ipcm® Protective Coatings n. 34 - June 2020

Page 18

SUCCESS STORIES

Strength Within the System FreiLacke is the only company to supply both powder coatings and wet

associated wet coating, virtually eliminating any visible differences”. The

coatings in a combined system to the advanced TrainLab.

new product combination practically tested on the advanced TrainLab uses the ‘DW11’ wet coating system and the ‘PU6’ powder coating.

T

he final section of the advanced TrainLab – a middle carriage – has

Essentially, the system encompasses a water-based 2C polyurethane

been given a new decorative look and corrosion protection. This

coating and a polyurethane powder coating, which are highly resistant to

carriage is particularly special because one company, namely FreiLacke,

graffiti removal agents and other acids and alkaline cleaners. The

supplied both wet and powder coatings from a single source. “This is our

water-based coating offers another clear advantage: In the colouring

Unique Selling Proposition within the project,” stated Dr. Hilmar Weisse,

layer, the filler and base coat are combined in a single coating as base

Business Manager of Mobility Systems at FreiLacke. “As a coating systems

fillers. Using this base-filler coating dispenses with one of the coating

manufacturer we were able to carefully coordinate both coatings during

stages, resulting in shorter turnaround times. In addition, after a short

product development and production”. In the case of the powder coating

airing period of around an hour at room temperature, each coating

primer ‘Freopox PB6904’ and the PU powder coating top coat ‘PU6’ used

layer of the combi-system is ready for wet-on-wet coating. As a result,

in the current project, the respective authorisations were only recently

the three-coat coating system can be cross-linked over night at room

granted by Deutsche Bahn AG. Job coater Wobek Oberflächenschutz

temperature. However, should even quicker completion be required, the

GmbH from Stollberg, in the Ore Mountains, applied the coatings to the

coating can also be force-dried.

side flaps of the advanced TrainLab, which had been dismantled from the

“During product development we constantly kept the coating process

vehicle body for that purpose. Firstly, the flaps were chemically stripped

in mind,” explained Weisse. “Not only with regard to original coatings,

and then prepared for coating using a laser process.

but also in relation to repairs. Consequently, grinding our base-filler

However, for FreiLacke, the primary objective is to use the practical tests

coating will not alter the colour. The coating system can also be quickly

to become a full-service provider to the rail transport industry. “One of the

cross-linked without long waiting periods or the need for forced drying.

aspects for which our products are noted is their exceptional chemical

Particularly where remedial work is required, this saves both time and

resistance. The high gloss requirements imposed by DB are also ideally

energy.”

met by the powder and wet coatings,” explained Weisse. “Moreover, the innovative powder coating process is perfectly coordinated with the

Th The T h he pr priim ime m d fl flap ap p is pr prepa epa p rred d fo for or to op p co coa oa o a atin t g. tin g Pow wder de co coat ating at go on n the tth he h flaps apss is per perfec ectly ectly ly y co oor ord rrd dina nated ed d wi with th h tthe th h he e we wet coati wet oa oat atin in ing ng sy yste te em p prop ro rrop op pert ert er rties ie es. es

© FreiLacke

12

N.34 - 2020 JUNE - ipcm® Protective Coatings

For further information: www.freilacke.de


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.