http://www.waterlinks.org/sites/default/files/Report%20for%20twinning%20PWA_0

Page 5

11. Pipes bringing water raw water, coagulated water, settled water, treated water to the Laboratory for ease of collecting water for testing

12. Jar test to be done daily or when any changes in raw water quality (heavy rainfall) - to get optimum alum dosage 13. To emphasize record keeping for future analysis and decision making 14. To prepare SOP for each individual work process 15. Training of operators to refresh/update knowledge and skill of operators 16. To provide appropriate state-of-art equipment at the treatment lab 17. Calibration of equipment and meter to be done periodically to ensure accuracy 18. Water samples to be taken at a fix and appropriate location so that trends can be develop from data collected 19. Program for water sampling to be established for water quality monitoring purposes (frequency of sampling) 20. Preventative Maintenance for all equipment and installations to be carried out systematically to avoid breakdowns


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.