BRITEG - 3D Formworks

Page 6

Elbphilharmonie, Hamburg, germany by Herzog & de Meuron architects

MARTa, Herford by Frank Gehry

Special formworks for the Merkez-mosque, Duisburg, Marxloh

advantages of planning:

advantages at the building site:

Even the most demanding design defaults and geometry can be realized

Manufacturing and delivery of the formwork occurs „Just in Time“ The assembly of the formwork can occur directly from the truck – without temporary storage on the building site

Free of loss data takeover of the 3D surface model made available already from draft planning Development of the formwork solution optimum for every single module High precision of the formwork by digital and CNCsupported prefabrication – Exact by the millimeter! Manufacturing independent of weather and storage of the formwork at every season Early planning to the economic construction and assembly ability and observance of the maximum transport dimensions

Reduction of construction time and lowering of costs by the substantially lower formwork expenditure on site Low personnel expenditure for the formwork-installation and with the striking Assembly and application drawings for fast and precise positioning of the formwork on the building site Consideration of adjoining components, beddings, anchor positions etc. Economically combinable with every system formwork


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.