2H. KEY INITIATIVES
2021/22 2022/23 Source / contributing document/s
Source code/s
Investigate options for electric vehicle charging stations on public land
√
2H.3
Undertake cycling participation survey
√
Integrated Land Use and Transport Strategy
2H.4
Install energy efficient and/or renewable energy measures, eg. solar panels, at Hornsby Aquatic and Leisure Centre
√
Section 7.12 Plan
2H.5
Install energy efficient and/or renewable energy measures, eg. solar panels, at the Community Recycling Centre at Thornleigh
√
Section 7.12 Plan
2H.6
Investigate and install solar on Council facilities
√
√
Climate Wise Hornsby Plan
C1.5
2H.7
Incorporate carbon zero processes into the design, development and ongoing use of town centres (ie. Hornsby Town Centre), eg. building materials, waste generation and disposal, energy production on scale
√
√
Climate Wise Hornsby Plan
C2.12
2H.8
Review, update and implement Sustainable Energy for new Council Assets Policy
√
Climate Wise Hornsby Plan
TEI4 HWECO7
2H.9
Implement urban heat clauses in the Local Strategic Planning Statement, LEP and DCP
√
Climate Wise Hornsby Plan
HWAE1
2H.10 Participate in "Measure metropolitan carbon emissions" and report on progress – Action 13 Resilient Sydney Strategy
√
Climate Wise Hornsby Plan
TE14
2H.11 Participate in "Get Prepared" – Action 23 Resilient Sydney Strategy
√
Climate Wise Hornsby Plan
HWAE1 HWAECO6
2H.12 Ensure sea level rise is included in the development of the Coastal Management Program
√
Climate Wise Hornsby Plan
SLDI1 SLCI2
2H.13 Ensure Asset Management Plans incorporate climate change projections and risk assessment
√
Climate Wise Hornsby Plan
ERAI14 ERAE15
2H.14 Travel Demand Management Action Plan: Develop and implement educational and information campaign focusing on why car use should be reduced and how it should be reduced
√
Integrated Land Use and Transport Strategy
2H.15 Travel Demand Management Action Plan: Ensure principles of travel demand management are incorporated in all aspects of land use, transport planning and traffic engineering activities
√
Integrated Land Use and Transport Strategy
2H.2
PAGE 70 OF 146
√
Integrated Land Use and Transport Strategy Car Parking Management Study
HORNSBY SHIRE COUNCIL