CT TERMINALS
PRINCE RUPERT, B.C.
CONNECTING YOUR CARGO
Operated by CT Terminals, the Ridley Island Roll-On Roll-Off Ramp (RO/RO) provides shippers with a Canadian Gateway Solution for Project Cargo destined for Western Canada. With a Secure Laydown Yard, Railyard & access to Highway 16, the Ridley Island RO/RO is strategically positioned to handle all types of Project Cargo.
RO/RO Specifications: Barge
• 7,000T Barge - Length 105M, Beam 23.2M • 10,000T Barge Maximum (LLWL Restricted)
Ramp
• Length = 49.35M • Girder Spacing = 7.0M • Mass = 180T
Rail
• Ability to Effectively Transload Various Cargoes including Breakbulk, Container & Over Dimensional Project Cargo.
TO WESTERN CANADA. CT TERMINALS Ron Brinkhurst, Operator PH: 604-250-6466 info@tidaltransport.com
4 BC Shipping News June 2016
WWW.TIDALTRANSPORT.COM