Table A1 (continued) Daily Operation Log Sheet
Date/Time
10/06/99 3:00 a.m. 10/06/99 11:00 a.m. 10/06/99 7:00 p.m. 10/07/99 12:00 p.m. 10/07/99 7:00 p.m. 10/08/99 3:00 a.m. 10/08/99* 12:00 p.m. 10/08/99 12:40 p.m. 10/08/99 12:50 p.m. 10/08/99 1:00 p.m.
Incoming Water Temperature ΕF
Enertec DC Amps
Supply Steam PSIG
HE #1 Water Temp ΕF Mag Ctrl
HE #1 Flow Rate GPM Mag Ctrl
HE #2 Water Temp ΕF Mag Ctrl
HE #2 Flow Rate GPM Mag Ctrl
HE #3 Water Temp ΕF Elect Ctrl
HE #3 Flow Rate GPM Elect Ctrl
66
0.6
118
104
118
2.2
2.2
110
104
2.0
2.1
107
109
1.9
2.0
64
0.5
120
98
102
2.2
2.2
104
105
2.0
2.0
104
106
2.0
2.1
66
0.6
122
100
106
2.1
2.0
112
106
2.0
2.0
107
108
2.0
2.0
63
0.6
121
96
103
2.5
2.3
114
102
2.2
2.1
104
102
2.0
2.1
63
0.6
121
104
108
2.0
2.1
116
108
2.2
1.9
110
110
1.9
1.8
63
0.6
124
102
106
2.0
2.0
112
107
1.8
1.9
109
108
1.8
1.7
62
0.6
122
101
106
2.0
2.0
102
108
2.0
2.0
102
102
2.0
2.0
62
0.6
122
102
108
2.0
2.0
101
107
2.0
2.0
102
102
2.0
2.0
62
0.6
114
94
98
3.0
3.0
92
95
3.0
3.0
94
93
3.0
3.0
62
0.6
121
106
110
2.0
2.0
102
106
2.0
2.0
102
100
2.0
2.0
*Water samples collected Flow increased to −3 GPM at 4 p.m., then readjust to 2 GPM after water pressure is stable −6 p.m.
A7