Lakeside Lutheran Link #20 (2021 Issue 2)

Page 13

Building improvement plans: library☑ locker room West Gym

As introduced in the last issue, we continue with debt-free plans to update our current facilities for efficiency and/or to enhance the functionality based on faculty and staff recommendations. While the locker room reno we introduced in spring is still in progress due to some supply chain issues, we have successfully completed the library/ study hall remodel. This success allows us to plan for the next goal—a West Gym reno to improve the chapel experience for wholeschool assemblies and provide more of an auditorium-feel for fine arts performances through a new retractable seating system, acoustical and aesthetic enhancements. We are hoping to garner donations through the early part of 2022 that will allow us to stay with an early summer start date in order to utilize the new features by start of school in August. See the back cover for another view and an opportunity for you to show your support for this exciting change.

before: may 2021

after: july 2021

As we introduced in the last issue, above is the “before” of the library’s north wall. The renovated space has become the study hall (previously in the lower level) and has also been used for several meetings and other functions, including the call meetings (at right). At left is a photo progression of the study hall reno from the “300 hallway” door. Goodbye, Superman v. Batman—you’ll live on in our fond memories. Lakeside Lutheran Link | 2021 Issue 2 | llhs.org | page 13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.