Caterpillar Cat 924HZ Wheel Loader (Prefix WLB) Service Repair Manual Instant Download

Page 1

Service Repair Manual

Models

924HZ Wheel Loader


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

1/33

Shutdown SIS Previous Screen Product: WHEEL LOADER Model: 924HZ WHEEL LOADER WLB Configuration: 924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine

Disassembly and Assembly 924H, 924HZ, 928HZ and 930H Wheel Loaders Power Train Media Number -KENR7606-09

Publication Date -01/03/2015

Date Updated -09/10/2017

i07376985

Transmission and Torque Converter - Disassemble SMCS - 3001-015

Disassembly Procedure Table 1 Required Tools Tool

Part Number

Part Description

Qty

1U-9200

Lever Puller Hoist

1

138-7575

Link Bracket

3

8T-0372

Bolt M12 - 1.75 by 90mm

3

180-3033

Jack Stand Gp

2

180-3032

Jack Stand Gp

1

189-0410

Shackle As

2

8T-0644

Bolt M10 - 1.5 by 90mm

2

1U-9200

Lever Puller Hoist

1

138-7575

Link Bracket

4

189-0409

Shackle As

1

E

154-6181

Forcing Screw

2

F

136-1452

Retaining Ring Pliers As

1

G

1P-0074

Slide Hammer Puller Gp

1

4C-5653

Threaded Adapter

1

A

B

C

D

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

H

1P-1863

Retaining Ring Pliers

1

J

4C-6136

Lifting Bracket

1

K

1P-1861

Retaining Ring Pliers

1

L

1P-0510

Driver Gp

1

M

4C-3652

Compressor Assembly

1

N

1P-1857

Retaining Ring Pliers

1

1P-2322

Combination Puller

1

1P-0510

Driver Gp

1

1U-9889

Crossblock

1

3H-0469

Leg

2

3H-0468

Puller Plate

4

1A-1935

Full Nut

2

1U-7540

Hydraulic Cylinder

1

1U-5230

Hand Hydraulic Pump

1

1H-3110

Bearing Puller Gp

1

4C-6399

Compressor Assembly

1

2/33

P

Q

R Start By:

a. Remove the transmission oil pump. Refer to Disassembly and Assembly, "Transmission Oil Pump - Remove". b. Remove the transmission and the torque converter. Refer to Disassembly and Assembly, "Transmission and Torque Converter - Remove". Note: Put identification marks on all hoses, on all hose assemblies, on all harness assemblies, and on all tube assemblies for installation purposes. Plug all hose assemblies and all tube assemblies. This helps to prevent fluid loss, and this helps to keep contaminants from entering the system. Note: Cleanliness is an important factor. Before you begin the disassembly procedure, the exterior of the components should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism. Precision components can be damaged by contaminants or by dirt. Perform disassembly procedures on a clean work surface. Keep components covered and protected at all times.

NOTICE Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates.

Illustration 1

g01392601

1. Attach Tooling (A) and a suitable lifting device to the transmission and the torque converter. The weight of the transmission and torque converter is approximately 476 kg (1050 lb).

Illustration 2

g01392602

2. Remove bolts (1) and sight gauge (2).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

3/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 3

g01392621

3. Position the transmission and the torque converter onto Tooling (B), as shown.

Illustration 4

g01392620

4. Remove bolts (3) and coupling (4).

Illustration 5

g01392597

5. Remove torque converter (5).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

4/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 6

g01392622

Illustration 7

g01392630

6. Remove bolts (6). Use Tooling (C) and suitable prybars to remove plate (7).

Illustration 8

g01392632

7. Remove O-ring seal (8) from plate (7).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

5/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 9

g01392635

8. Remove O-ring seals (9).

Illustration 10

g01392639

9. Remove hose assembly (10). Disconnect the lower half harness assembly (12) and secure the harness assembly to control valve (11).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

6/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 11

g01393407

10. Attach Tooling (D) and a suitable lifting device to housing assembly (13). The weight of housing assembly (13) is approximately 141 kg (310 lb).

Illustration 12

g01393411

11. Use Tooling (E) to separate the housings. Remove housing assembly (13).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

7/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 13

g01395994

Illustration 14

g01393451

12. Remove bolts (15) and gear assembly (16).

Illustration 15

g01396199

13. Remove bolts (17) and gear (18).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

8/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(SE...

Illustration 16

g01395864

14. Use Tooling (F) to remove retaining ring (19).

Illustration 17

g01396011

15. Use Tooling (G) in a rotating pattern to remove bearing assembly (20).

Illustration 18

g01396014

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

9/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

10/33

16. Use Tooling (H) to remove retaining ring (23). Remove bearing support (21). Remove bearing (22) from bearing support (21).

Illustration 19

g01396015

17. Remove bearing cup (24) and bearings (25).

Illustration 20

g01396258

18. Remove sensors (28). 19. Use Tooling (J) and a suitable lifting device to remove the forward low and the forward high clutch group (26). The weight of clutch group (26) is approximately 27 kg (60 lb). Position shaft assembly (27) out of the way and remove clutch group (26). Note: When the clutch groups are disassembled, remove the plugs in the shaft to clean the oil passages. Use a punch to drive the plug into the shaft . Drill the remainder of the aluminum plug out of the bore. Be careful not to drill any portion of the walls of the bore. Use shop air or a cleaning solution to clean the shafts.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 21

11/33

g01397406

20. Remove retaining ring (29) and thrust disc (30).

Illustration 22

g01397412

21. Remove gear assembly (31).

Illustration 23

g01396271

22. Use Tooling (H) to remove retaining ring (33). Use Tooling (L) to remove hub (32) from gear assembly (31).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 24

g01396539

23. Use Tooling (K) to remove retaining ring (34). Use Tooling (L) to remove bearing (35) from hub (32).

Illustration 25

g01396540

24. Remove thrust disc (36).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

12/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 26

g01397401

25. Remove retaining ring (37) and plate (38). Remove discs (39) and plates (40). Note: Note the location of plates and discs for assembly purposes.

Illustration 27

g01397484

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

13/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

14/33

Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force.

26. Install Tooling (M) onto retainer (42). Use Tooling (M) and a suitable press to compress the clutch spring. Remove retaining ring (41). Slowly release the spring tension.

Illustration 28

g01397502

27. Remove retainer (42) and spring (43). 28. Remove piston (44).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 29

g01397562

29. Remove seals (45) from piston (44).

Illustration 30

g01397564

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

15/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

16/33

Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force.

30. If equipped, remove valve assembly (53). Remove seal (48), retaining ring (47), retainer (49), spring (50), and ball (51) from body (52). 31. Remove rings (46).

Illustration 31

g01397884

32. Reposition clutch group (26), as shown. Remove retaining ring (54), thrust disc (55), and hub (56).

Illustration 32

g01397964

33. Use Tooling (K) to remove retaining ring (57) from hub (56). Remove bearing (58).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 33

17/33

g01397953

34. Remove thrust disc (59). 35. Repeat Steps 25 through 30 to disassemble the clutch pack.

Illustration 34

g01397984

36. Attach Tooling (J) and a suitable lifting device to the reverse and second clutch group (60). The weight of clutch group (60) is approximately 32 kg (70 lb). Position clutch group (60) onto suitable blocking.

Illustration 35

g01397987

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

18/33

37. Remove retaining ring (61), thrust disc (62), and gear (63).

Illustration 36

g01398268

38. Use Tooling (H) to remove retaining ring (65). Use Tooling (L) to remove hub (64) from gear (63).

Illustration 37

g01398270

39. Use Tooling (K) to remove retaining ring (66). Use Tooling (L) to remove bearing (67) from hub (64).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 38

g01398284

40. Remove thrust disc (68). 41. Repeat Steps 25 through 30 for the disassembly of the clutch pack.

Illustration 39

g01398178

42. Use Tooling (P) to remove bearing (69).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

19/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 40

20/33

g01398180

43. Remove bearing (69), spacer (70), gear (71), spacer (72), thrust disc (73), and thrust disc (74).

Illustration 41

g01398280

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

21/33

44. Remove gear (75).

Illustration 42

g01398437

45. Use Tooling (H) to remove retaining ring (77). Use Tooling (L) to remove hub (76) from gear (75).

Illustration 43

g01398456

46. Use Tooling (K) to remove retaining ring (78). Use Tooling (L) to remove bearing (79) from hub (76).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 44

22/33

g01398438

47. Remove thrust disc (80). 48. Repeat Steps 25 through 30 for the disassembly of the clutch pack.

Illustration 45

g01398560

49. Attach Tooling (J) and a suitable lifting device to first gear and third gear clutch group (81). The weight of clutch group (81) is approximately 45 kg (100 lb). Remove clutch group (81).

Illustration 46

g01398561

50. Remove retaining ring (82), thrust disc (83), and gear (84).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 47

23/33

g01398645

51. Use Tooling (H) to remove retaining ring (86). Use Tooling (L) to remove hub (85) from gear (84).

Illustration 48

g01398657

52. Use Tooling (K) to remove retaining ring (87). Use Tooling (L) to remove bearing (88) from hub (85).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 49

24/33

g01398664

53. Remove thrust disc (89). 54. Repeat Steps 25 through 30 for the disassembly of the clutch pack.

Illustration 50

g01398562

Illustration 51

g01398564

55. Install Tooling (Q), as shown. Use Tooling (Q) to remove bearing (90). Extend the cylinder several times to remove bearing (90). Use spacers, as needed.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 52

g01398565

56. Remove spacer (91) and gear (92).

Illustration 53

g01398567

57. Remove thrust disc (93) and gear (94).

Illustration 54

g01398773

58. Use Tooling (H) to remove retaining ring (95). Remove hub (96) from gear (94). Use Tooling (L) to remove bearing (97).

Illustration 55

g01398774

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

25/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

59. Remove thrust disc (98) and washer (99).

Illustration 56

g01398776

60. Remove retaining ring (100) and plate (101). 61. Remove clutch plates and discs (103). Note: Note the positions of the plates and discs for assembly purposes. 62. Remove retaining ring (102).

Illustration 57

g01398814

Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

26/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

27/33

63. Position Tooling (R) onto seal assembly (105). Use Tooling (R) and a suitable press to compress the clutch spring. Remove retaining ring (104). Slowly release the spring tension.

Illustration 58

g01398781

64. Remove ring (106) and seal assembly (105).

Illustration 59

g01398796

65. Remove spring (107) and piston (108).

Illustration 60

g01398985

66. Remove seals (109).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 61

28/33

g01398975

67. Remove input shaft assembly (110).

Illustration 62

g01399007

68. Use a suitable press to remove carrier (111) and bearing cone (113). Remove ring seal (112) from carrier (111). Remove gear (114). 69. Use a suitable press to remove bearing cone (116). Remove gear (115).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

Illustration 63

g01399032

70. Remove bearing cups (117). Remove bearings (118) and (119).

Illustration 64

g01399185

71. Remove bolt (120), washer (121), and yoke (122).

Illustration 65

g01399193

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

29/33


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

72. Remove bolt (123) and washer (124).

Illustration 66

g01399321

73. Remove seal (125). Remove yoke (126) and brake drum (127) together.

Illustration 67

g01399325

74. Remove bolts (128). Remove plate (129). 75. Remove parking brake assembly (130) and lever (131).

Illustration 68

g01399332

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

30/33


Suggest: If the above button click is invalid. Please download this document first, and then click the above link to download the complete manual. Thank you so much for reading


924HZ Wheel Loader WLB00001-UP (MACHINE) POWERED BY C6.6 Engine(S...

76. Remove bolts (132).

Illustration 69

g06299489

77. Use two of bolts (132) as forcing bolts to remove cage (133). Remove shims (134).

Illustration 70

g01399379

78. Remove seal (135). Remove bearing cup (136) and lip seal (137).

Illustration 71

g01399397

79. Remove the output shaft and gear (140).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw... 2021/1/5

31/33


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.