PORTFOLIO
JA K E M O R T LO C K
ABOUT ME Highly creative and detail focused graduate architect with 3+ years experience. Has previously worked with large international companies on multiple high-end, large scale projects developing exceptionally capable Revit documentation skills. I am Very experienced in design development and construction documentation stages with a unique ability to pick up new projects quickly in a stressfull environment. Enthusiastically looking to learn new design techniques while completing my architectural registration.
E D U C AT I O N 2014 - 2015 MASTERS OF ARCHITECTURE Deakin University Geelong Masters Thesis on ‘Which architectural considerations can lower vulnerability to floods – A case study of Jakarta and Brisbane’
2011 - 2013 BACHELOR OF ARCHITECTURE Deakin University Geelong
EXPERIENCE 2015 - Present DETAIL 3
Graduate Architect / Architectural Documenter First graduate position working on medium to large projects in all stages of design with a strong focus on technical documentation. In addtion to this I was also tasked with concept design work, marketing material and preparing town planning drawing sets. Detail 3 is a unique practice that does in office design while also contracting staff out to other offices in need of short term staff with specialised skills. Offices I have been contracted to in this time include: Bates Smart | Mar 2016 | Jun 2016 Graduate Architect / Architectural documenter
AWA R D S 2015 AIA Victorian Sustainability Award for Masters
Awarded most sustainable design in Victoria for my final thesis - a floating flood shelter in Jakarta
DESIGN SKILLS Graphic Design Concept Design Sustainability in Design Design Development Construction Documentation Contract Administration BIM
Grimshaw Architects | Aug 2016 - Aug 2017 Mid level graduate architect / Architectural Documenter Genton | Sep 2017 | Jan 2018 Architectural documenter During these periods I had my contract extended and was specifically requested back at all 3 architecture firms.
PROGRAM SKILLS
REFERENCES Timothy Cox
Associate Principal at Grimshaw Architects (03) 9321 2600
Jamie McCutcheon
Senior Project and Design Architect at Genton Architects 0459 400 277
333 Church Street, Richmond, Victoria 0427 377 866 jakemortlock4@gmail.com
T HE SI S DESI GN
THE FLOATING MARKET | Jakarta, Indonesia Fifth year design unit at Deakin university. Exhibited at Melbourne Federation Square 2015 A+B exhibition AIA Victorian Sustainability Award for Masters Flooding in Kampung Melayu, Jakarta has become so common for residents that the attention it receives from the government and local media is non existent. The area floods at least 5 times a year during the wet season and has major floods every 5 years. These major floods can reach 12 metres above normal levels displacing thousands of citizens. Currently mosques hospitals and public areas become over crowded with the influx of people simply needing a place to sleep the night. This building attempts to provide beds and space for over 500 families affected during a disaster. The building will also serve a second major purpose, to give the people of Kampung Melayu a community public space they currently lack. The extreme density of the area means there is no open area available for public activities, markets or events. forcing residents to sell their wares on the side of the road. The building will therefore as a bridge market connecting both sides of the river through trade and social spaces. It has an emphasis on the connecting with water and how important the Ciliwung river is to the people in the area. Currently there is a sad build up of rubbish along both banks of the river that spill out into the community. By providing a space that clearly views the Ciliwung it is hoped that this will inspire locals to clean up and better their community. Giving usable, sturdy infrastructure to an area like this can be just the right catalyst to force a powerful cultural change that will enhance the lives not only of the people who use this building, but of everyone connected to this beautiful kampung.
SEC T I ONS
D E TAI LS
IN OF F I CE
LEXUS PAVILION | MELBOURNE CUP Detail 3 in collaboration with Joost Baker Temporary structure built for Lexus at the Melbourne Cup Status: Complete, re-used in 2016 Role: Responsible for bringing Joost’s sustainable and modular Melbourne Cup marque concept to reality. In charge of production of everything from concept/marketing material to schematic and construction drawings for the builder. Designed as a sustainable green temporary structure, the Lexus Pavilion is a great example of re-useable architecture. I was contracted to help document and realise Joost’s prototype concept for a green building. The overall building has three levels while the interior is large enough to fit a Lexus car on the ground level. Glazing modules with operable louvers enclose the interior space and allow controlled cooling through natural ventilation. A rooftop bar with Joost’s signature vegetation is also included on the third level to give the best views of the race that stops a nation. Working with a passionate client allowed me to throw as much of our knowledge and creativity into the project as possible, resulting in a successful building outcome.
FIN ISHE D D E S I GN
CON C EPT UAL R EN D ER S NOTE
PROJECT NAME
CHECK AND VERIFY ALL DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS INCLUDING THOSE BY OTHER CONSULTANTS, AND INCLUDING SPECIFICATION.
MFS LEXUS STAND
DETAIL 3 - ARCHITECTURAL FACILITATORS SUITE 3C, 68 OXFORD STREET, COLLINGWOOD VICTORIA AUSTRALIA 3066
N
1
2
3
4
0200
1 0300
5
6
7
2 3225
3150
3150
3225
3320
3300
3310
A
B
1
2
3300
0200
UP
0201
2
2
0300
0300
3310
C
D
1 1
0201
DATE
0300
PROJECT NAME
NOTE CHECK AND VERIFY ALL DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS INCLUDING THOSE BY OTHER CONSULTANTS, AND INCLUDING SPECIFICATION. SEEK CLARIFICATION OF INCONSISTANCIES/ CONFLICTS. FIGURED DIMENSIONS TAKE PRECEDENCE TO SCALED DIMENSIONS. THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF DETAIL 3.
MFS LEXUS STAND Enter address here DRAWING TITLE
PRELIMINARY
GROUND FLOOR
DRAWN
D3
DATE
CHECKED
6/06/2016 Checker 2:27:05 PM
PL A N S + EL EVAT I ONS
SCALE
1 : 50 @ A1
JOB N
1644
IN OF F I CE
477 COLLINS STREET | MELBOURNE CBD Working at Grimshaw Architects 40 story premium grade commercial tower Role: Mid-level architectural documenter/graduate In charge of structural design package and its coordination with architectural intent for the entire building. This involved attending weekly consultant meetings with the structural engineers (AECOM) and constant Aconex correspondence through sketches, skype calls and phone calls. Production of concrete profile plans for all 40 levels of the tower including the basement from early DD phase, through tender documentation and finally construction drawings. Co-ordination of services with service engineers and how this interacted with structural design while having minimal impact on architectural design, e.g structural penetrations and location of services. This was achieved through constant consultation between structural engineers (AECOM) and service engineers (ARUP). These meetings were mediated by me and other architects, an extremely complex task for a new tower. Production of construction piling plans, structural details and precast/ insitu concrete elevation plans fully co-ordinated with consultant models through BIM clash detection procedures.
A01
A03
A02 9900
9000
9000
4
3
A1181
A1181
5507 C L
1840 PRECAST
21000 PRECAST
C L
C L
EQ
C L
EQ
C L
EQ
13617 PRECAST C L
EQ
C L
EQ
C L
EQ
EQ
C L
C L
C L
1100
C L
1100
C L
1100
C L
1100
C L
1100
1100
C L
1100
C L
1260
C L
1100
C L
1100
C L
1100
C L
1100
C L
C L
HH H
70
C L
3790 C L
1094
H
H
H
H
H
H
H
H
H
H
H
H
C L
H
H
C L
768
1260
H
C L
1247 C L
1110
H
H
H
C L
4270 C L
1100
C L
1100
C L
C L
1090
H
H
C L
1945
C L
1945
1945
C L
C L
C L
970 C L
1260
C L
1100
H H
H HHH
H
C L
1945
689 466
370
1100
C L
165 C L
C L
CONNECTION & EXTENT OF PRECAST SUBJECT TO HERITAGE SURVEY
C L
SLAB EDGE
C LC L
C L
1945
5044
C L
1100
C L
1100
C L
1100
1100
C L
H
H
H
H
3187 C L
1100
C L
C L
PRECAST SETOUT
561
H H
H
4 A1181
H
H
H
1100
C L
H C L
1190
1100
H
1045
C LC L
50 610
H
C L
1100
C L
H
1035
C L
7794
7880 PRECAST
C L
STEP C L
1100
C L
680
H
H
1035
980
C L
H
H
3590
H
5078
1775
CON-104
5 A1182
750
SSL +
1775
CON
950 260
STEP 2422
C L
1901
C L
358
1402
H
FW
H C L
2276
C L
FW
140
H 5974
6 A1182
1290 UP
PAD FOOTING SET TO 50MM BENEATH THE UNDERSIDE OF LOWER (RL 3.710) SLAB
3026
1410
2354
C L
SSL + 3.990
570
C L
285
C L
STEP
3808
4030
CON-105
C L
FW 4325
C L
C L
920
OPENING
A1192
3638
C O L
C L
CON-
AIR LO
10 11
DSP
DSP
SSL + 4.010
SSL + 4.010
5
C L
FW
GOODS LOBB
12
2 A1182
SSL + 4.
C L
750
300
150 1770
1
4910 PRECAST
CJ 3950
OPENING
1020
2200
A1182
1:85
SSL + 4. CON-10
CON-105 IO
IO
3535 C L
504
4725
220
2950
7436
1800 PRECAST
2860
C L
EXISTING INSITU SHEAR WALL TO BE RETAINED
11950
3100
RAMP
C L
COL
PRECAST SETOUT
190
IO
C L C L
3315 C L
3115 C L
3115
3115
C L
3115
C L
3115
C L
18889 PRECAST
C L
C L
A05
1
2
A1182
A1182
A07
A06 9000
A
9000
9000 1158
315
3200
13642
16209
RAMP
RAMP
PAR T BA SEMEN T CP CON STRUCTION DR AW I NG 1:24 580
C L
300 1080
1:6
1:6
CON-103
CON-103
C L
4140 C L
3270
C L
C L
C L
6100
STEEL SETOUT
175
C L
SC
SC
SC
C L
2450
2460
CON-106
LIFT PIT
999 185
70
C L
2460 C L
800
SSL + 4.140
C L
CON-106
LIFT PIT
A1192 13
260
SSL + 4
STEP
1880 C L
1880 C L
2460 2460 FW
CON-104 50mm STEP
FW
DSP
LIFT PIT ACCESS
6
A1150
FW
1955
STAFF R KITCHEN
2
15
SSL + 4.010
CJ
C L
11
SSL + 4.010
CON-106 DSP
7
FW
4900
12
SSL + 4.010
CON-106
CON-105
A1192
H
STAF ACCESS SHOWE WC C L
C L
SSL + 4.010
SSL + 4.190 A1192
C L
9 LIFT PIT
1730
C L
8 LIFT PIT
FW
C L
1165
C L
C L
360360
C O L
140 854
C C L L
CJ
C L
C L
2330
CON-105
1:49
750
480
C L
C L
979
PIT
H
CO
SSL + 4.010
1250 35 920
SSL + 4.190
1530
CJ
6
FW
3364
6500
SSL + 4.010
C L
C L
HERITAGE SEWER PUMP PIT REFER HYD DWGS
C O L
H
450 250 250
CJ
C L
A1192
1750
FW
C O L
FW
FW
C L
FW
2425
C L
990
H
H
2290
H
H
220 1370
355
240 C L C L C L
930
SSL + 4.140
STEEL SOLDIERS
H
C L
1370
C L
FW
A1181
2330
C L
C L
1090
C L
H
C L
C L C L
2151
FW
CON-105
4266 754 220
H
C L
SSL + 4.060
UP
COS
SITE BOUNDARY
1100
6895
H
920
6050
C L
1100
920
C O L
C L
91 120
C L
2455
220
2630
LIFT PIT ABOVE
C L
12530
STRIP DRAIN 120x30 REBATE
C L
2000
C L
STEEL SOLDIERS, REFER STRUCTURAL DRAWINGS
1100
H C L
690
5
4390
14
C L
1100
H
A1181
4990
H
FW 1093 C L
C L
1100
2445
C L
6070
7820
SSL + 4.050 1250
STEP
H
C L
SS
2070
564 536
7830
7920 PRECAST
C L
C LC L
920
70
FW
2580
H
1100
1630
3510 C L
C L
2330
FW
360 1720
PIT
C L
C L
C L
A1181
CON-104
3361
5264
A1192 C L
INSITU WALL
LIFT PIT ABOVE
1100
STEP
A1192
16
4010
H
C L
3
SSL + 4.070
C O L
465CL465
FW
1023
2700 3070 PRECAST
17
1100
2040
STEP
3070
1620
FW
FW
920
C L
H
C L
FW
H C L
H
SSL + 4.010
A1181
H
1365
5783
6890 PRECAST
C O L 3973
SLAB EDGE
2861 1145
UP
SSL + 4.200
6
995
C L
18 5220 SLAB EDGE
PRECAST 2250
STORMWATER PIT. REFER CIVIL DRAWINGS
C L
1100
H C L
C O L
1817
80 1450
STAIR
C L
COL
3770
A1192
C L
225
2470
FW
H
6235
SSL + 4.010
C L
1100
1855
H
C L
C L
13990
C L
PLANT
H
H
5044 SLAB EDGE
5150 SLAB EDGE
CON-106
3460
C L
C L
UP
C L
9960
CON-104
C L
1260 50 1100
50
H
C L
C16 HERITAGE NIB WALLS REMOVED IN LINE WITH SITE OBSERVATIONS
SSL + 4.050 C L
1300
C L
7835
C O L 2292
SLAB EDGE
C L
C L
4790 140
IO
230
1100
H
2129
COL
C L
H
2685
3877
C L
FW 2780
A1181
4505 IO COL
555
C L
5
3330
C LC L
COL
5585
CON-104
MALE END OF TRIP FACILITY
120 C L
7835
C L
SSL + 4.543
SSL + 4.050
IO IO
9960
C L
C16 HERITAGE NIB WALLS REMOVED IN LINE WITH SITE OBSERVATIONS
CON-103
2100
2800
50
C L
2800 50 C L
1545
C L
C L
C L
350350
C L C L C L
6275
200600
C L
C L
C L
ST
1530 2330
C L
2280
C L
C L
640
335
C L
750 300 750
305
F
C L
700
E
EQ EQ
50 400 2450 320 2450
C L
26.460
ST
EQEQEQEQEQ
C L
2450
LEVEL P8
2100
2800 FFL
100
200
320
F
E
C L
180 400
29.260
640
2350
P9 SERVICES TO BE INCLUDED IN DOOR PENETRATION ABOVE CEILING LEVEL.
C L
LEVEL P9
700
FFL
5800
300 50
4700
2160
350
3100
2120
C L
F
2800
2390
100
22
C L
2160
E
C L
32.060
C L
LEVEL 06
820
F FFL
CONSOLIDATED SERVICES PENETRATION
1000
3800
700
680
E 2040
550
35.860
600
LEVEL 07
1110
FFL
1967
1016
LEVEL P0
1.860
FFL
DATUM
0.000
350 290
2098
900 6000
6000
190
190
2098 C L
40 980 300
2570
1325
E
E
1020
E
350 595 450
1800
15/03/2018 7:32:37 PM PRINTED:
D E TA I LS
GENERAL NOTES 1. ALL ELECTRICAL PENETRATIONS OF Ø100 mm AND SMALLER HAVE NOT BEEN SHOWN. THESE PENETRATIONS SHALL BE COORDINATED ON SITE BY THE CONTRACTOR. 2. FIRE PENETRATIONS TO REQUIRE FIRE COLLAR OR FIRE RATED PACKING, TO BE COORDINATED WITH SUB CONTRACTOR. 3. LIFT BRACKETS TO LIFT MANUFACTURES REQUIREMENTS 4. LIFT REBATES TO LIFT CONTRACTORS DETAILS 5. SETOUT FOR TOWER CRANE FIXING POCKETS TO BE REFERANCED FROM ROBERT BIRD ENGINEERING DOCUMENTATION. ANY DICSREPANCIES TO BE RAISED WITH BASE BUILDING STRUCTURAL ENGINEER.
4050 375
1285 275
C L
750
CONSOLIDATED SERVICES PENETRATION 1770
C L
325
F F
2300
C L
F
200
C L
280
F
325
2100
C L
250
C L
1500
SCALE 1 : 100
www.grimshaw.global
C L
C L
1150
750 300
CORE ELEVATION 01
Telephone +61 (03) 9321 2600 Address 21 Bouverie Street Melbourne VIC 3053 Australia
860 400
860 400
900
640 2160 2160
440
400
C L
1025
1020
598
480
1860
1
L
C L
640
320 320
100
2360 250
450 640
1200
2100
FFL
2150
4.010
1480
C7 PENETRATION ADDED
1010 FFL LEVEL P0 MEZZ
200
C L
700 400
900
3100
LOBBY
1800
C L
F-FIRE SERVICES PENETRATION E - CABLE TRAY PENETRATION
100
975
C L
220
1060
6.860
1020
2450
2910
2100
880
700 306
LEVEL P1
2850
FFL
8.400
2800
FFL LEVEL P1 MEZZ
P2 SERVICES TO BE INCLUDED IN DOOR PENETRATION ABOVE CEILING LEVEL. 1487
F
COMBINED SERVICES PENETRATION
1800
EQ EQ
350
E
1100
2400
9.660
350 240
LEVEL P2
C L
1510 FFL
2450
C L
2100
2800
4370
500
F
1075 300
2160
2450
F
E
550 450
12.460
LEVEL P3
C L
350
12.900
FFL
C L
2100
340
2800 FFL LEVEL P3 MEZZ
F
F
C L
E 4130
700
15.260
C L
1500
640
C L
750 250 C L C L
C L
LEVEL P4
230
C L
425400 FFL
C L
2160
315
C L
2485
C L
C L
320 2100
2800
C L
750 300
320 320
F
E
C L
C L
18.060
700
LEVEL P5
2100
2800 FFL
C L
700
F
E
C L
320
20.860
300 365 330 400
175
2450
LEVEL P6
2100
2800 FFL
2450
F
E
C L
700
23.660
C L
LEVEL P7
2450
FFL
C 640 L
208
A03
A05
A04 9000
200
3100
100
300
2700
200
2400
200
3100
100
200
2900
200
1800
200
3600
1570
A1183
C L
520
C L
1955
1060
2320 625
1140 1020
C L
1750
140
870
OPENING
200
3950
1855
300
1140
2310
300
2215
400mm THICK WALL
140 2995 PRECAST
4
1
2
3
4
5
6
7
7
6
5
4
3
2
1
9
8
1
2688
SL AB
100
SSL + 1.660
2705
1150
A1185
6
SSL + 1.810
200
SSL + 3.710
LIFT PIT SSL + 1.660 2490
SSL + 4.010
SSL + 3.710
LIFT PIT SSL + 1.660
SSL -1.090
665
100 5080 CLEAR SHAFT OPENING
1740
630
OPENING 730
LEVEL P0 - CORE PLAN
2500
70 130
B03
5080 LIFT PIT
TOPPING SLAB TO BE POURED OVER RAFT
120mm WIDE STEEL BEAM. REFER TO LIFT CONTRACTOR DOCS FOR DETAILS
730
3
SCALE 1 : 50
SSL + 6.860
1
2
3
4
5
31
30
29
27
26
5
4
3
2
F
F
F
F
SSL + 6.860
1
UP
1060
200
1197
1018 OPENING
2750
SSL + 6.860 400
3
700
A1185
A1186
1
300
700
SSL + 6.840
3325
625
20mm STEP
SSL + 6.840
5 SSL + 6.860
A1184 TYP 50mm SETDOWN FROM FFL FOR LIFT DOORS.
LOBBY
A1185 200
120
2
860
1150 OPENING
760
795
1150 OPENING
1450
1150 OPENING
665
SSL + 6.810 SSL + 6.810
19
A1185
6
18
2500
VOID
1550 OPENING
1
2910
12
3100
5
2890
3020
3020
SSL + 6.810
A1186
2
250 450
660 150250200
15
VERTICAL AND HORIZONTAL PENETRATION (BELOW) TO ALIGN. PENETRATION IN WALL BELOW SHOWN DASHED.
12530
5
TRANSFER OF PIPEWORK OVER TO PENETRATIONS SHOWN DASHED
A1150
2600 OPENING
A1186
200
1940 OPENING
14
650
150
20mm STEP
200
1
A1184
1500 OPENING
B02
200
1690
325
A1185
31
16
2. LOCA DRAWIN CONTR
3. SERV ENGINE TO COO DRAWIN
5 750
A1150
2490
100
2490
25050
B03 100
1 A1102
LEVEL P1 - CORE PLAN SCALE 1 : 50
200
2
NOM 80mm REBATE AT GOODS LIFT DOOR FROM FFL. REFER TO LIFT CONTRACTOR DOCS FOR DETAILS
2500
70 130
SC
1. ALL S U.N.O
SSL + 6.810
17
P
GENERA
200349
7
6110
120 WIDE STEEL BEAM. REFER LIFT CONTRACTOR FOR DETAILS
120
2
11
1
30
A2 FIRE STAIR 6
1
SSL + 6.860
29
SSL + 6.860
A1195 920 OPENING
3020
6
200
200 3020
SSL + 8.320
700
SSL + 6.860
27
6
880 450
26
2702
1500 OPENING
400mm THICK WALL
2450
450
1275
2850
4
26
400
600
1020 OPENING
300
H
1
2340
1500 OPENING
3000
600
2340
475
200
1500 OPENING
350 235
H
2310 250
F
3
475
3605
1900
300
500
F
400 200
F
A1193 24
2950
1930 2
3020
3
920 OPENING
920 OPENING
3020
10
A1185
3950
A1 FIRE STAIR
120
2130
2130
120
120
6220 5
A1185
1020 OPENING
3030
920 OPENING
920 OPENING
3030
3030
A1184
7
13
A1184 3020
3030 3020
4
300 300 300
200
UP
SSL + 6.860
120
6220
120 WIDE STEEL BEAM. REFER LIFT CONTRACTOR FOR DETAILS
1060
C9 PENETRATIONS DELETED
1200
1200
4
9
3600
F
A1150
8
200
C9 PENETRATIONS RELOCATED
980 40 OPENING
1
50300
1800
100 300
200
280 550
A1183
2900
250 450
100 200
1500
3100
LEVEL P0 -
525
200
1000
2400
20mm STEP
200
460
2700
750
100 300
350
3100
330
200
840
2450
3200
6110
200
550
300
A1184
1740
NOM 80mm REBATE AT GOODS LIFT DOOR FROM FFL. REFER TO LIFT CONTRACTOR DOCS FOR DETAILS
SCALE 1 : 50
920 OPENING
2
A118
300
2500 CLEAR SHAFT OPENING
2490
1970
1550
OPENING
DSP
STEP
DSP
STEP SSL + 3.710 LIFT PIT
6
OPENING A1737
1500
1450
5433
DSP
OPENING
1150 OPENING
50
795
0
745
2450
1150
2500 CLEAR SHAFT OPENING
1790
2 875
750
750
GOODS L LOBBY
A1184
250
A1150
A1185
12530
C L
3
1060
SSL + 1.660
OPENING
5
A1101
A1186
2
STEP SSL + 1.860
GOODS LIFT LOBBY 3525
1
2650
1020
1034
OPENING
3000
100
FW
STAFF CORRIDOR
A1186
4150
SE C O ND AR Y
C L
230
1989
1060
H
78
20mm STEP
200
3020
6160 CLEAR SHAFT OPENING
120 3020
6160 CLEAR SHAFT OPENING
12
A1185
1815
1200
920
7
LIFT PIT
A1185 SSL + 4.010
1
C L
3365
4225
EF ER -R 4025
5
O VE R
MAIL ROOM 1 A1186
SSL + 1.840
C L
OPENING
920 6110
2020 920
11
2850
/A 11 50 03
1
C L
4
MAIL ROOM 2
STAFF ROOM/ KITCHENETTE
SSL + 4.010
SSL + 1.860
A1184
H
50
1200
5
OPENING
120 3020
6160 CLEAR SHAFT OPENING
LIFT PIT
DSP
2020
6
SSL + 4.010
OPENING
920
3020
DSP
OPENING
A1195
120mm WIDE STEEL BEAM. REFER TO LIFT CONTRACTOR DOCS FOR DETAILS
A1185
13
SSL + 1.660
STEP 20mm
A1185
2200
SSL + 1.860
2960 CLEAR SHAFT OPENING
SSL + 4.010
450
200
1500 OPENING
CLEAR SHAFT OPENING
1500 OPENING
3
1550
SSL + 4.010
SSL + 4.010
OPENING
2300
600
12
200
STEP 20mm
6112 628 920
1020
OPENING
A1185 SSL + 4.0102
200
LIFT PIT ACCESS
475
200
12530
1500
11
UP
SSL + 1.840
OPENING
10
1360
10
B02
OPENING
11
410
CLEANERS STORE
AIR LOCK
SSL + 4.010
9
3150
SSL + 1.860
12
A2 FIRE STAIR
3
SSL + 4.010
8
SSL + 1.860 13
SSL + 1.660
OPENING
2605
SSL + 4.010
A1185
SSL + 1.660
1
C L
SSL + 1.860
FW
6170 CLEAR SHAFT OPENING
1730 C L
FW C L
SSL + 1.840
A1193 UP
A1 FIRE STAIR
Sim
1300
FW
1590
C L
360
1225
STEP 20mm
SSL + 1.860
C L
50 120
10
3020
DSP
6170 CLEAR SHAFT OPENING
6220 5
920
A1184
OPENING
920
OPENING
7
2130
2130
120
DSP
A1184
2300
A1184
LIFT PIT
4
3020
6170 CLEAR SHAFT OPENING
LIFT PIT
STAFF ACCESSIBLE SHOWER & WC
3030
9
6170 CLEAR SHAFT OPENING
920
OPENING
920
8
OPENING
3030
1200
1200
50
120mm WIDE STEEL BEAM. REFER TO LIFT CONTRACTOR DOCS FOR DETAILS
H
360
300
1280 PRECAST
300
1
50
2450
A1150
250
300
4
9000
5080 LIFT OPENING
4. ONLY 100mm
5. ALL S AND ON
6. REFE FLINDE
120 WIDE STEEL BEAM. REFER LIFT CONTRACTOR FOR DETAILS
7. UPST 1250H F FOR DE
A1183
8. CAST SLABS.
PRINTED:
15/03/2018 7:12:58 PM
9. SETO REFERA DOCUM BASE B
Telephone +61 (03) 9321 2600 Address 21 Bouverie Street Melbourne VIC 3053 Australia www.grimshaw.global
INTELLECTUAL PROPERTY
REV DESCRIPTION
© Copyright Grimshaw architects Pty limited. Unless otherwise agreed in writing; All rights to use this document are subject to payment in full of all Grimshaw charges; This document may only be used for the express purpose and project for which it has been created and delivered. as notified in writing by Grimshaw and this document may not be otherwise used, or copied; Any unauthorised use of this document is at the user's sole risk and without limiting Grimshaw's rights the user releases and indemnifies Grimshaw from and against all loss so arising.
C1 C2 C3 C4
GENERAL NOTES
C5 C6
Contractor must verify all dimensions and conditions on site before commencing work or preparing shop drawings. Do not scale drawings. Grimshaw has produced this drawing based on existing drawings and information provided by the client. Additional information is required prior to construction
C7 C8 C9
FOR CONSTRUCTION - P0-P2 CONCRETE SET-OUT FOR CONSTRUCTION - P0-08 STRUCTURAL STEEL PART 1 FOR CONSTRUCTION - P0 - L15 CONCRETE & MASONRY FOR CONSTRUCTION - CONCRETE CORE P0-P3, CONCRETE ELEVATIONS FOR CONSTRUCTION - P1-L15 CONCRETE DRAWINGS FOR CONSTRUCTION - CONCRETE AND PRECAST UPDATES FOR CONSTRUCTION - CONCRETE CORE PLANS P0-P9 FOR CONSTRUCTION FUTURE REVISION (NOT YET ISSUED)
DATE YYMMDD 17.07.21 17.07.28 17.08.22 17.09.07
CLIENT
SERVICES
ARUP Level 17, 1 Nic Melbourne 300
STRUCTUR Level 5, Building Q3, 6 Riverside Quay Southbank VIC 3006
17.10.16 17.10.30 17.11.15 17.12.15 XX.XX.XX
CORE CONSTRUCTION DR AW I NG
AECOM Collins Square, Collins Street, M
INTERIOR C
CARR Level 4, 31 Flin Melbourne, VIC
IN OF F I CE
900 ANN STREET | BRISBANE Detail 3 in collaboration with John Wardle Architects 15 level multi-use commercial tower Status: Under construction Role: Graduate architect Coordination and drawing of schematic design drawings into design development and construction documentation stage. Revit BIM management and model control.
6
5
9650
4
7150
9000
3
2
9000
1
7150
9650 CANOPY TO TERRACE. REFER A6333 FOR DETAILS
LEVEL 06 SSL 28.350
LEVEL 05 SSL 24.400
ELEVATION L5 BEHIND BRICK PODIUM 3 3030
1 : 200 7
6
5
9650
4
7150
9000
3
2
9000
1
7150
9650
PROVIDE CONDUIT/SERVICES FEED FOR ILLUMINATED SIGN BY OTHERS. ALLOW FOR LOADING ON FACADE
LV-01
3 6116
3100
4350
6000
1650
PARAPET SSL 70.300 TOP OF FACADE SSL 68.650
LEVEL 15 PLANT SSL 64.300
4350
4400
LEVEL 08 SSL 36.250
LEVEL 07 SSL 32.300
LEVEL 06 SSL 28.350
LEVEL 05 SSL 24.400
3950 3950 3950 3950
LEVEL 09 SSL 40.200
3950
LEVEL 10 SSL 44.150
FS-04
3950
LEVEL 11 SSL 48.100
3950
LEVEL 12 SSL 52.050
3950
LEVEL 13 SSL 56.000
3950
LEVEL 14 SSL 59.950
3 3030
OVERFLOWS
OVERFLOWS
4100
CD-01 OF
OF OF
4100
LEVEL 04 SSL 20.300
FS-09
LEVEL 03 SSL 16.200
4300
CD-02 BK-01 BK-02 BK-03
LEVEL 1.5 Mezzanine SSL 8.650
5900
1500
LEVEL 02 SSL 11.900
CHURCH STREET 3000
GROUND CAFE SSL 7.180
FHR
LEVEL 01 -LOAD DOCK SSL 6.000
FS-06
BASEMENT 1 LEVEL UPPER SSL 3.000
3700
KES STREET
7
PROVIDE CONDUIT/SERVICES FEED FOR ILLUMINATED SIGN BY OTHERS. ALLOW FOR LOADING ON FACADE
FS-06
FS-06
CD-02
FS-09
FS-09
L LOWER
3000
BASEMENT 2 LEVEL UPPER SSL 0.000
L LOWER
ELEVATION NORTH WEST 1 1001
1 : 200
EL E VAT I ON
PR OG R ES S PH OTOS
E
7
E
CD-01
ZINC ROOFING 110
CM-03
50
190
LEVEL 03 FFL 16.350
400
150
FOLDED ALUMINIUM CAPPING
210
LEVEL 03 SSL0316.200 LEVEL SSL 16.200
REINFORCED BLOCKWORK WALL REFER ENG'S DETAILS VARIES
520
CD-02
SPANDREL CLADDING CRANKED ALUMINIUM MULLIONS
LEVEL 05 FFL 24.550
10
2024
LEVEL 05 SSL 24.400
300
STEELWORK TO ENG'S DETAILS
LEVEL 05 SSL 24.400
342
LEVEL 05 FFL 24.550
FS-01
(VERTICAL) COL
EXP.JOINT (BEYOND)
98C
94C FLASHING WEEPHOLES
CL-06
SUSPENDED ACOUSTIC TILE CEILING
XT-02
1029
CL-01
SUSPENDED PLASTERBOARD CEILING
THERMAL & VAPOUR PERMEABLE MEMBRANE CL-01
SUSPENDED PLASTERBOARD CEILING
XT-02
THERMAL & VAPOUR PERMEABLE MEMBRANE FLASHING FLASHING
1543
2057
176C 176 C
3000
82C
4300
2700
WEEPHOLES
WEEPHOLES
CL. 2.700
CL-06
CL-01
FS-09
12mm STEEL PLATE SILL
240
255
58C FS-03
CHURCH AREA
FLASHING COL
(RECLINED)
XT-02FC-10
158C
4100
342
WEEPHOLES CP-02
THERMAL & VAPOUR PERMEABLE MEMBRANE
LEVEL 02 SSL0211.900 LEVEL SSL 11.900
FLASHING WEEPHOLES
533
430
FLASHING
COMMERCIAL OFFICE
ACCESS FLOOR
LEVEL 04 FFL 20.450
AF-01
150
WEEPHOLES
49C
EXP.JOINT (BEYOND)
1210
10
LEVEL 04 SSL 20.300
410
FLASHING
COMMERCIAL OFFICE
WEEPHOLES
300
10
CD-02
SPANDREL CLADDING
147C
ACCESS FLOOR LEVEL 04 FFL 20.450
AF-01 CL-01
3000
150
LEVEL 04 SSL 20.300
2732
FS-09
SUSPENDED PLASTERBOARD CEILING
LEVEL 04 SSL 20.300
771
XT-02
THERMAL & VAPOUR PERMEABLE MEMBRANE
20 90
150
FS-09
FLASHING
3C
WEEPHOLES
FLASHING
FLASHING
150
SUSPENDED PLASTERBOARD CEILING
SUSPENDED ACOUSTIC TILE CEILING
MT-02
20
CL-06
20
258 110
CL-01
GROUND FFL01 7.250 LEVEL SSL 7.240
WEEPHOLES PAVING LEVEL VARIES 0C
258
CHURCH AREA
138C
WEEPHOLES PAVING LEVEL VARIES
COMMERCIAL OFFICE
FS-09
REFER LANDSCAPE DRAWINGS FOR PAVING
REFER TO LANDSCAPE DRAWINGS FOR PAVING DETAILS
1 3520 1 3570
1 : 10
Rev.
3520
Revision Description PRELIMINARY CD ISSUE PRELIMINARY CD ISSUE PRELIMINARY CD ISSUE
VERIFY DRAWING HAS BEEN PRINTEDGeneral TO SCALE. NotesDO NOT SCALE CRITICAL Date DIMENSIONS. CONTRACTOR SHALL VERIFY JOB DIMENSIONS BEFORE 26.04.2016 COMMENCING ANY WORK. WHERE SHOP DRAWINGS ARE TO BE SUBMITTED 17.05.2016 MANUFACTURE SHALL NOT COMMENCE BEFORE RETURN OF UNAMENDED 31.05.2016 SHOP DRAWINGS SIGNED BY RESPONSIBLE CONSULTANT. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS AND DRAWINGS. THIS DRAWING & DESIGN IS COPYRIGHT BY JOHN WARDLE ARCHITECTS.
FACADE SECTION DETAIL - BRICK FACADE
3 1501
1 : 10
Revision Description PRELIMINARY DD ISSUE FINAL DD ISSUE PRELIMINARY CD ISSUE PRELIMINARY CD ISSUE
Date 23.02.2016 29.02.2016 17.05.2016 31.05.2016
FACA 1 : 10
BRICK FACADE - CONDITION VARYING 1 : 10
25 Rokeby Street, Collingwood, V Tel : +61 3 8662 0400 © 2015 John Wardle Architects 0 mm
USE THESE MARKS TO CONFIRM DRAWING IS PRINTED TO SCALE
50
General Notes
PRINTED:
1 2 3
6/10/2016 9:30:48 AM
THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE
Rev. 1 2 3 4
110
2
1 : 10 2 3540
THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE
0 mm
FACADE SECTION DETAIL - RECLINED CURTAIN WALL-GRID C
FACADE SECTION DETAIL - BRICK FACADE
VERIFY DRAWING HAS BEEN PRINTED TO SCALE. DO NOT SCALE CRITICAL DIMENSIONS. CONTRACTOR SHALL VERIFY JOB DIMENSIONS BEFORE COMMENCING ANY WORK. WHERE SHOP DRAWINGS ARE TO BE SUBMITTED MANUFACTURE SHALL NOT COMMENCE BEFORE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED BY RESPONSIBLE CONSULTANT. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS AND DRAWINGS. THIS DRAWING & DESIGN IS COPYRIGHT BY JOHN WARDLE ARCHITECTS.
WEEPHOLES FLASHING 0C
150 mm on B1 sheet 61 mm on A3 sheet
USE THESE MARKS TO CONFIRM DRAWING IS PRINTED TO SCALE
150 mm on B1 sheet 61 mm on A3 sheet 300 mm on B1 sheet 121 mm on A3 sheet
300 mm on B1 sheet 121 mm on A3 sheet
D E TAI LS
www
IN OF F I CE
THE LAB | MELBOURNE Working at Detail 3 with Joost Bakker New train station in the heart of Frankston City Status: Benched Role: Concept design development and production of Schematic Design Report. This included the creation of a revit model, producing all schematic diagrams/imagery as well as formating and putting the report together. The Lab was a unique and ambitious project envisioned by Joost as a larger scale lexus pavilion. The concept was to create a largely modular ‘greenhouse’ that not only created zero waste, but also took waste from surrounding businesses and converted them into energy. The steel frame and glass building contained a mushroom clad event space, ground level f&B retail and offices on the second floor. The crowning jewel was a restaurant on the top floor that sourced all of its ingredients from the greenhouse. This included fish, mushrooms, vegetables and hanging grape vines that cascade down the facades of the building. To power all this, a generator fueled by recycled plastic was to be installed in the basement plant room while also drawing energy from solar panels placed on buildings nearby. The entire building was designed with sustainability and green practice in mind. It was intended to be an exemplar building that showcased what can be achieved in true sustainable architecture.
6.0
SUSTAINABILITY
EASTLAND LAB \ SCHEMATIC DESIGN REPORT
43
REN DER V S REVIT MODE L
IN OF F I CE
35 Collins Street Working at Grimshaw Architects Refurbishment of main lobby and office levels 3 - 21 Status: Under Construction Role: I was brought in just after concept phase of the project to help deliver the tender and construction documentation packages for levels 4-8. This involved working with service consultants and building contractors to get a fully resolved drawing set within budget. I completed onfloor demolition drawing packages, detail floor plans, elevations, amenities details and other miscellaneous details for the submission. From this we won levels 3 & 9 to level 21. I was then in charge of both the re-design of these levels and the documentation to construction stage while the remainder of the team focused on the ground floor lobby. The high level of detailing and quick turn around for levels was a major contributor to why we were awarded the rest of the building.
____________________
A08 02 1003
A09 02 1005
STONE THRESHOLD 1 PIECE
____________________
A09 02 1002
2
B79
EXTENT OF MOCK UP 6
2
____________________
A09 02 1002
____________________
A09 02 1003
B82
7
2
2
____________________
A09 02 1002
B85 8
C1
____________________
____________________
A09 02 1002
A09 02 1002
____________________
A08 02 1003
C1
____________________
A09 02 1005
ALIGN
3
____________________
ALIGN
ALIGN
A55
ALIGN
A09 02 1004
3
D.02
ALL SERV ENGINEER SPECIFICA
B88
1
____________________
A09 02 1005
800
900
D.03
D.04
A08 SK003 02 1001
CL 850
4
850
D.06 L04.05 LOBBY STN-100
A08 02 1003
3 ____________________
D.05
A08 SK003 02 1001
C1
D.07
D.08
D.09
650
A09 02 1005
4
VARIES
929
929
CL
EQ
C EQ L EQ C.O.S.
EQ
C.O.S. LIFT DIVIDING WALL
1
A08 02 1003
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
2
2
A09 02 1003
____________________
A08 02 1003
VARIES
____________________
A09 02 1005
____________________
EQ
5
____________________
A09 02 1004
LIFT LOBBY - PLAN 1
____________________
A08 02 1003
B73 LIFT OPENING
EQ
C.O.S. C L
EQ
EXTENT OF MOCK UP
B76
LIFT DIVIDING WALL
B79
LIFT DOOR
C.O.S. C EQ L EQ
LIFT OPENING
CL
EQ
EQ
2
B82
____________________
A08 02 1003
LIFT OPENING
EQ
EQ
B85 EQ
EQ
EQ
EQ
B88
EQ
EQ
EQ
EQ
VARIES
EQ
FCL 2932
1075
ALIGN
SP
SD
EL
SPR
ACT-102 FCL 2660
SD SPR SP
MS
MS
EL
SPR
MS SPR
SD
SPR
MS
350
MS
1075
150
ALIGN
ALIGN
ALIGN
ACT-102
EQ
351
1 : 50
C.O.S.
1
EQ
LIFT DOOR
3
____________________
C.O.S.
B76 5
____________________
650
B73 1
5
75 75 EQ EQ LIFT OPENING
250
250
75 C L 75 CL CL
C L C L CL
1
EQ
EQ
CL
250
75 C L 75 C LC L
250
C L C L C L
A08 02 1003
CEILING SET OUT POINT EQ CL
EQ
C L
250
75 C L75 CL C L
75 75 CL C L CL
250
CL C L C L
75 75 C LC L CL
____________________
A08 02 1003
LIFT LOBBY - RCP 1 : 50 1
____________________
A08 02 1003
B73
B76
B79
2
B82
____________________
A08 02 1003
1
B85
B88
4
____________________
____________________
A09 02 1003
A09 02 1003
20
A05 1005 1
EQ
2
____________________
2
75 C L 75 C LC L
241
FCL + 2932
D.02
D.03
ELECTRICAL ROOM
PHONE
MTL-101
MTL-101
MTL-101
FEMALE
D.04 DDA
530
PLAN
A09 02 1004
MTL-101 SWP
CL
900
1070
PHONE
300
WOD-100 1
____________________
1440
FCL + 2660
FFL
1
____________________
A08 02 1003
A08 02 1001 1
C L
EQ
2
____________________
A08 02 1003
LIFT LOBBY - ELEVATION 1 : 50
B88
B85
2
B82
____________________
A08 02 1003
B79
B76
B73
1
____________________
A08 02 1003
3
C1
____________________
A09 02 1004
241 20
3
EQ
EXTENT OF MOCK UP
FCL + 2931 FCL + 2660
2/03/2018 6:49:37 PM
1440
WOD-100
D.07 COMMUNICATION
MTL-101
MTL-101
MTL-101
530
MALE
MTL-101
PHONE
SWP
C L
300
D.08
1070
B2 STAIR FIRE EXIT
NOTE: • • • • •
ALL CEILING P CUT CEILING LIGHT FIXTUR CENTRE LINE ALL TILE JOIN THE TILE SIZE MODULE DOR CUT TILES AT
900
A09 02 1004
•
20
C:\Users\Jmortlock\Documents\16236_GAM_LOW-RISE_2018_jmortlock.rvt
D.09 4
____________________
GENERAL NOTE:
FFL
EQ
4 A08 02 1001 1
LIFT LOBBY - ELEVATION
2
____________________
A08 02 1003
EQ
CL
1
____________________
A08 02 1003
6
____________________
C1
A09 02 1004
1 : 50
L IF T LOB BY PL A N + EL EVAT I ONS
DRAWINGS HAVE PROVIDED BY TU PREPARED BY MI ARCHITECTS PRO THE INFORMATIO CURRENT CONDI
B85
B88
B91
B94
A52
B97
GRIMSHAW Architects
Telephone
+61 (03) 9321 2600
Address
21 Bouverie Street Melbourne VIC 3053 Australia
67 42
67 42
ALL SERVICES SHOWN INDICITAVE, REFER TO SERVICE ENGINEERS DOCUMENTATION FOR LOCATION AND SPECIFICATIONS
A55
www.grimshaw.global
A58
B82
INTELLECTUAL PROPERTY
T
T
© COPYRIGHT GRIMSHAW ARCHITECTS PTY LIMITED. UNLESS OTHERWISE AGREED IN WRITING; ALL RIGHTS TO USE THIS DOCUMENT ARE SUBJECT TO PAYMENT IN FULL OF ALL GRIMSHAW CHARGES; THIS DOCUMENT MAY ONLY BE USED FOR THE EXPRESS PURPOSE AND PROJECT FOR WHICH IT HAS BEEN CREATED AND DELIVERED, AS NOTIFIED IN WRITING BY GRIMSHAW; AND THIS DOCUMENT MAY NOT BE OTHERWISE USED, OR COPIED. ANY UNAUTHORISED USE OF THIS DOCUMENT IS AT THE USER’S SOLE RISK AND WITHOUT LIMITING GRIMSHAWS RIGHTS THE USER RELEASES AND INDEMNIFIES GRIMSHAW FROM AND AGAINST ALL LOSS SO ARISING
67 42
67 42
A61
B79
REV
67 42
67 42
A64
B76
1 2 C1
T
T
2
67 42
67 42
B73
C2
2
____________________
A13 02 2003
A67
____________________
A08 02 1001
T
DATE
FOR
31.01.2018 FOR TENDER 23.02.2018 FOR TENDER - LIFT LOBBIES & AMENITIES (LVL 4 - 8) 28.02.2018 ISSUE FOR CONSTRUCTION - ON FLOOR WORKS 02.03.2018 ISSUE FOR CONSTRUCTION - LIFT LOBBIES & AMENETIES
T
3
____________________
A08 02 1002
T
T
A73
T
T
L04.06 COMMS ROOM
L04.07 MALE AMENITES
T
L04.12 SERVICE RISER
U U
T
A76
U
8 36
U
LS
P
8 36 8 36
67 42
L04.05 LOBBY
T
CLIENT
AMP CAPITAL L04.09 FIRE STAIR B2
L04.11 SERVICE RISER
B64
A13 02 2003
67 42
67 42
T
____________________
67 42
67 42
4
L04.08 GOODS LIFT LOBBY
L04.02 ELECTRICAL ROOM
B67
A70
____________________
L04.03 FEMALE AMENITIES
T
6
P
U
LS
4
7 26
L04.04 DDA AMENITIES
U T
67 42
U
A13 02 2003
67 42
B70
L04.01 FIRE STAIR B1
U
PROJECT MANAGER
TURNER & TOWNSEND THINC 10th Floor, 136 Exhibition Street, Melbourne, VIC 3000
U T
U
SERVICE ENGINEER
R
67 42
T
NORMAN DISNEY & YOUNG
8 36
R C
L04.10 FEMALE AMENITIES
A43
T
67 42
B97
115 Batman Street, West Melbourne, VIC 3003
BUILDING SURVEYOR
PHILIP CHUN
T
Suite 3/5 Queens Rd, Melbourne, VIC 3004
A/P
1
____________________
A13 02 2003
DRAWING KEY
67 42
A/P
67 42
T
LS P
A46
B94
T
67 42
T
T
67 42
T
AREA OF PROPOSED WORKS
T
PROJECT
A49 B91 L4.01 OFFICE TENANCY
ADDRESS
35 Collins St, Melbourne, VIC 3000
1477 m²
FCL 2.700
A52
35 COLLINS
SEPERATE SCOPE OF WORKS T
B88
T
GRIMSHAW PROJECT NO.
16236
A55
NORTH
B85 SCALE
1 : 100
@ A1
A58 B82
T
STATUS
FOR CONSTRUCTION DRAWING
LEGEND:
A61 B79
A64
2/03/2018 6:42:39 PM
C:\Users\jmarcano\Documents\16236_GAM_LOW-RISE_2018_jmarcano.rvt
T
B AT H R O O M R EN D ER + OVE R A LL F LO OR PL AN
A67
A70
A73
A76
B73
B76
LEVEL 04 RCP AREA OUTSIDE OF SCOPE FOR THIS ISSUE
GENERAL NOTE: DRAWINGS HAVE BEEN PREPARED BASED ON INFORMATION PROVIDED BY TURNER AND TOWNSEND THINC ON 30-05-17 PREPARED BY MILLS GORMAN ARCHITECTS GRIMSHAW ARCHITECTS PROVIDES NO WARRANTY TO THE ACCURACY OF THE INFORMATION PROVIDED AS IT MAY NOT REFLECT CURRENT CONDITIONS ON-SITE.
DRAWN
CHECKED
AUTHORISED
BH
GS
SA
DRAWING NUMBER
A05 1005
REVISION
C2
TIL-100 BRING TILE BEHIND 100
TILES TO CONTINUE UP WALL INTO ALCOVE
100
STRIP LIGHTING TO NDY SIZE AND SPECIFICATION 100
RECESSED PELMET BOX TO ALLOW MIRROR TO BE REMOVED
GYP-100 ALIGN TOP OF MIRROR WITH CEILING
GLS-100 1350
REMOVABLE MIRROR VIA CLEATS ATTACHED TO SUBSTRUCTURE DETAIL TO BE PROVIDED BY CONTRACTOR
POWDERCOATED MATTE BLACK FRAME 45 DEGREE DIFFUSED LINEAR LED, REFER TO ELECTRICAL ENGINEER DETAIL
1 A13 02 1001 6
04 ELI TYPICAL VANITY MIRROR DETAIL 1:5
CL 50 GLS-100
TW-01 MOUNTING HEIGHT TO BE CONFIRMED WITH PROTOTYPE TO ENSURE MINIMUM SPLASH FX-01 CL
SOAP DISPENSER. ALLOW ADEQUATE SPACE BETWEEN DISPENSER BOTTLE BELOW COUNTER AND BASIN EDGE
45 DEGREE DIFFUSED LINEAR LED, REFER TO ELECTRICAL ENGINEER DETAIL
PNT-104 FOLDED METAL POWDERCOATED MATTE BLACK ON MARINE PLY OR SUFFICIENT WATERPROOF BOARD FIXED TO SUB FRAME METAL TO WRAP UNDER FRAME
304
3 20 194
STEEL BRACING WITH CONCEALED FIXING TO WALLS FOR ADDITIONAL SUPPORT
218
STN-100 MARBLE FINISH TO WRAP AROUND VANITY BENCHTOP
40
2-3mm SHADOW GAP/TOLERANCE
150
STN-100 MARBLE FINISH TO WRAP AROUND VANITY BENCHTOP
2/03/2018 6:29:12 PM
C:\Users\Jmortlock\Documents\16236_GAM_LOW-RISE_2018_jmortlock.rvt
TIL-100 ACCESS TO SINK
5 A13 02 1001 6
200 SHELF DEPTH
43 520
ELI TYPICAL VANITY DETAILS 1:5
VA NIT Y DE TAI L
ADDITIONAL PR OJE CT S
MIKE INNES HOUSE | VICTORIA Working at Detail 3 Town Planning + DD documentaion EASTBOURNE APARTMENTS | EAST MELBOURNE Working at Bates Smart DD documentation FRANKSTON STATION | FRANKSTON, MELBOURNE Working at Genton Architects Schematic design + BIM co-ordination + Creation of Revit model COLES DATA CENTRE, MELBOURNE Working at Genton Architects Tender Drawings + Construction Documentation 35 COLLINS PLACE OFFICE FLOOR REFURB | MELBOURNE CBD Working at Grimshaw Architects Tender Drawings + Construction Documentation
Jake Mortlock