1 minute read

Head Clearance 79.3 inch (2015 mm

Group 01, Periodic Service

ITEM WORK REQUIRED Interval in Hours 8 30 120 240 360 720 1440 Interval in Days/Weeks/Months 1d 1w 1m 2m 3m 6m 12m

7.7 Check horn button for operation X 7.8 Check lift/lower control for operation X 7.9 Check for connections in harness connectors X 8 Battery 8.1 Check electrolyte level (0.5-0 cell plates) .625 inch (12-15 mm) above X 8.2 Check all connections: battery, battery and charger plugs X 8.3 Check all cell and link covers intact X 8.4 Check battery specific gravity X 8.5 Check overall condition of battery X 8.6 Check battery rollers and stops X 9 Instrument Panel 9.1 Check battery level and hourmeter for correct operation X 10 Controller (Traction, Pump, EPS) 10.1 Cleaning and check mounting to chassis X 10.2 Check tightness on all connections X 10.3 Inspect contact tips for burnt or pitted surfaces X 10.4 Check contactor tips for free movements X 10.5 Check all cable insulation for damage X 10.6 Clean and inspector controller X 11 Hydraulic System 11.1 Check hoses and connections for leakage X 11.2 Check hoses for wear and damage X 11.3 Check oil tank for cracks, leaks and mounting X 11.4 Check correct oil level X 11.5 Change hydraulic oil X 11.6 Check for oil leakage X 12 Mast 12.1 Check for damage and cracks X 12.2 Retighten mast mounting bolts X 12.3 Check clearance of the rollers X 12.4 Check lateral play of inner section 12.5 Clean and lube lift chains X 12.6 Clean and lube mast columns X 13 Lifting Device 13.1 Check clearance of platform X 13.2 Check platform for damage and cracks X

SM 844 01-2-3

This article is from: