
1 minute read
Work Procedure
(2) a lternating returning plowing pattern
This pattern is useful for narrow or short fields or poorly planned fields in which are not easy to turn.
In the figure, the plowing width for (1), (), (3) and (4) should be overlapped with the one for (5), (6) and (7) for approx. 10 cm.
For the sections (1) to (7), perform plowing in an alternating pattern. For the sections (8) to (19), plow in a circular pattern. Refer to the sequential returning pattern for other details.
(3) land leveling pattern
The land leveling work may be performed after crushing soil or not.
The vehicle speed can be set faster when performing the land leveling work with soil crushed already.
When working in a wet field, fill the field with a sufficient amount of water so that the trace of plowing cannot be seen.
The border shown in the figure should be set a little narrower than two times of one plowing width.
Refer to the alternating returning pattern for other details.