
1 minute read
- CONTINUOUS IMPROVEMENT | SUSTAINING FOUNDATIONS -
B&T | BRIDGES & TUNNELS
MTA INTEGRATIONS
Advertisement

EAM HQ | HEADQUARTERS
DOB | BUS OPERATIONS (No Update)
LIRR | LONG ISLAND RAIL ROAD
• 6223 equipment records were created in Prod
• Requirements gathering for Insulated Joints collection in the field. IJ's will be verified or collected.
MNR | METRO-NORTH RAILROAD
• EAM processes standardized and documented.
• EAM Team completed 5-day Hexagon hands-on training to build capability to expedite system development.
• Launched a ChatBot on the EAM website to enhance user support.
• Mapped out support across EAM team, IT helpdesk, MoE and MoW helpdesk.
NYCT SUBWAYS
• Acceptance Testing personnel on the Nonconformity project in EAM Desktop & Mobile. Preparing to train the remaining 400 personnel in EAM Desktop & Mobile through July.
• Infrastructure: Trained and monitored 14 User Acceptance Testing personnel on the Fabrication, Truck Pickup/Delivery, Vent Inspections and Open Cut Retaining Wall project in EAM Desktop & Mobile. Preparing for the full deployment with remaining 20 personnel in July.
• Power: Deployed System Operations and Test East & West projects to 130+ personnel in EAM Desktop & Mobile
• Power: Testing Corrosion Control project in EAM Desktop & Mobile.
• Acceptance Testing personnel on the Trouble Call Expansion project in EAM Desktop & Mobile. Preparing for the full deployment with remaining ~700 personnel in September.
• SIR: Deployed Track Walking Inspections to 13 personnel in EAM Desktop & Mobile.
• SIR: Preparing for Defect Management User Acceptance Testing training in EAM Desktop & Mobile and Derails & Hand Throw Switch Inspections Go-Live in EAM Desktop & Mobile.
• Stations: Deployed Maintenance in Mobile project to 120 Station Maintenance personnel.
• Third Rail: Deployed Understructure Cable Inspections to 85+ personnel in EAM Desktop & Mobile.
• Track: Deployed Track Lube Inspections to 50 personnel, Nonconformities for Track Engineering Geometry & Thermal Inspections to 30 personnel, and Derailer Inspections to 50 personnel in EAM Desktop & Mobile.
• EMD CES: Testing All Shops project in EAM Desktop.