
1 minute read
christopher elementary school
Bridgeport Neighborhood- Chicago
Construction to begin Spring 2023
Advertisement
For this project, I redesigned the modular building which is attached to the main building of the school. These buildings were originally designed to be temporary, but have become permanent as costs of construction have risen. We updated the cosmetic aspects, added new ADA accessible restrooms, and redesigned the layout to allow for updated technology to be placed in the classrooms. Additionally, the school requested a feature wall design for the corridor using school colors. Construction will begin in Spring 2023.





Axon and unfolded elevation of the feature wall design.


