1 minute read

Operation

N

M P P

M N

–Fit pins (M) on levers with spring clips (L). –Slide right and left levers (N) onto bale twister pins. –Fasten levers (N) with spring clips (P). (Fig.12)

12

Operation

Handling bale twister is explained in the paragraph "OPERATING BALE TWISTER", page93.

This article is from: