Twisterband assembly instructions

Page 1

twisterband assembly

Dimensioning: Cable selection

!

TPE outer jacket

When selecting cables, pay attention particularly to good wear and glide properties. TPE is the ideal jacket material. Recommended: chainflex® cable CF9

We are currently developing special shielded cables to be used inside the twisterband. Please contact us if the use of shielded cables is required.

Dimensioning: Filling twisterband version with locking: TB20.44.18.x.01.0 TB30.75.22.x.01.0

twisterband version with easy-locking: TB12.23.09.x.01.0 TB20.44.12.x.01.0 Insert cables sorted according to min. 2 mm diameter and/or bending radius. Insert thin, small ones inward – then increasingly bigger ones outward.

min. 2 mm Separate cables with separators

min. 2 mm

min. 2 mm

Insert cables sorted according to diameter and/or bending radius. Insert thin, small ones inward – then increasingly bigger ones outward.

min. 4 mm

min. 2 mm

min. 4 mm Not more than two cables one upon the other. Between all cables 10% of the larger diameter or a minimum of 1 mm

min. 2 mm

min. 4 mm

min. 2 mm

Between all cables min. 1 mm or 10% of the larger diameter => Ø B

min. 2 mm

min. 2 mm Between all cables a minimum of 1 mm or 10% of the larger diameter Between all cables and separators 10% of the larger diameter or a minimum of 1 mm

min. 2 mm

min. 4 mm Not more than two cables one upon the other. Between all cables 10% of the larger diameter or a minimum of 1 mm


twisterband assembly

Installation: Mounting brackets

1. Insert twisterband between the steel parts.

2. Fixing of the twisterband with the mounting bracket by screwing.

Installation: Guide shaft

Insert a centric shaft as a guide in vertical installation position from 1500° rotation angle.

Basically, insert a centric shaft as support in horizontal installation position.

Installation: Strain relief

End position:

igus® GmbH Cologne plastics for longer life

®

The twisterband must not be twisted up to the end. To avoid immense strain on the cables, a reserve of min. 90° must be planned in front of each mounting point.

Phone: +49-2203-9649-800

www.igus.eu

MAT0071842.20

Apply strain relief on both ends of cables Ensure that the knot of the cable tie does not point toward the energy chain®


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.