Yi-Chun's Landscape Architecture Portfolio

Page 66

CORRIDOR ZIPPER Issues & Strategies Circulation Issue

Shuang Xi Park located in an important intersection that with heavy car flows during both work days and holidays. After some caculation of the daily capacity the result is much way too far from the current situation to the capacity it should be. So it have to make a lot of change from the current situation. The first thing is introduce the public transprotation such as the mass rapid transt system and city bicycle system to reduce the heavy traffic issues. Second is to change the circulation system from one layer into several virtical layers to make better use of the spaces.

Daily Capacity Analysis

Daily Visit:

Traffic Flow Treatment

11,506

Total Resident of Taipei City: 3,000,000 people/year Total Visitors: 1,200,000 people/year About nearly 8,219 people/day visit Yangming Mt. About nearly 3,287 visitors/day visit Yangming Mt.

Daily Leave: Total Resisident of Yangming Mt.: 35,538 people/year About nearly 98 people/day left Yangming Mt.

Daily Total: Total visitors of Yangming Mt. 11,408 people/day

98 11,408 City Bicycle Rental

MRT Station

Current Car Flow

Car Flow After improvement


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Yi-Chun's Landscape Architecture Portfolio by Jeremy Chen - Issuu