RAIN SCREENS
• Layer on WRB. Layer in a shingle method starting at the bottom and lapping top over bottom.
4
1
• Install vertical furring strips to correspond with the framing method (aligned with vertical framing members). • Use untreated 1x4 battens.
2 • Cut pieces of Cor-A-Vent SV-5 to fit flush in between furring strips below the window.
3
Best Practices Manual: Rain Screens July 2014
39