Literature Review on Industrial Process Optimization by Lean Manufacturing of Techniques

Page 5

International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538 Volume 10 Issue IV Apr 2022- Available at www.ijraset.com III.

RESULTS

A. Before

1) 2) 3) 4)

HV testing– cycle time 176 sec. Continuity Testing- cycle time 25.48 sec. Total production per month 4000 units avg. HSE Risk: Manual HV and continuity testing by hand

B. 1) 2) 3) 4)

After HV testing- cycle time 60 sec. Continuity Testing – Cycle time included in HV testing Total production per month 5500 units avg. HSE Risk: Automation in HV and Continuity Testing

©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 |

1265


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Literature Review on Industrial Process Optimization by Lean Manufacturing of Techniques by IJRASET - Issuu