
1 minute read
STORING THE MACHINE
ALTERNATOR Service specifications
Check..........................................................................................Every 1000 hours
WARNING: Whenever carrying out a welding operation on the machine (authorised by the manufacturer and in accordance with his instructions) or any repairs on the electrical system, disconnect the B+ and D+ wires from the alternator. When reconnecting, check the markings on the wires.
Ask your CASE Dealer to check the alternator. NOTE: Make sure that the terminal protectors are correctly installed.
STARTER MOTOR Service specifications
Check..........................................................................................Every 1000 hours Ask your CASE Dealer to check the starter motor. NOTE: Make sure that the terminal protectors are correctly installed.
217
TRIM THIS EDGE RIGHT PAGE TRIM THIS EDGE