1 minute read

Koenigsegg continues its expansion

Koenigsegg has big plans for their expansion which include an all-new state-of-the-art Gemera factory containing a high-tech production and assembly line, customer lounge, offices, event, showroom and retail spaces.

Advertisement

Koenigsegg’s development will also entail additional warehousing and pre-production spaces, the opening of a one-of-a-kind experience center, and a potential all-new on-site track.

In total, the expansion results in an on-site building footprint of over 30,000 square meters. Together with Koenigsegg’s 11,000 square-meter second facility in Ängelholm established last year, this means that Koenigsegg has enough room to grow its operations over the coming years. The new Gemera factory will be connected to Koenigsegg’s existing office building, and its four former air-force hangars turned high-tech production and assembly spaces.

It is specifically located on the grounds of Valhall park, on the former outdoor flight lines where fighter jets used to park. That is why future Koenigsegg cars produced at this new extension will continue to showcase the reputable Ghost badge that carries on the legacy of the legendary F10 Air Force Ghost Squadron that used to call this place home.

The exterior design of the new Gemera factory is inspired by the accordion-like layout of old Swedish factories where space and daylight are maximized. Inside, is an open but expandable space geared for growth which will accommodate the Gemera program.

The proximity of all of Koenigsegg’s facilities represents the company’s synergized and in-house approach to design, engineering, sourcing, production, assembly, prototyping, and research and deve- lopment. To further Koenigsegg’s activity, manicured and interactive green space featuring outdoor gyms, alfresco decking for staff dining, and tree pods for outdoor meetings in the warmer months will be added around the Koenigsegg facilities at Valhall park. To top things off as part of Koenigsegg’s aim to become CO2-neutral the company will install solar panels to the maximum extent allowed to further utilize the many flat roof areas of its unique facilities.

The company is also excited to announce

This article is from: