Precast Issue 2 2016

Page 40

PROJECTS 38

CLINIC GETS SMART NEW PAVING Technicrete Stilfontein manufacturing

200 of the exterior of the building provides a reassuring and professional welcome for patients and visitors alike.

plant, and still met all delivery deadlines,”

The project team chose Double Zig-Zag

DZZ (Grey) 2 360m², 60mm DZZ (Slate)

crucial to Technicrete ISG and it’s critical

(DZZ), Trojan Square paving and kerbs

65m², 60mm DZZ (Tan) 65m², 60mm

that all walkways and kerbing are profes-

from CMA member, Technicrete, to

Trojan Square, as well as Fig7 semi-

sionally installed with a flawless and evenly

achieve the desired aesthetics, as well

mountable kerbs 96 x 1m.

laid finish.” added Steenkamp.

as provide the clinic with a long-lasting and durable solution for its traffic areas.

Quality first

This included paving and kerbs around

“The scheduling on this project was

walkways, parking and emergency drop-

extremely tight and we were pleased to

off zones where the installation needed

be able to meet all deadlines presented

to be professionally managed in order to

to us by the developer and building

provide a safe and attractive finish.

contr ac tor. We o v er came pr oduc t

The clinic required an area of 2 550m²

availability challenges and sourced the

to be paved. Technicrete supplied 80mm

correct quantities required from our

says Hendrik Steenkamp, Technicrete ISG sales consultant in Polokwane. “The safety of people who utilise parking and visitor areas at medical facilities is


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.