The Danish Wind Case and The Bornholm Experiment The 2012 Curaรงao Conference on the future of Durable Energy WTC, Curacao, 29th March 2012 Per Lund Chief Engineer Development Department Energinet.dk

1


Agenda • Introduction to Energinet.dk • Operating the Danish Electricity System with 25%

wind power • Preparing for 50% wind power in 2020 and a fossil

free energy system in 2050 • The Bornholm Experiment

2


Energinet.dk • National Transmission System Operator for electricity and gas in

Denmark (TSO) • Independent public enterprise under the Ministry of Climate, Energy

and Building • Own Supervisory Board appointed by the Minister • The finances of Energinet.dk must break even, i.e. a non-profit company

• Approx. 590 employees, Headqueaters in Erritsø - Jutland • Owns and operates the Danish transmission systems for electricity

and natural gas

3


Core Tasks for Energinet.dk • Ensure short- and long-term security of supply for electricity and gas • Ensure well-functioning markets for electricity and gas • Ensure well-functioning emergency preparedness of the energy sector

4


Agenda • Introduction to Energinet.dk • Operating the Danish Electricity System with

25% wind power • Preparing for 50% wind power in 2020 and a fossil

free energy system in 2050 • The Bornholm Experiment

5


The Danish electricity system – development and policy

EU 20-20-20 target – 30% renewables in DK: • Power system may have to handle 50% wind

power! New Danish government – September 2011: • 2020: 50% wind power in electricity system • 2035: Fossil free electricity and heating systems

From primary to local generation

• 2050: Fossil free energy system

6


Wind power already exceeds hourly demand today! %

Wind power as percentage of consumption in Denmark West, 2010

120

100

80

60

40

Wind Energy coverage in DK West: 28%

20

0 jan-2010

feb-2010

apr-2010

jun-2010

jul-2010

sep-2010

okt-2010

dec-2010 7


Wind power balanced in a flexible generation system •

Coal fired power plants: •

Required to operate down to 35% of rated power

Some are capable to operate down to 10%

Combined heat and power plants: •

Hot water storage tanks decouple electricity and heat demand

Electric boilers give flexible demand

Wind farms: •

Grid codes ensure capability to support system

8


The electricity market is all about balancing Import Production regulation Nonregulating production The four market places in Denmark: Spot market (day-ahead) Intraday market

Electricitysystem

Consumption

Regulating power market Reserves

Export

9


Balancing and Grid Security Energinet.dk has developed two essential IT systems to manage the large amount of renewable generation: • Operational Planning System: • providing information on imbalances in the coming hours on

the basis of forecasts, up-dated generation plans, on-line measurements and DGM input

• Distributed Generation Management System (DGM): • providing the basis for forecasting renewable generation and

grid security calculations

10


Operational Planning System • Imbalance = Consumption - Wind Power - Local CHP

- Primary Power Stations +/- Exchange • Consumption, Wind Power and a minor share of Local CHP are based on

regularly up-dated forecasts • Primary Power Stations, most Local CHP and Exchange are scheduled by

the market players and are continuously updated on-line

• The dispatcher buys and sells regulating power from the regulating

power market to bring the imbalance close to zero • Remaining minor imbalances are balanced by automatic reserves

11


Distributed Generation Management System • 6300 generators on 4600 plants • 18 Balance Responsible Parties

for Production (PBR) • 4525 plants without individual

schedules • 75 plants with individual

Primary power stations Local CHP plants Wind turbines

schedules

12


Agenda • Introduction to Energinet.dk • Operating the Danish Electricity System with 25%

wind power • Preparing for 50% wind power in 2020 and a

fossil free energy system in 2050 • The Bornholm Experiment

13


Main challenges for the Danish electricity system Wind energy in electricity system

Security of supply

50% 2010

2020

Market function 25%

2010

2020

2010

2020

14


Energinet.dk’s strong prioritisation for 2020 Production

50% ? 50% Wind

Means and solutions

+ +

Robust transmission grid, strong interconnectors and market integration

Flexibility in demand and production – integrating the heat and transportation sector

Smart Grid for efficient control and market based regulation of the power system

15


Two examples of Smart Grid R&D projects in Denmark

• Cell Controller Pilot Project – Intelligent

mobilization of Distributed Energy Resources • EDISON - Large scale Electrical Vehicles

project in Denmark

16


Cell Controller Pilot Project world class Smart Grid RD&D

Cell Controller

Households Industry

Wind turbines

Households

Local CHP units

17 17


Input

150 kV

Pilot Cell area Holsted 60 kV Net Installed CHP: 37 MW Installed wind power: 39 MW Peak load: 61 MW 150/60 kV Trans: 100 MVA

Output

Cell Controller

60 kV

60 kV

10 kV

60 kV

60 kV

10 kV

10 kV ∼

∼ 60 kV ∼ 60 kV

10 kV

60 kV

10 kV

60 kV

∼ 10 kV 18


Typical Danish wind turbines and CHP units 5 CHP units and 47 wind turbines are located in the Holsted pilot area

19


Cell Controller development 2005-2011    

Distributed intelligent control at each DER and substation Technical VPP performance respects market operation Active response and balancing of all actions within few sec. A Technical VPP solution is now ready for deployment Agent

Agent

Level 4 DNO SCADA

Agent

Agent

Agent

Agent

Agent

Level 3 (150/60 kV Substation)

Agent

Agent

Level 2 (60/10 kV Substations)

Agent

Agent

Agent

Level 1 (Assets)

Agent

Agent

Agent

Level 0 (Units)

Virtual Power Plant

Complete report ready for download at www.energinet.dk 20


EDISON – Large scale EV project in Denmark

Power Exchange Electric Vehicle

Power Dealer

Balance Responsible

Electric vehicles in a Distributed and Integrated market using Sustainable energy and Open Networks 21


Smart Grids aspect: Capacity for EV charging

Case study in 0.4 kV feeder with 48 private houses in local grid at DSO NRGi-Net Amps Max. capacity in feeder

EVs are typical not at home in day hours

3 EV’s charging at the same time with 16 A 3-Phase in the Peak Hour at dinner time 18:00 65 EV’s might charge their daily consumption if distributed between 16:00 and 7:00 High value of Smart Grids for balancing the grid ! 22


Agenda • Introduction to Energinet.dk • Operating the Danish Electricity System with 25%

wind power • Preparing for 50% wind power in 2020 and a fossil

free energy system in 2050 • The Bornholm Experiment

23


DENMARK Energinet.dk (Initiator) Østkraft Center for Electric Technology, DTU Siemens IBM Landis+Gyr

BELGIUM ELIA EANDIS (+ORES)

GERMANY EnCT Siemens AG*

Bornholm – European Smart Grid lab Real people – real grid – real solutions!

SPAIN Tecnalia

PORTUGAL EDPD

EcoGrid EU partners

NORWAY SINTEF ER (Coordinator)

Bornholm

ESTONIA Tallinn University of Technology (TUT)

THE NETHERLANDS ECN TNO

AUSTRIA Austrian Institute of Technology (AIT)

SWITZERLAND IBM Zrl* Siemens, CH*

24


EcoGrid EU – not just another Smart Grid project • EcoGrid EU – cutting edge RD&D project on the Danish island of Bornholm • Testing a close to real-time market design – 5 min. market • Ensuring costumer participation • Ensuring balancing of power flow closer to and within the hour of operation

• Large scale demonstration in real grid with 2,000 real consumers • Scalability for Europe and many different grid platforms • Primary focus on the distribution grid and Renewable Energy Sources • TSO interest is local balance – with much higher penetration of RES • Alternative is to adopt imbalances in the transmission grid

• Economical benefit for everybody • Socioeconomically benefit – when RES are being utilized at an optimum • Using and rewarding consumer behavior for balancing the grid • Avoiding grid investments

25


EDISON and Cell Controller to Bornholm

Cell Controller

Households Industry

Wind turbines

Households

Local CHP units

26


Energy Consultancy A/S

Thank you for your attention! 27