Pennine Stone TecCast TecLite TecLite TecStone Pennine Stone Pennine Stone TecCast TecLite
PENNINE
TecStone Pennine Stone TecCast TecLite TecStone Pennine Stone TecCast TecLite TecStone Pennine Stone TecCast TecLite TecStone TecStone Pennine Stone TecCast TecLite TecStone Pennine Stone
TecCast TUSCAN COLUMNS
150
PK06
22.2kg
Approximate 50mm hole cast through the capital as shown for fixing purposes. See Data Sheet T6 for fixing details.
200
PK22
150
350
‘Half’ Column
PK21
705
Typical arrangement and details
14.0kg
705
254
PK05
86.6kg
51.9kg
Plan
PK03, 04 and 05 have profiled bases for location into lower section.
156.1kg/m
150
397.5kg/m
Lifting Insert
430
430
Elevation
705
26.6kg
430
PK01
101.2kg/m
PK18
450 (maximum)
47.1kg
PK19
Allow 10mm for bedding joint.
406
PK02
Note: PK01, 03, 16 and 18 heights can be reduced to suit individual needs.
B
Section A
PK17
221.8kg/m
240
Elevation
430
305
61.6kg
150
PK03
705 (maximum)
AA
PK20
450 (maximum)
102.3kg
Lifting insert to top of all units over 40kg, dowel hole to top of all units under 40kg. Dowel hole to bottom of all units. Lifting insert to be used for fixing detail. Place loose dowel into lifting insert and fill with epoxy resin.
705 (maximum)
705
PK04
Plan
Lifting Insert
240
Section B
43 “Specifiers prefer BBA approved products” Pennine_Cat_March08.indd 41
26/03/2008 12:01:59