Summer Messenger 2021

Page 5

Project Updates

Playground replacement scheduled at Plum Valley Park Brand new playground equipment is coming to Plum Valley Park this fall. Beginning Aug. 9, the playground will be closed for construction through mid-October, weather permitting. The project is part of the Metro District’s Capital Improvement Plan that aims to replace one playground each year, pending budget approval and availability of funds.

Fly’n B Park improvements currently in design stage Metro District staff is in the process of coordinating the design of improvements to Fly’n B Park. An architect has been hired to complete the structural analysis and design of improvements to the house, which was originally built in 1906. These improvements will allow public use for small events, along with recreation programs and activities offered by the Metro District. Site improvements for access and additional parking are also being designed. When the design of both house and site improvements is complete, landscape improvements will follow. The construction of these improvements is scheduled to start later this year.

Metro District staff sought user input on the new Plum Valley Park playground design and held an on-site meeting with residents in March. Based on feedback, some of the new features of the playground will include: • • • • • •

Zip Track playground zipline Swings, including an accessible swing Rubber surfacing around the main play structure Variety of slides Sensory panels Climbing elements

The previous playground equipment was installed when the park was built in 1993. Plum Valley Park is located at 10230 Westridge Village Parkway in Highlands Ranch. Project updates will be posted to highlandsranch.org.

Fly’n B Park is open from 5 a.m. to 11 p.m. daily and is located at 2910 W. Plaza Dr. The park offers fishing, trails, a large shelter, picnic tables and restroom.

Senior Center conceptual planning underway The Metro District Board of Directors, at their March board meeting, approved funding to proceed with conceptual site planning for the future Highlands Ranch Senior Center. The Senior Center will be located on the south side of Highlands Ranch Parkway, east of the Broadway intersection. Preliminary conceptual plans for site development are underway, including access, grading, parking, building location and utility work. To learn more, visit highlandsranch.org/seniorcenter.

Summer ‘21

Skating, scootering and riding in style

5

Messenger

New ramps were installed at Tanks Skate Park, 10371 S. Broadway, this spring. Since reopening to users in April, residents of all ages have enjoyed the new half pipe and other ramp features, including the improved flow between the elements. The equipment was designed primarily for beginning and intermediate skaters and riders.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.