WALL PAINT
FINISH:
SILVER SATIN LRV: 76.35
PRODUCT:
WALL COVERING
FINISH:
NAME:
SILVER SATIN
DIMENSIONS:
N.A
NAME:
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
SQUATE CUTTER'S ROOM
BENJAMIN MOORE
LOCATION:
RECEPTION
ROSEMARIE TROCKEL / MAHARAM
LOCATION:
RECEPTION
PRODUCT:
WALL PAINT
FINISH:
ROCKPORT GRAY LRV: 35.65
MANUFACTURE/ SUPPLIER: PRODUCT:
WALL COVERING WOOD VENEER
FINISH:
MR-AH-4604-X POLISHED MAPLE
NAME:
ROCKPORT GRAY
DIMENSIONS:
N.A
NAME:
POLISHED MAPLE
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
ROLL SIZE 3.33 YD (3.2 M) REPEAT 12” W X 12” H
BENJAMIN MOORE
LOCATION:
RECEPTION
MAYA ROMANOFF/ METROWALLCOVERI
LOCATION:
MEETING ROOM
PRODUCT:
WALL PAINT
FINISH:
YORKTOWNE GREEN HC-133
MANUFACTURE/ SUPPLIER: PRODUCT:
WALL COVERING
FINISH:
FABRIC TYPE: NONWOVEN
NAME:
YORKTOWNE GREEN
DIMENSIONS:
N.A
NAME:
VARIANT
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
25.25" REPEAT / WIDTH 54”
BENJAMIN MOORE
LOCATION:
MEETING ROOM
MANUFACTURE/ SUPPLIER:
TEXTILE EFFECTS/ ODYSSEY WALLCOVER.
LOCATION:
C.O OFFICE
PRODUCT:
WALL PAINT
FINISH:
SAYBROOK SAGE HC-114
PRODUCT:
WALL PAPER
FINISH:
WALLPAPER
NAME:
SAYBROOK SAGE
DIMENSIONS:
N.A
NAME:
ESSENCE NORTHSTAR
DIMENSIONS:
N.A
MANUFACTURE/ SUPPLIER:
BENJAMIN MOORE
LOCATION:
LUNCH ROOM
PRODUCT:
WALL PAINT
FINISH:
GRANT BEIGE HC-83
NAME:
GRANT BEIGE
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
BENJAMIN MOORE
LOCATION:
PRODUCT:
EXPOSED STRUCTURE
FINISH:
CONCRETE
NAME:
N.A
DIMENSIONS:
N.A
WC-1
WC-2
WC-3
WC-4
PROTECTIVE TOPCOAT 65%CELLULOS 35% LATEX 4.923" X 39.38"
MANUFACTURE/ SUPPLIER:
GLAMORA/ ARCHITONIC.
LOCATION:
OFFICE 2
PRODUCT:
WALL COVERING
FINISH:
FABRIC- VENEER- METAL
N.A
NAME:
MARQUE | CUBOID
DIMENSIONS:
3.5” X 4” PANEL SIZE: 96" X 48"
OFFICE 2
MANUFACTURE/ SUPPLIER:
PINTARK/ ARCHITONIC.
LOCATION:
OPEN OFFICE
PRODUCT:
WALL COVERING
FINISH:
WOVEN WALL COVERING COLOR VEE 101
NAME:
VEE TILE
DIMENSIONS:
N.A
MANUFACTURE/ SUPPLIER:
WOVEN IMAGE / ARCHITONIC.
LOCATION:
BOARD ROOM
PRODUCT:
WALL COVERING
FINISH:
NON-WOVEN TEXTILE WALLCOVERING
NAME:
VOGUE WAVE
DIMENSIONS:
39" 1/3
MANUFACTURE/ SUPPLIER:
OMEXCO / ARCHITONIC.
LOCATION:
BOARD ROOM
PRODUCT:
GLAZING FILM
FINISH:
MANUFACTURE/ SUPPLIER:
N.A
LOCATION:
OPEN OFFICE
PRODUCT:
FLOOR LUXURY VINYL
FINISH:
CERAMOR FINISH
NAME:
ANTIQUE LIGHT OAK
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
INTERFACE
LOCATION:
RECEPTION
PRODUCT:
FLOOR CARPET
FINISH:
105576 GRANITE TUFTED PATTERN LOOP
NAME:
GRANITE
DIMENSIONS:
19.69" X 19.69"
WC-6
WC-7
WC-8
4.923" X 39.38"
MANUFACTURE/ SUPPLIER:
FLAGSTONE GLASSBAC / INTERFACE
LOCATION:
MEETING ROOM / OFFICES/ BOARDROOM
PRODUCT:
FLOOR PORCELAIN TILE
FINISH:
COLOR BIANCO MATTE
NAME:
SENZATEMPO
DIMENSIONS:
MANUFACTURE/ SUPPLIER:
STONE TILE
LOCATION:
G-1
NAME: MANUFACTURE/ SUPPLIER:
SX-1164 FROSTED SQUARES SOLYX®GLASS FINISHES
DIMENSIONS:
non-woven tex�le wallcovering THK 0.078" SQUARES 1” X 1”
LOCATION:
OFFICES
PRODUCT:
WALL CERAMIC TILE
FINISH:
GLOSSY – #LAR25848 NUANCE: V2 SLIGHT
35.4" X 35.4" X 0.4 THK
NAME:
LA RIVIERA
DIMENSIONS:
2.5ʺ × 8ʺ
LUNCHROOM/ KITCHEN
MANUFACTURE/ SUPPLIER:
EQUIPE CERAMICAS / CENTURA
LOCATION:
LUNCHROOM
T-2
143
/ DECORATIVE FILM
N T-3 C-4
3" 4'-132
29" 4'-164
C-1
C-4
M2
RECEPTION 401
C-1
29" 4'-164
4'
C-5
C-1
2'
5'
M9
M4
3'
C-3
3'-6"
C.O OFFICE 403
C-1
T-1
2'-4"
3'-10"
5'-7"
C-1
C-1
6'
MEETING ROOM 402
C-1
M1
M3
C-5
BREAK ROOM 404
C-6
T-4
C-6 M8
"
2'-4
"
C-7
C-5
C-7
M7
" '-11
3
TIN HAS
T-5
C-4
0" 4'-1
C-4
5'-3"
T-3
C-8
5'-5" C-7
C-5
C-7
BOARD ROOM 408
M10
5'-2" 3'
M5
OPEN OFFICE 407
4'-6"
3'-8 C-3
OFFICE 1 405
C-4 T-3
"
STR
1" 3'-1 OFFICE 2 406
2'-4
C-4
6'-10"
"
GS
5'-2
4'
W-1
"
3'-8
C-3 M6
EET 1
ID0.12
FURNITURE PLAN SCALE: 1/4" = 1'- 0"
GENERAL LEGEND X-X
FURNITURE SYMBOL
XX
BUILT-IN ITEMS
ROOM NAME XXX
144
ROOM NAME
Credits 1. Photos from #00-#33: https://www.pexels.com 2. Maps Graphics: https://snazzymaps.com
145