SUN DECK
HALL REMOVE ALL EXISTING MIROR FINISH TO BE REPLACE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS REMOVE EXISTING TOILETS & REPLACE FOR NEW ONE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS REMOVE PLUMBING FIXTURES & VANITY TO BE REPLACE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS
BATH 3
REMOVE ALL BATHROOM DOORS TO BE REPLACE AS NOTED ON MAIN FLOOR PLAN TYPICAL
BEDROOM 4
ELEVATOR POOL ABOVE
BEDROOM 3
REMOVE EXISTING TUB PREPARE FLOORS AND WALLS FOR NEW TILE AS NOTED ON MAIN PLAN REMOVE EXISTING TOILETS & REPLACE FOR NEW ONE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS
REMOVE EXISTING TILE AND PREPARE FLOOR FOR A NEW TILE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS REMOVE SHOWER TILE AND PREPARE FLOORS AND WALLS FOR NEW TILE AS NOTED ON MAIN FLOOR PLAN, TYPICAL
ELEV.EQ
BATH 4
REMOVE PLUMBING FIXTURES & VANITY TO BE REPLACE AS NOTED ON MAIN PLAN
CAR PARKING
REMOVE ALL EXISTING MIRROR FINISH TO BE REPLACE AS NOTED ON MAIN PLAN TYPICAL AT ALL BATHROOMS
TERRACE
CART PARKING CLS.
ELEVATOR
DEMOLITION FLOOR PLAN - UPPER LEVEL LOWER FOYER
NOT TO SCALE
DEMOLITION FLOOR PLAN - LOWER LEVEL NOT TO SCALE
Janette Legrand | janette@legrand.design | 305.322.2401 | Fort Lauderdale, Fl