1 minute read

1.3 Warranty and liability

1.3 Warranty and liability

The CE mark shows that the loader has been manufactured in accordance with the applicable Ec directives.

NOTE

The manufacturer / supplier cannot be held liable for damages resulting from improper use of the loader. In such cases the full risk is borne by the operator / user.

Please note the following points:

• do not make any changes to the loader. • Only use attachments approved by WACKER NEUSON for your loader. • The loader must only be started up, operated and serviced in the manner described in the operator’s manual. • Only use the loader if all of the safety devices and protection devices are intact. • Observe the monitoring systems during operation. • repairs must only be carried out by trained specialists. • closely follow all instructions in the operator’s manual.

NOTE

This operator's manual must always be kept either on the loader or at the point of use. Place the operator's manual in the document pocket at the side of the driver's platform.

Fig. 1 Document pocket

EC Declaration of Conformity

Manufacturer

Weidemann GmbH, mühlhäuser Weg 45-49, 34519 diemelsee, Germany

Product

Wheel loader

r rL20 L20 1160 WL20 23,4 17,9 / 23,4 98,4 98,8/ 98,4 101 101

Vehicle designation Type/Version Trade name chassis number Power kW measured sound power level dB(a) guaranteed sound power level dB(a)

Conformity assessment procedure

in accordance with 2000/14/ec annex Vi

Office named in the procedure

europäisch notifzierte Stelle, Kenn-Nr. 0515 dguV Test, Prüf- u nd Zertifizierungsstelle, Fachbereich Bauwesen Landsberger Straße 309, 80687 münchen, Germany

Directives and standards applied

We hereby declare that this product satisfies the relevant provisions of these directives: dIN EN 474-1 and 3 2006/42/eg, 2000/14/eg, 2004/108/eg, diN eN iSo 12100 and

Authorised representative for the compilation of the technical file

Jolanthe Wydra, secretary to the head of technology Weidemann GmbH 45-49 g mühlhäuser We 34519 diemelsee y German diemelsee-Flechtdorf, 28.09.2012 Hans Heinrich Schmidt

director

Bernd Apfelbeck

director

This article is from: