Construction workshop report

Page 1

Construction Workshop Report Date: 5th May 2014 Location: Level 1, 757 Swanston Street Aim: Use two pine timbers and two pieces of plywood to construct and test a bridge-­‐like structure to support the maximum load from above. Materials and tools used: • Two pine timber bars • Two pieces of plywood • Several steel and iron nails • Hammer • Hand saw • Cutting pad • Pencils and rulers with right angle

2 columns were designed in two places where the 3 spanning distances remained the same.

3 or more steel nails per joints

Design of structure: Idea of design: Considering about what our group had: 2 pine timber bars and 2 pieces of plywood, our group decided to construct an I-­‐shape structure, which required two pines bars and only one piece of plywood. The above is the sketch of what we were going to design, we expected our structure contains the following special aspects. • Diagonal bracing on both sides increased the integrality of structure.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.