Final reports - ARRA funded closures

Page 24

ANALYTICAL RESULTS BAR080410-001 (GRAB) DEPTH 3.5’ BGS TIME 12:10 ANALYTES: DRO 4.81 mg/kg

FENCELINE

BAR080410-002 (GRAB) DEPTH 9’ BGS TIME 14:40 ANALYTES: ALL, ND

PUMP STATION AST

BAR080410-003 (COMPOSITE) DEPTH 1’ BGS TIME 16:28 ANALYTES: DRO 9.75 mg/kg

OLD GENERATOR PAD SIX INCHES TOP SOIL ABOVE CONCRETE SLAB

COMPOSITE SAMPLES LOCATIONS

SOIL STOCK PILE GENERATOR BUILDING

BAR080410-003 (COMPOSITE) DEPTH 1’ BGS

GATE

GATE EXCAVATED AREA

GRAB SAMPLE LOCATIONS BAR080410-001 (GRAB), DEPTH 3.5’ BGS BAR080410-002 (GRAB), DEPTH 9’ BGS

APPROXIMATE SCALE FEET 0

apec allied pacific environmental consulting

12.5

TITLE: SITE PLAN INDICATING SAMPLE LOCATIONS AND ANALYTICAL RESULTS PROJECT: BARRIGADA UST SITE INVESTIGATION

FIGURE: 3