ICW Technical Doc

Page 189

14.4

Item of construction to be quality checked

Builder Check

ICW Inspect

General - always refer to the ‘Superstructure to Upper Floors (02) check list’ in addition to this list. Items checked during this inspection will cover the quality of build and structural stability / future weather tightness of the structure from upper floor level to, but excluding, roof construction.

Floors - all floor substructures in place and constructed to comply with the Building Regulations and or the relevant British Standards, checks made for: Timber: - size, centres, spans and grading of joists - damaged units - fixings and bearings - multiple and trimming members - restraint straps and noggins Concrete: - size and bearing of units - no cavity obstructions - trimming of openings Party floors: - joints filled - correct density - floating layer - junctions detailed Adequate support to internal partitions Service entries filled

NB where there is a

in the ICW Inspect column, these items will be inspected where available to be seen at the time of inspection.

158


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.